Mayor Nold called the Committee-of-the-Whole meeting to order at 7:15 PM.
Members Present: Aldermen Zwart, Strey, Kowieski, Miller, Rosek, Shaw, Ellis and Spiegelberg
Staff Present: Mayor Nold, Kitsembel, Freber, Osborn, Pickart, Frye, Sullivan, Gallo, Buerger,
Duffy, Bleck and Coenen
Others Present: Atty. Riffle
2. Discussion on Options for North Lapham Street Bridge:
Frye gave a PowerPoint presentation on the North Lapham Street bridge stating it was built in 1950 and is
a single span steel deck girder bridge (one lane) over the Oconomowoc River. From the north, the bridge
services Oerding Park, nine homes and three vacant lots on E. Juneau Ave in the Town of Oconomowoc.
Next, he displayed area maps from 1941, 1963, 2005 and 2010 showing development over the years. With
the construction of Thurow Golden View Estates (113 lot subdivision) in 2004 and a traffic signal-controlled
intersection at E. Wisconsin Ave the City felt it wasn’t necessary to have a dedicated second access and
agreed to install a gate on Lapham St to close the bridge for 10 years. With the closure, the City
anticipated the Sufficiency Rating (SR) would decrease over those ten years so a new two-lane bridge
could be constructed. The SR is factored on a 100 based scale, and the rating must be below 50 to get
Federal funding (80%.) Today the bridge is at an SR of 50.8. Bridges are to be inspected biennially on
even years and the City has $13.4K in maintenance plus $4K in deck welding assigned to the bridge but
prior to moving forward we are looking for direction from the Committee to determine how the bridge will be
used in the future. Frye went over the options which included keeping the bridge the same meaning the
gates would remain closed until a two lane bridge is constructed but it would be open to pedestrian &
emergency vehicle traffic only; moving the gates and closing the bridge on north side but allowing
pedestrian and emergency vehicle traffic only; open the gate/bridge and modify approach for vehicle
stacking and adding signage for a one lane bridge; or fund the entire project for a two lane bridge including
design of the structure, bid project and construction with a cost estimated at $700K ($500K structure,
$130K approach work and $70K design engineering.) The Committee consensus was to keep the
condition of the structure safe for travel by fire trucks, keep the bridge closed as it is and do nothing else at
this time.
Motion by Rosek to adjourn the Committee-of-the-Whole meeting; second by Miller. Motion carried 8-0.
The meeting adjourned at 7:31 PM.
Minutes taken by
Diane Coenen, City Clerk