1. 125 Main Street. Nyack Social. Application for signage
Application presented by: Antonia Felciano
Board discussion:
Reviewed placement of proposed sign and existing signs in windows of establishment. Sign is not
compliant because per code law, there should be overall sight plan for entire building including all
storefronts. Manny Carmona informed us that he is currently in discussions with the property owner
regarding the process of developing a sight plan. It was suggested with applicant that he (they) change
application to a temporary sign with the same size and graphic layout, but instead use less expansive
temporary material such as sign board. The temporary sign would be allowed in same location as
proposed permanent sign. Applicant informed us there are existing mounting holes that can be used to
fasten sign to façade. Applicant agreed less expensive temporary sign made sense pending outcome of
sight plan with building owner, since sign may be required to change. It was also agreed that if applicant
needs to reappear before board for revision, the same application fees could be applied.
Since the application is changed to a temporary sign, there is no decision / ruling by ARB as temporary
signs do not require approval of ARB.
Public Comment:
None
No members of general public besides other applicants were present.
Conclusion:
No ruling per above/ application changed to temporary sign.
Architectural Review Board
Dec 20, 2023
Minutes
pg. 2
2. 70 North Highland. Angel Mazariego. Application for siding.
Application presented by: Angel Mazariego
Board discussion:
Application includes covering existing dilapidated siding with insulation and vinyl siding on main
structure. New window casing will be added to bring out to match new siding depth. Corner molding
will be used to mate inside and outside corners. Soffits will be covered with new horizontal material,
and trimmed to match new siding. Existing siding and trimwork in entryway with arched openings will
be repaired and repainted and not covered with vinyl siding.
In addition front staircase to be replaced. Per discussion, new staircase should be comprised of: stone
stairs capped with bluestone or similar; sides of stairs should be tired stone, with stairstep following
profile of step treads. Railing should have angled handrail following tiered side stonework with vertical
posts and balusters.
Public Comment:
None
No members of general public besides other applicants were present.
Conclusion:
Application approved as submitted with agreement to follow decision per above with tiered stepped
down stone entryway, angled hand rail and vertical posts .
Motion by member Healey, 2nd by member Steinhorst. Approved by 4-0 vote.
Meeting adjourned = 7:20pm
Agenda
Architectural Review Board
December 20, 2023
7:00 PM
Agenda
1. 125 Main Street. Nyack Social. Application for signage.
2. 70 North Highland. Angel Mazariego. Application for siding.
Get email alerts for Nyack
A daily email when new agendas and minutes are posted.