Utility Commission
Regular MeetingLittle Chute, WI · January 16, 2023
Agenda
AGENDA
VILLAGE OF LITTLE CHUTE UTILITY COMMISSION MEETING
PLACE: Little Chute Village Hall, Board Room
DATE: Tuesday, January 16, 2023
TIME: 5:00 p.m.
Join Zoom Meeting: https://us06web.zoom.us/j/83035315930
Meeting ID: 830 3531 5930
Dial by your location: +1 312 626 6799 US (Chicago)
A. Call to Order
B. Roll Call
C. Public Appearance for Items Not on the Agenda
────────────────────────────────────────────────────────────
1. Approval of Minutes of December 19, 2023
2. Discussion—Nestle Meter Update
3. Progress Reports
a. MCO Operations Update
b. Director of Public Works
c. Finance Director
4. Approval of Vouchers
5. Unfinished Business
6. Items for Future Agenda
7. Adjournment
Requests from persons with disabilities who need assistance to participate in this meeting should be made with as much
advance notice as possible to the Clerk's Office at 108 West Main Street, (920) 423-3852
Prepared: January 11, 2024
MINUTES OF THE UTILITY COMMISSION MEETING OF DECEMBER 19, 2023
Call to Order
The Utility Commission meeting was called to order at 5:00 PM by Kevin Coffey, Chair
Roll Call
PRESENT: Kevin Coffey, Chair
Tom Buchholz
Mike Vanden Berg
Ken Verstegen
Jessica Schultz
ALSO PRESENT: Kent Taylor, Lisa Remiker-Dewall, Beau Bernhoft, Jerry Verstegen with MCO
Public Appearance for Items Not on the Agenda
None
Approval of Minutes from the Utility Commission Meeting of November 21, 2023
Moved by K. Coffey, seconded by K. Verstegen to Approve Minutes from the Utility Commission of
November 21, 2023.
4 Ayes (Schultz Abstain) – Motion Carried
Discussion – Nestle Meter Update
Director Taylor discussed options to put meter downstream of meter that Nestle has in place to measure sewer,
will not work as it is a T section and would pick up flow from Trailer Park and other areas to north. Looking at
options off Washington Street.
Discussion/Action – Private Well Permits Approvals
Mr. Verstegen explained six private wells looking for renewal of permits, every 10 years have to be certified by
a licensed well driller (cost of this is on the well owner)
Moved by J. Schultz, seconded by T. Buccholze to Approve Private Well Permits
All Ayes – Motion Carried
Progress Reports
MCO Operations – Mr. Verstegen processed approximately 30 calls (50% did not have lead issues but
were just confused, provided educational materials in person). Anyone that tested was under the action
level. All conversations have been cordial.
Director of Public Works – Continue to work on I41 expansion, looking at lateral damage from TDS
work and getting those fixed, found another issue with sanitary issue from nursing home (flushing adult
wipes) so contacted them of the violation, turn over in staff appears to be issue.
Finance Director – Discussed financials, sewer rate study and Karen’s work on paperless billing push
to save postage getting good results!
Approval of Vouchers
Moved by T. Buchholz, seconded by J. Schultz, to Approve and Authorize payment of Vouchers and draw
from the respective funds.
All Ayes – Motion Carried
Unfinished Business
Items for Future Agendas
None
Closed Sessions
a. 19.85(1)(g) Conferring with legal counsel for the governmental body who is rendering oral or
written advice concerning strategy to be adopted by the body with respect to litigation in which it
is or is likely to become involved. Utility Matter on OO
b. 19.85(1)(e) Deliberating or negotiating purchasing of public properties, the investing of public
funds, or conducting other specified public business, whenever competitive or bargaining reasons
require a closed session. Utility Connection Request
Moved by K. Coffey, seconded by J. Schultz, to Enter Closed Session at 5:15 p.m.
All Ayes – Motion Carried
Return to Open Session
Moved by K. Coffey, seconded by J. Schultz, to Exit Closed Session at 5:30 p.m.
All Ayes – Motion Carried
Potential Action - Utility Matter
Moved by K. Coffey, seconded by J. Schults to recommend staff follow up with legal notification to send
second letter with deadlines for removal of water main connections between parcel 260090400 and
260090500 on connection per PSC notification.
All Ayes – Motion Carried
Adjournment
Moved by J. Schultz seconded by K. Coffey to Adjourn Utility Commission Metting at 5:31 p.m.
VILLAGE OF LITTLE CHUTE
By: ___________________________________
Kevin Coffey, Chair
Attest:
Laurie Decker, Village Clerk
Item For Consideration
For Commission Review On: January 16, 2024 Prepared On: January 8, 2024
Agenda Item Topic: Nestle Sewer Meter Prepared By: Finance & DPW
Report: On January 8, the Village received the December meter report from Nestle (inception
to date reads attached). It was noted by Nestle in the January 8 email, “Attached is the meter
report through December. This is the final report for 2023. A new report starts for 2024. No
issues were noted during the month.”
At the June 20 meeting, the action taken stated Nestle was to be invoiced at 68.7% of water
consumption until reliable meter history can be accumulated for one year. Each month we
provide you with updated meter reports in comparison to water usage.
Fiscal Impact: Sewer Utility industrial revenues and equity considerations to ratepayers.
Recommendation/Board Action: Continued monitoring and documentation.
Respectfully Submitted,
Lisa Remiker-DeWall, Finance Director
Kent Taylor, Department of Public Works Director
Village Invoice Nestle Adjusted
Based on Sewer Metered
Meter Read Dates Water Volume Meter Sewer
12/9/22 to 1/6/23 3,465,852 2,467,630 71.20% Missing 12/18,12/19, and 12/31; 88,129 was average* 2,732,017 78.83%
1/7/23 to 2/8/23 3,920,323 2,637,122 67.27% 82,410 average 2,637,122 67.27%
2/9/23 to 3/8/23 3,196,009 1,507,659 47.17% 55,839 average 1,507,659 47.17%
3/9/23 to 4/7/23 3,413,947 2,552,022 74.75% Missing 3/21 & 3/22, 91,143 was average* 2,734,308 80.09%
13,996,131 9,164,433 65.48% 9,611,106 68.67%
4/08/23 to 5/09/23 4,544,815 0.00% Meter malfunctioning so data not available
5/10/23 to 6/09/23 4,134,641 0.00% Meter malfunctioning so data not available
6/10/23 to 7/06/23 3,973,184 0.00% Meter malfunctioning so data not available
7/07/23 to 8/08/23 5,202,565 0.00% Inaccurate data for part of the period
8/09/23 to 9/07/23 4,662,383 1,786,034 38.31% 61,587 average
9/08/23 to 10/06/23 4,416,942 1,376,796 31.17% 49,171 average
10/07/23 to 11/07/23 4,364,126 1,576,548 36.13% 50,856 average
11/08/23 to 12/07/23 3,386,644 1,037,675 30.64% 35,781 average
Note: In majority of months, Water consumption has increased while sewer meter readings have decreased
Monthly Production December 2022
Date Effluent Flow Meter Future Future Total
Monthly Statistics 1
Total 1,182,320 2
Days Pumped 16 3 43,771 43,771
Average 73,895 4 65,027 65,027
5 76,295 76,295
Maximum Total 130,532 6 68,094 68,094
on Day 17 7 62,450 62,450
Minimum Total 28,101 8 88,028 88,028
on Day 9 9 28,101 28,101
10 118,574 118,574
11 76,748 76,748
12 79,349 79,349
Daily Statistics 13 60,989 60,989
Maximum 130,532 14 62,090 62,090
Minimum 28,101 15 66,972 66,972
16 67,603 67,603
17 130,532 130,532
18 87,697 87,697
Location Statistics 19
Maximum 1,182,320 20
at Location Effluent Flow Meter 21
Minimum 0 22
at Location Future 23
24
25
26
27
28
29
30
31
Totals 1,182,320 0 0 1,182,320
Total Cost $4,185.06 $0.00 $0.00 $4,185.06
Day lag in December data 12/9-12/17 866,683
Per Nestle, communication issue with meter and when it re-connected it started the report over instead of adding days thus two reports for December 2
Monthly Production December 2022
Date Effluent Flow Meter Future Future Future Total
Monthly Statistics 1
Total 1,051,285 2
Days Pumped 11 3
Average 95,571 4
5
Maximum Total 228,502 6
on Day 24 7
Minimum Total 49,858 8
on Day 26 9
10
11
12
Daily Statistics 13
Maximum 228,502 14
Minimum 49,858 15
16
17
18
Location Statistics 19
Maximum 1,051,285 20
at Location Effluent Flow Meter 21 71,802 71,802
Minimum 0 22 57,716 57,716
at Location Future 23 112,093 112,093
24 228,502 228,502
25 51,354 51,354
26 49,858 49,858
27 84,520 84,520
28 59,806 59,806
29 74,032 74,032
30 74,604 74,604
31 186,998 186,998
Totals 1,051,285 0 0 0 1,051,285
Total Cost $0.00 $0.00 $0.00 $0.00 $0.00
Day lag in December Data 12/20-12/30 1,051,285
Per Nestle, communication issue with meter and when it re-connected it started the report over instead of adding days thus two reports for December 2022
Monthly Production January 2023
Date Effluent Flow Meter Future Future Future Total
Monthly Statistics 1 55,096 55,096
Total 2,821,042 2 79,627 79,627
Days Pumped 31 3 71,780 71,780
Average 91,001 4 74,362 74,362
5 127,906 127,906
Maximum Total 169,819 6 140,891 140,891
on Day 20 7 60,021 60,021
Minimum Total 49,720 8 76,495 76,495
on Day #N/A 9 91,942 91,942
10 96,018 96,018
11 82,938 82,938
12 97,464 97,464
Daily Statistics 13 137,320 137,320
Maximum 169,819 14 90,404 90,404
Minimum 49,720 15 87,419 87,419
16 69,987 69,987
17 124,070 124,070
18 72,637 72,637
Location Statistics 19 67,536 67,536
Maximum 2,821,042 20 169,819 169,819
at Location Effluent Flow Meter 21 61,689 61,689
Minimum 0 22 56,234 56,234
at Location Future 23 63,174 63,174
24 143,078 143,078
25 120,575 120,575
26 99,809 99,809
27 156,952 156,952
28 75,755 75,755
29 56,671 56,671
30 49,720 49,720
31 63,653 63,653
Totals 2,821,042 0 0 0 2,821,042
Total Cost $0.00 $0.00 $0.00 $0.00 $0.00
1/1 to 1/6 549,662
1/7-131 2,271,380
Monthly Production February 2023
Date Effluent Flow Meter Future Future Future Total
Monthly Statistics 1 37,435 37,435
Total 1,370,007 2 34,641 34,641
Days Pumped 28 3 92,599 92,599
Average 48,929 4 32,644 32,644
5 32,275 32,275
Maximum Total 98,904 6 49,242 49,242
on Day 24 7 46,808 46,808
Minimum Total 29,492 8 40,098 40,098
on Day 25 9 40,539 40,539
10 68,996 68,996
11 39,086 39,086
12 50,487 50,487
Daily Statistics 13 37,265 37,265
Maximum 98,904 14 43,342 43,342
Minimum 29,492 15 43,247 43,247
16 37,189 37,189
17 73,279 73,279
18 45,067 45,067
Location Statistics 19 46,605 46,605
Maximum 1,370,007 20 59,001 59,001
at Location Effluent Flow Meter 21 39,897 39,897
Minimum 0 22 55,253 55,253
at Location Future 23 45,839 45,839
24 98,904 98,904
25 29,492 29,492
26 36,244 36,244
27 60,364 60,364
28 54,169 54,169
29
30
31
Totals 1,370,007 0 0 0 1,370,007
Total Cost $0.00 $0.00 $0.00 $0.00 $0.00
2/1/23-2/8/23 365,742
2/9/23-2/28/23 1,004,265
Monthly Production March 2023
Date Effluent Flow Meter Future Future Future Total
Monthly Statistics 1 56,928 56,928
Total 2,312,585 2 94,517 94,517
Days Pumped 29 3 97,536 97,536
Average 79,744 4 38,933 38,933
5 53,126 53,126
Maximum Total 137,024 6 54,581 54,581
on Day 24 7 56,299 56,299
Minimum Total 35,349 8 51,474 51,474
on Day 12 9 52,174 52,174
10 89,127 89,127
11 57,607 57,607
12 35,349 35,349
Daily Statistics 13 43,359 43,359
Maximum 137,024 14 47,066 47,066
Minimum 35,349 15 40,487 40,487
16 46,950 46,950
17 108,445 108,445
18 121,585 121,585
Location Statistics 19 85,490 85,490
Maximum 2,312,585 20 94,283 94,283
at Location Effluent Flow Meter 21
Minimum 0 22
at Location Future 23 112,840 112,840
24 137,024 137,024
25 114,497 114,497
26 91,880 91,880
27 94,412 94,412
28 116,498 116,498
29 104,071 104,071
30 104,934 104,934
31 111,113 111,113
Totals 2,312,585 0 0 0 2,312,585
Total Cost $0.00 $0.00 $0.00 $0.00 $0.00
3/1/23-3/8/23 503,394
3/9/23-3/31/23 1,809,191
Monthly Production April 2023
Date Effluent Flow Meter Future Future Future Total
Monthly Statistics 1 101,181 101,181
Total 896,364 2 98,423 98,423
Days Pumped 30 3 112,141 112,141
Average 29,879 4 108,780 108,780
5 99,425 99,425
Maximum Total 128,046 6 94,835 94,835
on Day 7 7 128,046 128,046
Minimum Total 118 8 118,656 118,656
on Day 17 9 31,671 31,671
10 172 172
11 181 181
12 187 187
Daily Statistics 13 186 186
Maximum 128,046 14 186 186
Minimum 118 15 196 196
16 157 157
17 118 118
18 134 134
Location Statistics 19 124 124
Maximum 896,364 20 156 156
at Location Effluent Flow Meter 21 148 148
Minimum 0 22 134 134
at Location Future 23 128 128
24 131 131
25 135 135
26 143 143
27 158 158
28 162 162
29 141 141
30 129 129
31
Totals 896,364 0 0 0 896,364
Total Cost $0.00 $0.00 $0.00 $0.00 $0.00
4/1/233-4/7/23 742,831
Monthly Production May 2023
Date Effluent Flow Meter Future Future Future Total
Monthly Statistics 1 125 125
Total 11,304 2 139 139
Days Pumped 31 3 146 146
Average 365 4 166 166
5 164 164
Maximum Total 6,110 6 168 168
on Day 11 7 173 173
Minimum Total 125 8 158 158
on Day 1 9 174 174
10 189 189
11 6,110 6,110
12 183 183
Daily Statistics 13 180 180
Maximum 6,110 14 161 161
Minimum 125 15 170 170
16 178 178
17 152 152
18 169 169
Location Statistics 19 173 173
Maximum 11,304 20 175 175
at Location Effluent Flow Meter 21 187 187
Minimum 0 22 190 190
at Location Future 23 195 195
24 168 168
25 167 167
26 173 173
27 179 179
28 187 187
29 195 195
30 204 204
31 206 206
Totals 11,304 0 0 0 11,304
Total Cost $0.00 $0.00 $0.00 $0.00 $0.00
Monthly Production June 2023
Date Effluent Flow Meter Future Future Future Total Total Cost
Monthly Statistics 1 207 207 $0.00
Total 917,262 2 889 889 $0.00
Days Pumped 30 3 45,904 45,904 $0.00
Average 30,575 4 195 195 $0.00
5 198 198 $0.00
Maximum Total 114,514 6 186 186 $0.00
on Day 9 7 29,795 29,795 $0.00
Minimum Total 186 8 56,576 56,576 $0.00
on Day 6 9 114,514 114,514 $0.00
10 84,956 84,956 $0.00
11 40,159 40,159 $0.00
12 55,505 55,505 $0.00
Daily Statistics 13 51,825 51,825 $0.00
Maximum 114,514 14 40,632 40,632 $0.00
Minimum 186 15 37,314 37,314 $0.00
16 25,680 25,680 $0.00
17 14,526 14,526 $0.00
18 16,870 16,870 $0.00
Location Statistics 19 15,942 15,942 $0.00
Maximum 917,262 20 26,446 26,446 $0.00
at Location Effluent Flow Meter 21 20,807 20,807 $0.00
Minimum 0 22 22,826 22,826 $0.00
at Location Future 23 28,301 28,301 $0.00
24 24,682 24,682 $0.00
25 17,522 17,522 $0.00
26 26,120 26,120 $0.00
27 21,929 21,929 $0.00
28 24,848 24,848 $0.00
29 43,478 43,478 $0.00
30 28,430 28,430 $0.00
31 #VALUE!
Totals 917,262 0 0 0 917,262
Total Cost $0.00 $0.00 $0.00 $0.00 $0.00
Monthly Production July 2023
Date Effluent Flow Meter Future Future Future Total Total Cost
Monthly Statistics 1 19,755 19,755 $0.00
Total 1,647,985 2 17,354 17,354 $0.00
Days Pumped 31 3 17,989 17,989 $0.00
Average 53,161 4 3,072 3,072 $0.00
5 187 187 $0.00
Maximum Total 182,903 6 175 175 $0.00
on Day 28 7 159 159 $0.00
Minimum Total 155 8 166 166 $0.00
on Day 11 9 172 172 $0.00
10 190 190 $0.00
11 155 155 $0.00
12 35,197 35,197 $0.00
Daily Statistics 13 65,783 65,783 $0.00
Maximum 182,903 14 118,417 118,417 $0.00
Minimum 155 15 107,312 107,312 $0.00
16 48,048 48,048 $0.00
17 57,980 57,980 $0.00
18 62,428 62,428 $0.00
Location Statistics 19 61,383 61,383 $0.00
Maximum 1,647,985 20 60,827 60,827 $0.00
at Location Effluent Flow Meter 21 125,215 125,215 $0.00
Minimum 0 22 74,732 74,732 $0.00
at Location Future 23 44,953 44,953 $0.00
24 58,257 58,257 $0.00
25 67,837 67,837 $0.00
26 68,262 68,262 $0.00
27 90,647 90,647 $0.00
28 182,903 182,903 $0.00
29 115,843 115,843 $0.00
30 72,823 72,823 $0.00
31 69,764 69,764 $0.00
Totals 1,647,985 0 0 0 1,647,985
Total Cost $0.00 $0.00 $0.00 $0.00 $0.00
Monthly Production August 2023
Date Effluent Flow Meter Future Future Future Total Total Cost
Monthly Statistics 1 66,487 66,487 $0.00
Total 2,191,189 2 68,519 68,519 $0.00
Days Pumped 31 3 100,539 100,539 $0.00
Average 70,684 4 153,356 153,356 $0.00
5 91,031 91,031 $0.00
Maximum Total 153,356 6 62,558 62,558 $0.00
on Day 4 7 66,308 66,308 $0.00
Minimum Total 40,251 8 58,498 58,498 $0.00
on Day 24 9 59,875 59,875 $0.00
10 87,685 87,685 $0.00
11 79,814 79,814 $0.00
12 53,545 53,545 $0.00
Daily Statistics 13 60,451 60,451 $0.00
Maximum 153,356 14 87,130 87,130 $0.00
Minimum 40,251 15 87,024 87,024 $0.00
16 71,620 71,620 $0.00
17 77,609 77,609 $0.00
18 96,598 96,598 $0.00
Location Statistics 19 48,875 48,875 $0.00
Maximum 2,191,189 20 47,195 47,195 $0.00
at Location Effluent Flow Meter 21 48,566 48,566 $0.00
Minimum 0 22 48,550 48,550 $0.00
at Location Future 23 43,691 43,691 $0.00
24 40,251 40,251 $0.00
25 71,939 71,939 $0.00
26 54,824 54,824 $0.00
27 41,602 41,602 $0.00
28 53,776 53,776 $0.00
29 55,268 55,268 $0.00
30 94,600 94,600 $0.00
31 113,405 113,405 $0.00
Totals 2,191,189 0 0 0 2,191,189
Total Cost $0.00 $0.00 $0.00 $0.00 $0.00
8/1/23-8/8/23 667,296
8/9/23 - 8/31/23 1,523,893
Monthly Production September 2023
Date Effluent Flow Meter Future Future Future Future Total Total Cost
Monthly Statistics 1 51,497 51,497 $0.00
Total 1,350,656 2 40,263 40,263 $0.00
Days Pumped 30 3 17,658 17,658 $0.00
Average 45,022 4 16,493 16,493 $0.00
5 45,521 45,521 $0.00
Maximum Total 75,938 6 42,919 42,919 $0.00
on Day #N/A 7 47,790 47,790 $0.00
Minimum Total 16,493 8 70,762 70,762 $0.00
on Day 4 9 44,884 44,884 $0.00
10 37,317 37,317 $0.00
11 39,667 39,667 $0.00
12 51,631 51,631 $0.00
Daily Statistics 13 37,486 37,486 $0.00
Maximum 75,938 14 38,015 38,015 $0.00
Minimum 16,493 15 65,703 65,703 $0.00
16 47,366 47,366 $0.00
17 25,859 25,859 $0.00
18 31,943 31,943 $0.00
Location Statistics 19 41,620 41,620 $0.00
Maximum 1,350,656 20 46,305 46,305 $0.00
at Location Effluent Flow Meter 21 51,306 There was a server failure on 9/23 which 51,306 $0.00
Minimum 0 22 69,770 prevented this report from automatically 69,770 $0.00
at Location Future 23 44,798 updating while the server was down. The 44,798 $0.00
24 26,435 server was reset on 9/25. 26,435 $0.00
25 39,240 39,240 $0.00
26 41,390 Since the issue wasn't with the meter itself, 41,390 $0.00
27 37,878 we were able to manually pull the 37,878 $0.00
28 71,644 information from the meter to add to the 71,644 $0.00
29 75,938 75,938 $0.00
30 51,558 51,558 $0.00
31 #VALUE!
Totals 1,350,656 0 0 0 0 1,350,656
Total Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
9/1/23-9/7/23 262,141
9/8/23 -9/30/23 1,088,515
Monthly Production October 2023
Date Effluent Flow Meter Future Future Future Total Total Cost
Monthly Statistics 1 34,272 34,272 $0.00
Total 1,584,680 2 49,582 49,582 $0.00
Days Pumped 31 3 49,203 49,203 $0.00
Average 51,119 4 48,327 48,327 $0.00
5 52,038 52,038 $0.00
Maximum Total 114,209 6 54,859 54,859 $0.00
on Day 20 7 53,257 53,257 $0.00
Minimum Total 28,814 8 28,814 28,814 $0.00
on Day 8 9 31,132 31,132 $0.00
10 31,484 31,484 $0.00
11 32,558 32,558 $0.00
12 36,681 36,681 $0.00
Daily Statistics 13 64,085 64,085 $0.00
Maximum 114,209 14 73,427 73,427 $0.00
Minimum 28,814 15 55,474 55,474 $0.00
16 52,580 52,580 $0.00
17 38,266 38,266 $0.00
18 42,222 42,222 $0.00
Location Statistics 19 64,540 64,540 $0.00
Maximum 1,584,680 20 114,209 114,209 $0.00
at Location Effluent Flow Meter 21 38,400 38,400 $0.00
Minimum 0 22 43,208 43,208 $0.00
at Location Future 23 36,386 36,386 $0.00
24 59,763 59,763 $0.00
25 73,855 73,855 $0.00
26 59,230 59,230 $0.00
27 91,255 91,255 $0.00
28 46,496 46,496 $0.00
29 45,181 45,181 $0.00
30 42,117 42,117 $0.00
31 41,779 41,779 $0.00
Totals 1,584,680 0 0 0 1,584,680
Total Cost $0.00 $0.00 $0.00 $0.00 $0.00
10/1/23-10/6/23 288,281
10/7/23 -10/30/23 1,296,399
Monthly Production November 2023
Date Effluent Flow Meter Future Future Total Total Cost
Monthly Statistics 1 39,465 39,465 $0.00
Total 1,092,858 2 41,174 41,174 $0.00
Days Pumped 30 3 53,719 53,719 $0.00
Average 36,429 4 40,591 40,591 $0.00
5 25,699 25,699 $0.00
Maximum Total 58,733 6 37,603 37,603 $0.00
on Day 20 7 41,898 41,898 $0.00
Minimum Total 17,997 8 47,774 47,774 $0.00
on Day 19 9 50,190 50,190 $0.00
10 36,351 36,351 $0.00
11 58,420 58,420 $0.00
12 47,539 47,539 $0.00
Daily Statistics 13 24,832 24,832 $0.00
Maximum 58,733 14 29,288 29,288 $0.00
Minimum 17,997 15 29,197 29,197 $0.00
16 28,397 28,397 $0.00
17 49,884 49,884 $0.00
18 30,610 30,610 $0.00
Location Statistics 19 17,997 17,997 $0.00
Maximum 1,092,858 20 58,733 58,733 $0.00
at Location Effluent Flow Meter 21 40,331 40,331 $0.00
Minimum 0 22 51,088 51,088 $0.00
at Location Future 23 29,929 29,929 $0.00
24 22,249 22,249 $0.00
25 23,599 23,599 $0.00
26 27,633 27,633 $0.00
27 37,252 37,252 $0.00
28 22,946 22,946 $0.00
29 25,108 25,108 $0.00
30 23,362 23,362 $0.00
31 #VALUE!
Totals 1,092,858 0 0 1,092,858
Total Cost $0.00 $0.00 $0.00 $0.00
11/1/23-11/7/23 280,149
11/8/23 -11/30/23 812,709
Monthly Production December 2023
Date Effluent Flow Meter Future Future Total Total Cost
Monthly Statistics 1 51,073 51,073 $0.00
Total 1,028,129 2 42,532 42,532 $0.00
Days Pumped 31 3 19,294 19,294 $0.00
Average 33,165 4 31,913 31,913 $0.00
5 27,647 27,647 $0.00
Maximum Total 58,451 6 25,582 25,582 $0.00
on Day 21 7 26,925 26,925 $0.00
Minimum Total 16,516 8 38,336 38,336 $0.00
on Day 17 9 34,795 34,795 $0.00
10 32,333 32,333 $0.00
11 25,118 25,118 $0.00
12 31,205 31,205 $0.00
Daily Statistics 13 30,310 30,310 $0.00
Maximum 58,451 14 38,093 38,093 $0.00
Minimum 16,516 15 35,576 35,576 $0.00
16 40,080 40,080 $0.00
17 16,516 16,516 $0.00
18 33,369 33,369 $0.00
Location Statistics 19 31,959 31,959 $0.00
Maximum 1,028,129 20 36,935 36,935 $0.00
at Location Effluent Flow Meter 21 58,451 58,451 $0.00
Minimum 0 22 46,507 46,507 $0.00
at Location Future 23 26,783 26,783 $0.00
24 19,210 19,210 $0.00
25 17,364 17,364 $0.00
26 33,585 33,585 $0.00
27 35,340 35,340 $0.00
28 29,463 29,463 $0.00
29 38,786 38,786 $0.00
30 43,618 43,618 $0.00
31 29,431 29,431 $0.00
Totals 1,028,129 0 0 1,028,129
Total Cost $0.00 $0.00 $0.00 $0.00
12/1/23-12/7/23 224,966
12/8/23 -12/31/23 803,163
Engineering Department &
Department of Public Works
Monthly Utility Commission
Report for December 2023
OPERATIONS NOTES:
Sanitary Sewer
• Employees maintained and read laser meters in the sanitary collection system.
• Monitored sanitary sewer system for inflow and infiltration (I&I), televised sanitary mains, sanitary
manholes were inspected, and the sewer jetter was operating in the system.
• Jetted 4,000 ft. of sewer main line.
Storm Sewer
• Development site plans were reviewed.
• Street sweeping continued.
• Cleaned storm inlets.
• The leaf vacuums operated throughout the Village until December 22nd.
Storm Ponds
• Checked pumps before rain events.
• Cleaned trash racks.
Water
• Lawn restoration for one new hydrant
ENGINEERING NOTES: 2023 Utility Projects – December
The table below identifies the installed and/or removed public utilities in the month of December.
December 2023 - Utility Installation and Abandonments
Village of Little Chute – Founders Estates Subdivision
WATER MAIN Units Installed Abandoned/Removed
6” Water Valve EA 4.0 NA
6” PVC Hydrant Lead LF (EA) 55.0 (4.0) NA
Fire Hydrant EA 4.0 NA
8” Water Valve EA 3.0 NA
8” PVC Water Main LF 1,491.0 NA
SANITARY SEWER Units Installed Abandoned/Removed
8” PVC Sanitary Main LF 1,393.0 NA
4’ Dia. Standard Precast Sanitary Manhole VF (EA) 96.94 (8.0) NA
4” PVC Sanitary Lateral LF (EA) 1,902.5 (41.0) NA
STORM SEWER Units Installed Abandoned/Removed
None NA None NA
Founders Estates Subdivision - Utility Project
Don Hietpas & Sons has completed the installation of the sanitary sewer main and sanitary laterals
for the new subdivision. The water main is installed, with the exception of the water services.
Top Priorities for January 2024
Founders Estates Subdivision - Utility Project
Crews have completed approximately 25% of the storm sewer main, crews continue with the
construction of the storm sewer. Storm sewer inlets, catch basins, and storm laterals will be
constructed after completion of the storm sewer main. Crews will also complete the construction of
the polyethylene water services after testing and obtaining the safe water samples, as required.
Buchanan Street Utilities & Concrete Paving Project
Staff have come to agreement with Kruczek Construction on the final utility quantities for the
Buchanan Street Utility contract. The final pay application has been approved and submitted to the
Village Finance Department for processing. Staff continues discussion and is working with Vinton
Construction and their sub-contractors to complete final quantities and prepare final project payment
and project closeout.
Randolph Drive Utilities & Concrete Paving Project
Staff continues working with Don Hietpas & Sons, Vinton Construction, and their sub-contractors to
complete final quantities and prepare final pay applications and project closeouts.
Miscellaneous:
Engineering Staff continues work on the 2024 West Evergreen Drive Reconstruction Project (Phase
3) which is located between Holland Road and Vandenbroek Road. Project plans and bid package
are scheduled to be available on January 31st, bids will be excepted at Village Hall until Thursday,
February 15th at 2:00 pm at which time they will be opened and read aloud by Village staff.
Construction of the Ebben Trail Bridges No. 1 & 2 is complete. Engineering Staff have walked the
sites and created a preliminary punch-list, miscellaneous work/repairs have been completed,
additional items which are weather dependent will be completed in the spring of 2024. Staff is also
working with the General Contractor (Milbach) to administer the final quantities and pay application to
complete project closeout.
Engineering continues reviewing, issuing, and inspecting all right of way permits for the Village.
Continued efforts to investigate and repair utilities that have been impacted or damaged during the
TDS and/or AT&T construction process.
Continue efforts to assist other departments with daily tasks as well as any special projects or
requests. Staff to focus on finance, year-end reporting, and asset allocation for the upcoming audit.