Village Board
Regular MeetingLone Rock, WI · May 14, 2024
Minutes
Citizen Participation Plan Public Hearing
Proposed 2025 Wastewater Treatment Facility Improvements – Lone Rock
Village of Lone Rock
Meeting Minutes
May 14, 2024
1. List of attendees. Dan Quinn, Mary Litviak, Harry Pulvermacher, Adam Reno, Corey Ewers, Brad
Seymour, Tammy Christianson, Pat Christianson, Christa Quinn, Brandy Dosch, Bart Nies
2. Village of Lone Rock Office, 314 E Forest St., Lone Rock, WI at 6:00 PM.
3. Topics of discussion –
− The Citizen Participation Plan for the Community Development Block Grant for Public Facilities
(CDBG-PF)
− Wastewater Treatment Facility (WWTF) Facility Plan
o Wisconsin Pollutant Discharge Elimination System (WPDES) Permit requirements:
Effluent BOD5 limit = 50 mg/l
Preventative Action limits - Nitrogen, Nitrite, +Nitrate (Dissolved) = 3.2 mg/l
Preventative Action limits - Nitrogen, Ammonia (Dissolved) = 0.97 mg/l
Preventative Action limits - Total Dissolved Solids = 280 mg/l
o Non-compliance issues:
Unable to meet Effluent BOD5 limit
Current Groundwater has high nitrates; unable to meet Preventative Action limits for
Groundwater
Exceeded capacity for sludge storage in WWTF lagoons; which caused release of
excess nutrients and allowed for excess growth of algae and duckweed
Ex. aeration system is deficient; broken and floating aerators; holes in air lines
Broken and inoperable wastewater process control valves
Debris/Trash accumulation within wastewater equipment causing plugging and
excess wear issues
“Short-circuiting” and limited detention time for wastewater treatment in ex. WWTF
lagoons
o Proposed Alternatives:
“Do Nothing Alternative”=>DNR Legal Enforcement
WWTF Lagoon System Improvements=>selected Alternative
Activated Sludge Mechanical Treatment Facility=>most expensive Alternative
Recirculating Sand Filter Treatment Facility=>higher costs than WWTF Lagoon
System and not as cost-effective
o Proposed activities for Proposed 2025 Wastewater Treatment Facility Improvements – Lone
Rock Project:
WWTF Treatment Process Improvements – construction of a proposed 27’ x 38.5’
Control Building and 13.5’ x 27’ Headworks Building with associated plumbing,
HVAC, and electrical components; installation of Motor Control Center, Emergency
Power Generator, Blowers, Mechanical WWTF Screen, Septic Tank, and WWTF
Lagoon Cells’ Baffle Walls; and replacement of the Aeration System, Control Valves
and Manholes, Seepage Cells’ Effluent Discharge Piping, and associated piping,
electrical controls, and appurtenances; and yard landscaping/restoration at the
existing WWTF
− Estimated Project Costs = $3,242,000
− Estimated Impact on Sewer Rates
o Current Annual Residential Sewer User Fees = $290/yr.
o Estimated Annual Increase – Residential Sewer User Fee = $930/yr./user =
$232.50/qtr./user (w/o Wisconsin DNR Clean Water Fund Loan)
o Estimated Annual Increase – Residential Sewer User Fee = $552.08/yr./user =
$138.00/qtr./user (w/Wisconsin DNR Clean Water Fund Loan)
− LMI % = 56.82% (Census-eligible)
− Amount to be requested for project ($1,000,000)
− The proposed amount of funds ($1,000,000) to be used to benefit low-and moderate-income persons
− Goals and objectives of the CDBG program
− The total amount of CDBG funds available
− Public facilities, economic development, and housing needs
− No persons will be displaced as a result of the proposed activities.
4. Attendees were advised that CDBG-PF Application Proposal can be changed in response to local demand or
can apply for funding for other activities at a later date.
5. Attendees were advised of other housing, public facility, and economic development activities that can be
assisted with a CDBG Grant.
6. Closed hearing at 6:19 PM.
Respectfully submitted: Tammy Christianson, Clerk.
Agenda
Village of Lone Rock
Agenda Items
Wednesday, May 14, 2024
1. CDBG-PF - Proposed 2024 Wastewater Treatment Facility Upgrade –
Lone Rock Project
Consider the following for Approval:
A) Public Hearing – Citizen Participation Plan
B) Resolution Adopting a Citizen Participation Plan (Resolution #2024-04)
C) Resolution Adopting Excessive Use of Force/Non-Violent Demonstration
Policy (Resolution #2024-05)
D) Certifications -
• Initial Eligibility Certification
• Statement of Assurances Certification
• Lobbying Certification
• Acquisition, Relocation & Demolition Certification
• Fair Housing Actions Certification
E) Matching Funds Commitment Letter from local bank
F) Matching Funds Resolution (Resolution #2024-06)
G) Fair Housing Ordinance Resolution (Resolution #2024-07)
H) Fair Housing Ordinance -
I) Residential Anti-Displacement and Relocation Assistance Plan
J) Capital Improvements Program (C.I.P.)
K) Authorizing Resolution to Submit CDBG-PF App. (Resolution #2024-08)
L) Plans, Specifications, and Estimates
M) Village Procurement Policy
N) Revised Engineering Contract – Delta 3 Engineering
1
Get email alerts for Lone Rock
A daily email when new agendas and minutes are posted.