City Council
Regular MeetingMount Vernon, WA · June 8, 2022
Minutes
City of Mount Vernon
City Council Meeting Minutes
June 8, 2022
Police Court Campus, 1805 Continental Place
Mayor Boudreau called the meeting to order at 7:01 p.m.
Present: Councilmembers Beaton, Brocksmith, Carías, Hudson,
Molenaar, and Morales
Absent: Councilmember Hulst (excused)
Staff Present: City Attorney Rogerson, Finance Director Volesky, Special
Projects Manager Donovan, Parks and Enrichment Services
Director Berner, Public Works Director Phillips, Fire Chief Brice,
Assistant Fire Chief Harris, Police Chief Cammock, Human
Resources Director Keator, Library Director Huffman, IS
Director Kleppe, and Engineering Manager Chesterfield
Citizens Present: 0
COMMUNITY COMMENTS
A. Public Comments - Email
Public Comments sent via email to council@mountvernonwa.gov were read
aloud by Mr. Donovan.
Emails regarding solid waste were received from IB Tapps, Rachel Beto,
and Sharon & Craig Russo
B. Public Comments - In person
None.
CONSENT AGENDA
A. Approval of May 25, 2022 Regular Council Meeting Minutes.
Mount Vernon City Council
June 8, 2022
Page 2 of 4
B. Approval of June 1, 2022 Study Session Minutes
C. Approval of June 5, 2022 payroll checks numbered 111425 - 111446,
direct deposit checks numbered 88247 - 88494, and wire transfers
numbered 1100 - 1104 in the amount of $1,059,272.03.
D. Approval of June 8, 2022 claims numbered 17800 – 17801 and 17810
- 17909 in the amount of $816,796.45.
Councilmember Hudson moved to approve Consent
Agenda Items A-D. Motion seconded by
Councilmember Molenaar. Motion carried 6-0.
REPORTS
A. Committees
1. Public Works and Library – see committee minutes for details.
2. Public Safety – postponed until June 22, 2022.
B. Councilmember Comments
Councilmember Carías congratulated Mount Vernon High School
graduates
Council member Molenaar acknowledged the Mount Vernon High
School Graduation Parade.
C Mayor’s Report
Mayor Boudreau spoke about the Twitter and Instagram campaign to
encourage support from state and federal representatives for the
Library Commons Project.
COVID-19 Update.
Congratulations to 2022 Graduates.
D. Committee Agenda Requests
Graffiti removal process.
UNFINISHED BUSINESS
None.
NEW BUSINESS
A. Mount Vernon Downtown Association Update :
Councilmember Beaton moved approve to table
this item until June 22, 2022. Motion seconded by
Councilmember Morales. Motion carried 6-0.
Mount Vernon City Council
June 8, 2022
Page 3 of 4
B. Approval of Agreement – Skagit County: Mr. Chesterfield requested
approval of an Interlocal Agreement with Skagit County for vegetation
maintenance of the Maddox Creek Restoration Project. The total cost
of the project is $10,000, the City and County will each pay $5,000.
Councilmember Molenaar moved authorize the
Mayor to enter into an agreement with Skagit
County for the vegetation maintenance of the
Maddox Creek Restoration Project in the amount of
$10,000. Motion seconded by Councilmember
Morales. Motion carried 6-0.
C. Approval of Redistricting Plan: Mr. Donovan requested approval of the
designation of City Council Wards 2 and 3 boundaries.
Councilmember Morales moved to approve
Ordinance 3850 approving the boundary
designations for Council Wards 2 and 3. Motion
seconded by Councilmember Beaton. Motion
carried 6-0.
D. Consideration of Real Property Donation: Mayor Boudreau stated that a
request was made to postpone this item.
Councilmember Morales moved to table this item
pending additional Parks and Enrichment Services
Committee discussion. Motion seconded by
Councilmember Beaton. Motion carried 6-0.
E. Solid Waste Rate Study Update: Mr. Phillips requested approval of an
ordinance correcting the solid waste temporary container fees and
updating the effective date.
Councilmember Morales moved approve Ordinance
3851 correcting the solid waste temporary
container fees and updating effective date. Motion
seconded by Councilmember Molenaar. Motion
carried 6-0.
F. Approval of Agreement – Mount Vernon Fire Station No. 3 Renovation:
Chief Brice requested approval of the bid award and agreement with
Trico Construction for the Mount Vernon Fire Station No. 3 Renovation
project.
Mount Vernon City Council
June 8, 2022
Page 4 of 4
Councilmember Beaton moved approve award the
bid and authorize the Mayor to enter into an
agreement with Trico Construction for the Mount
Vernon Fire Station 3 Renovation Project in the
amount of $4,317,184. Motion seconded by
Councilmember Hudson. Motion carried 6-0
G. Approval of Agreement – Mount Vernon IAFF Battalion Chief Collective
Bargaining Agreement (CBA): Ms. Keator request approval of the
Mount Vernon IAFF Battalion Chief Collective CBA for January 1, 2022
through December 31, 2024.
Councilmember Morales moved to authorize the
Mayor to enter into an agreement with the Mount
Vernon IAFF Battalion Chiefs for January 1, 2022
through December 31, 2024. Motion seconded by
Councilmember Beaton. Motion carried 6-0.
The meeting convened into Executive Session at 7:39 p.m. for a period of
fifteen minutes to discuss with legal counsel representing the agency matters
relating to agency enforcement actions, or to discuss with legal counsel
representing the agency litigation or potential litigation to which the agency,
the governing body, or a member acting in an official capacity is, or is likely
to become, a party, when public knowledge regarding the discussion is likely
to result in an adverse legal or financial consequence to the agency pursuant
to RCW 42.30.110(i). No action will be taken following the Executive Session.
The meeting was reconvened and adjourned at 7:54 p.m.
Submitted by: ________________________________
Becky Jensen, City Clerk
Approve: ________________________________
Jill Boudreau, Mayor
Agenda
CITY OF MOUNT VERNON
CITY COUNCIL MEETING
AGENDA
June 8, 2022, 7:00 p.m.
Police Court Campus
1805 Continental Place
To virtually attend the meeting, the public may:
1. Call the conference line: 1-888-924-9240; Access Code: 3366211 (please ‘mute’
your phone, if possible, to minimize distractions)
2. Watch the meeting live on TV10: Comcast/Xfinity Channel 10
3. Watch the meeting live, online:
https://www.youtube.com/channel/UCUob_hcQUmd4S93YkletdrA
I. OPENING CEREMONIES
A. Call to Order
B. Pledge of Allegiance
C. Roll Call of Councilmembers
II. COMMUNITY COMMENTS
1. Review of Emails from the Public
(Public comments may be sent via email to council@mountvernonwa.gov. The comments will be
read aloud into the record during the public comment portion of the agenda. Please limit your
comments to be read in three minutes or less. Email comments must be received by 4 p.m. on
June 8, 2022.)
2. Public Comments
(This is an opportunity for Mount Vernon residents to address their City Council. Please limit
comments to three minutes or less. Under normal circumstances, the Mayor and Council will not
respond immediately to Community Comments. If you would like someone to follow-up with you
regarding the topic of your comments, please leave your name and contact information on the form
at the entrance of the Council Chambers.)
III. CONSENT AGENDA
A. Approval of May 25, 2022 Regular Council Meeting Minutes
B. Approval of June 1, 2022 Study Session Minutes
C. Approval of June 5, 2022 payroll checks numbered 111425 - 111446
direct deposit checks numbered 88247 - 88494 and wire transfers numbered
1100 - 1104 in the amount of $1,059,272.03
D. Approval of June 8, 2022 Claims numbered 17800 – 17801 and 17810 -
17909 in the amount of $816,796.45.
IV. REPORTS
A. Committees
1. Public Works and Library
2. Public Safety
B. Councilmember Comments
C. Mayor’s Report
Mount Vernon City Council Agenda
June 8, 2022
Page 2
D. Committee Agenda Requests
V. UNFINISHED BUSINESS
None
VI. NEW BUSINESS
A. Mount Vernon Downtown Association Update
(Mount Vernon Downtown Association Director Ellen Gamson will provide an update of recent
developments in the downtown business community.)
(required action – none)
(staff contact – Peter Donovan)
B. Approval of Agreement – Skagit County
(Staff is requesting approval of an interlocal agreement with Skagit County for vegetation maintenance
of the Maddox Creek Restoration Project.)
(required action – motion)
(staff contact – Blaine Chesterfield)
C. Approval of Redistricting Plan
(Staff is requesting approval a Redistricting Plan to balance the population within the City’s voting
districts.)
(required action – ordinance)
(staff contact – Peter Donovan)
D. Consideration of Real Property Donation
(Staff is requesting consideration of the donation of a parcel of land located at 401 S. LaVenture Road.)
(required action – motion)
(staff contact – Jennifer Berner)
E. Solid Waste Rate Study Update
(Staff is requesting approval of an ordinance correcting the solid waste temporary container fees.)
(required action – ordinance)
(staff contact – Chris Phillips )
F. Approval of Agreement – Mount Vernon Fire Station No. 3 Renovation
(Staff is requesting approval of a bid award and agreement with Trico Construction for the Mount
Vernon Fire Station No. 2 Renovation project.)
(required action – motion)
(staff contact – Bryan Brice )
G. Approval of Agreement – Mount Vernon IAFF Battalion Chief Collective Bargaining
Agreement
(Staff is requesting approval of a Collective Bargaining Agreement for the Mount Vernon IAFF Battalion
Chief Bargaining Unit.)
(required action – motion)
(staff contact – Erin Keator )
COMMITTEE MEETINGS
Public Works and Library 6:00 p.m.
Next Ordinance 3850
Next Resolution 1014
AGENDA ITEM: A
DATE: June 8, 2022
TO: Mayor Boudreau and City Council
FROM: Peter Donovan, Special Projects Manager
SUBJECT: MOUNT VERNON DOWNTOWN ASSOCIATION UPDATE
RECOMMENDED ACTION:
None
INTRODUCTION/BACKGROUND:
The Mount Vernon Downtown Association is a 501(c)3 nonprofit that strives to serve as the voice of
Downtown Mount Vernon. The Association holds that our historic downtown district is the heart of our
community; and they work to support, develop, and build vibrance in Downtown Mount Vernon through
promotion, advocacy, outreach, and celebration.
FINDINGS/CONCLUSIONS:
Ellen Gamson is the executive director of the Mount Vernon Downtown Association and will be updating
City Council on the Downtown Association’s recent projects.
RECOMMENDATION:
None
ATTACHED:
None
AGENDA ITEM: B
DATE: June 8, 2022
TO: Mayor Boudreau and City Council
FROM: Blaine Chesterfield, Engineering Manager
SUBJECT: INTERLOCAL COOPERATIVE AGREEMENT WITH SKAGIT COUNTY FOR THE MADDOX
CREEK RESTORATION PROJECT
RECOMMENDED ACTION:
Staff recommends council authorize the Mayor to sign an Interlocal Cooperative Agreement with Skagit
County which allows for the vegetation maintenance of the Maddox Creek Restoration Project. The
City’s contribution of funds will be in the amount of $5,000.
INTRODUCTION/BACKGROUND:
The purpose of this Agreement is for on-going vegetation maintenance which is part of the County and
City cooperative work on the Maddox Creek Culvert Removal and Stream Restoration Project.
FINDINGS/CONCLUSIONS:
• The culvert removal was completed in 2020 and opened 2 miles of fish habitat.
• There is an Ecology requirement for 10-years of maintenance with an 80% survival rate for the
vegetation planted along Maddox Creek.
• Maintenance will be on-going for eight more years.
RECOMMENDATION:
Staff recommends Council approve the Interlocal Cooperative Agreement with Skagit County and
authorize the Mayor to execute the agreement.
ATTACHED:
Interlocal Cooperative Agreement with Skagit County
AGENDA ITEM: C
DATE: June 8, 2022
TO: Mayor Boudreau and City Council
FROM: Peter Donovan, Special Projects Manager
SUBJECT: REDISTRICTING ORDINANCE
RECOMMENDED ACTION:
Ordinance
INTRODUCTION/BACKGROUND:
The City is required to review, and if necessary revise, its voting districts (wards) with each new
decennial census data. 2020 census data revealed population growth in Mount Vernon, as well as an
imbalance of population among wards 2 and 3.
The ideal balanced population within each of the City’s three wards would be 11,740 persons per ward,
with an allowable variance of +/- 5%.
The City contracted with a renowned demographer to determine an effective and practical plan for
rebalancing its districts.
FINDINGS/CONCLUSIONS:
The City’s demographer recommended transferring a portion of Ward 3 into Ward 2. The area to be
moved is demonstrated in Appendix A of the attached Ordinance.
A draft plan for redistricting was presented to City Council on Wednesday, May 11th.
A public hearing date, and a comment period, was announced on May 12th.
A public hearing was held during a May 25th City Council meeting.
No written or verbal comments were received by the City for the proposed redistricting plan.
RECOMMENDATION:
To accept the proposed plan, and to rebalance the City’s voting districts; staff recommends a Council
Ordinance (#3850) to amend MV Municipal Code Chapter 1.12 setting forth the designation of City
Council Ward Boundaries.
ATTACHED:
Ordinance 3850
AGENDA ITEM: D
City of
MOUNT
VERNON
DATE: June 8, 2022
TO: Mayor Boudreau and City Council
FROM: Jennifer Berner, Director, Parks and Enrichment Services
SUBJECT: OFFER TO DEED PROPERTY AT 410 S. LAVENTURE RD. TO CITY OF MOUNT VERNON
RECOMMENDED ACTION:
The staff and Mayor strongly recommend declining the offer from Pacific Coast Management Group to
deed the property at 410 Laventure Road to the City of Mount Vernon.
INTRODUCTION/BACKGROUND:
Pacific Coast Management Group is offering to deed 2.63 acres of land located at 401 S. Laventure Road
to the City of Mount Vernon. The entire property is encumbered by wetlands.
Staff had Dr. Lee, City's Wetland Biologist, review the wetland delineation and it has been determined
the site is not a candidate for the City's ecosystem alternative program because it is already forested.
Additionally, there is little potential in terms of critical area functions that can be achieved with
mitigation activities on the site.
When the City takes on property into the City's ecosystem alternative program a baseline is established
for functions and then the City monitors these functions over time as we complete mitigation (planting,
weed removal, etc.). The City is required to demonstrate that our mitigation efforts result in the same
or greater functions on a site. If the City cannot show the same, or increased, functions being created
on the City owned sites our buffer buy-down program (ecosystem alternative) would be in jeopardy.
FINDINGS/CONCLUSIONS:
None
RECOMMENDATION:
Motion to decline the offer from Pacific Coast Management Group to deed the property at 410
Laventure Road to the City.
ATTACHED:
Memo and Report from Pacific Coast Management Group
AGENDA ITEM: E
DATE: June 8, 2022
TO: Mayor Boudreau and City Council
FROM: Chris Phillips, Public Works Director
SUBJECT: ORDINANCE TO CHANGE SOLID WASTE SERVICES RATES
RECOMMENDED ACTION:
Staff recommends that Council adopt the attached ordinance amending Section 8.12.120 of the Mount
Vernon Municipal Code which will revise garbage rates effective June 1, 2022.
INTRODUCTION/BACKGROUND:
The City Council approved the collection rate method on March 2, 2022. Bell and Associates noted an
error in the Temporary Container Fees and notified the City on May 26, 2022.
FINDINGS/CONCLUSIONS:
Public Hearing notices were published on February 23, 2022, and March 2, 2022. No comments were
received.
RECOMMENDATION:
Staff recommends that Council adopt an ordinance revising solid waste service rates to be effective June
1, 2022.
ATTACHED:
Ordinance
AGENDA ITEM: F
DATE: June 8, 2022
TO: Mayor Boudreau and City Council
FROM: Bryan Brice, Fire Chief
SUBJECT: PROFESSIONAL SERVICES AGREEMENT FOR CONSTRUCTION WITH TRICO
RECOMMENDED ACTION:
Staff recommends that Council adopt the professional services agreement for services with Trico and
authorize the Mayor to execute the contract.
INTRODUCTION/BACKGROUND:
The Mount Vernon Fire Department is responsible for fire suppression, emergency medical services,
rescue services, fire prevention and investigation, as well as Emergency Management for the City. Our
firefighters respond to over 7,000 emergency and non-emergency calls each year.
Fire, EMS and rescue services are dispatched from three stations with the oldest one built in 1964 and the
newest in 1998, the three stations are strategically located around the geographical center of the city.
Our stations house engine companies, a ladder truck, ambulances, brush unit, as well as reserve engines
and reserve ambulances. Station 2 is also home to the Battalion Chief and our administrative staff.
Due to the age of Fire Station 1 and the aging of Stations 2 and 3, the council gave support to analyzing
our needs for our stations now and into the future. To accomplish this Council authorized a needs
assessment in September 2018. Mount Vernon sought a professional architectural firm to perform phase
I (needs assessment) and II (design and engineering) of a project for the replacement of station 1 and the
needs assessment for stations 2 & 3. This project included a review of existing conditions at Stations 2
and 3, identified current and future space and operational needs, prepared conceptual design, forecast
construction and total project costs for a new station 1 and renovations to stations 2 & 3. In addition, the
design consultant assisted in gathering stakeholder input as it relates to the need’s assessment. Phase II
of the project consists of design and engineering along with preparing construction documents,
permitting, bid assistance, and construction contract administration services for stations 2 and 3.
Work has continued for the architecture and design for renovation of fire stations 2 and 3. This process
is nearing completion for station 3, with awarding of a construction firm being one of the final steps. The
construction phase of the project requires a detailed understanding of construction process, standards,
regulations, and codes. In addition, there are numerous inspections and materials testing needed during
the construction phase. To assist the city with this we have retained KBA for construction management.
With the assistance from our architectural firm, Mackenzie, a competitive bid process was implemented
and advertised for construction firms to submit bids to perform the renovation construction work. This
process opened on April 22, 2022 and closed on May 27, 2022. This process used the city’s procurement
software, Open Gov, to advertise, share needed documents, and provide answers to questions from
construction firms. This information summarizes the results of our bid process:
• Open Gov site followers – 34 participants
• Document downloads – 42
• Number of bidders – 3
• Range of bids – $4,317,184 to $4,959,835.05
The submitted bids were reviewed by a team consisting of the city, KBA and Mackenzie to determine the
lowest responsive bidder.
The funding for the project (and for the station 2 renovation) will be through a bond (see attached bond
approval timeline and schedule). Staff is recommending that council approve a bond for the total cost of
both projects ($12,000,000) with a 20-year payback time frame. The approximate cost for the bond
payment will be $842,000. The revenue for the bond will be provide through ambulance transport
revenue, more specifically funds received from the GEMT reimbursement.
FINDINGS/CONCLUSIONS:
Based on the competitive bid process and review of the submitted bids it was determined that Trico at a
bid price of $4,317,184 was the lowest responsive bidder.
RECOMMENDATION:
Staff recommends that Council adopt the professional services agreement for services with Trico and
authorize the Mayor to execute the contract.
ATTACHED:
Professional Services Agreement
Bond Timeline
AGENDA ITEM: G
DATE: June 8, 2022
TO: Mayor Boudreau and City Council
FROM: Erin Keator, Human Resources Director
SUBJECT: IAFF BATTALION CHIEF COLLECTIVE BARGAINING AGREEMENT
RECOMMENDED ACTION:
Staff recommends that Council authorize the Mayor to sign the IAFF Battalion Chief collective bargaining
agreement for January 1, 2022 through December 31, 2024.
INTRODUCTION/BACKGROUND:
The IAFF Battalion Chief collective bargaining agreement expired on December 31, 2021. The City and
the Union began contract negotiations in November of 2021 and reached an agreement for a three year
contract. The Union voted to approve the agreement in May 2022.
FINDINGS/CONCLUSIONS:
Three year contract
Increase differential between top step firefighter and Battalion Chief to 39% effective the first of the
month following approval of the CBA; the Fire Prevention Battalion Chief will maintain a 2% differential
above the Shift Battalion Chief.
Remove the education incentive effective the first of the month following approval of the CBA.
City will pay 100% of the premiums for employee medical insurance effective the first of the month
following approval of the CBA.
Increase sick leave to 14 hours per month.
Increase deferred compensation contribution from 3.5% to 4.0%
Increase MERP contribution from $47.00 to $50.00
RECOMMENDATION:
Staff recommends that Council authorize the Mayor to sign the IAFF Battalion Chief collective
bargaining agreement for January 1, 2022 through December 31, 2024.
ATTACHED:
Click here to enter text.