Committee of the Whole
Regular MeetingOconomowoc, WI · July 16, 2024
Minutes
City of Oconomowoc
Committee-Of-The-Whole Meeting Minutes
July 16, 2024 - 7:10 PM
Aldermen Present: Matt Mulder, Charles Schellpeper, Andrew Moroni, Matt Rosek, Jennifer Aultman Kloth, Kevin
Ellis, Karen Spiegelberg
Aldermen Absent: Chris Douglas
Also Present: Robert Magnus, , Eric Boettcher, Diane Coenen, Kevin Freber, Mark Frye, Jason Gallo, Jason
Herzog, Kevin Kaari, James Pfister, Laurie Sullivan-Murray, Ivan Lam
Mayor Magnus called the Committee-Of-The-Whole Meeting to order at 7:17 PM and appropriate meeting
notification was confirmed.
Committee Business
a. Capital Budget Overview
Sullivan-Murray gave a PowerPoint presentation providing instructions to Council on how to
download the detailed capital worksheets from the City website for each capital request. The next
C-O-T-W meeting will be July 23rd at 6:00 PM to go through each department's capital request,
starting with Utilities. If necessary, we will meet again on Thursday, July 25th to finish.
Adjourn
Motion to adjourn made by Ellis and seconded by Spiegelberg.
Motion carried 7-0-0.
The meeting adjourned at 7:24 PM.
__________________________________
Minutes taken by Diane Coenen, City Clerk
1
Committee-Of-The-Whole - July 16, 2024
Agenda
City of Oconomowoc
Committee-Of-The-Whole
Tuesday, July 16, 2024 - 7:10 PM
City Hall - Council Chambers
174 E. Wisconsin Ave. Oconomowoc, WI 53066
(or immediately following Utility Committee)
Notice: If a person with a disability requires that the meeting be accessible or that materials at the
meeting be in accessible format, call the City Clerk at least 48 hours prior to the meeting to request
adequate accommodations. Tel: (262) 569-2186.
1. Call to order and confirmation of appropriate meeting notification
2. Committee Business
a. Capital Budget Overview
3. Adjourn
________________________________
Diane Coenen, City Clerk
City of Oconomowoc
Notice is hereby given that a majority of the Common Council will be present at the above scheduled meeting to gather information
about a subject over which they have decision-making responsibility. This constitutes a meeting of the Common Council pursuant to
State ex rel. Badke v. Greendale Village Board, 173Wis. 2d 553, 494 N.W. 2d 408 (1993) and must be noticed as such, although the
Common Council will not take any formal action at this meeting.
1
MEMORANDUM
FINANCE DEPARTMENT
Date: July 16, 2024
To: Council, Mayor Magnus
From: Laurie Sullivan-Murray, Finance Director
Re: Capital Budget Kickoff
RELATES TO THE STRATEGIC PLAN
Strategic Goal-N/a
BACKGROUND
This meeting begins the 2025 Capital Budget process. The council will be presented with the 2025-2029
Capital Budget proposal. Included in your packet are worksheets for Council use while reviewing the
budget proposals. There is a separate worksheet for General Fund and for the Utilities. Also attached
are the 2025 Capital Budget Department Memo’s.
I will be reviewing with the Council the instructions for downloading and using the Capital Budget
spreadsheets including the details for each item proposed.
ADDITIONAL ANALYSIS
The Council will be presented with the 2025-2029 Capital Budget requests. The first Capital Budget
Workshop will be held next week on Tuesday, July 23rd, at 6:00 p.m. We have also reserved time for a
second workshop on Thursday, July 25th, at 6:00 p.m.
Department Heads will attend both budget workshops to review their requests and answer questions.
FINANCIAL IMPACT
TBD
RECOMMENDATION
N/A
SUGGESTED MOTION
No Motion required.
1
2
CITY OF OCONOMOWOC
LONG TERM FINANCIAL PLAN 2025-2029
SCHEDULE OF CAPITAL - LEVY FUNDS
Update 2025-2029
ol
Tab # Dept Funding Description 2025 2026 2027 2028 2029 u Council Notes
Clerk1 Clerk Levy Election Voting Machines $ 50,000
Police1 Police Levy Squad Car Replacement $ 202,279 $ 93,500 $ 93,500 $ 93,500
Police2 Police Levy Police Boat Patrol $ 61,692
Police3 Police Levy Radio Replacement $ 214,613
Police4 Police Levy Police Radar $ 33,561
Police5 Police Levy Virtual Reality Software Program $ 50,270
Police6 Police Levy Emergency Management Equipment for EOC Room $ 55,000
DPW1 DPW Levy Adaptive Management Program $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 75,000
DPW2 DPW Levy Widening/Shouldering Machine $ 65,000
DPW3 DPW Levy Plow Truck #49 $ 300,000
DPW4 DPW Levy Supervisor Pickup #71 $ 50,000
DPW5 DPW Levy Pickup #92 $ 55,000
DPW6 DPW Levy 1 Ton truck #42 to to 550 for salt brine tank sprayer $ 120,000
DPW7 DPW Levy Lake Barge with Outboard $ 180,000
DPW8 DPW Levy Sweeper # 45 Replacement $ 400,000
DPW9 DPW Levy Motor Grader # 28 Replacement $ 160,000
DPW10 DPW Levy 1 Ton truck #55 to 550 for salt brine tank sprayer $ 120,000
DPW11 DPW Levy Plow Truck #47 $ 315,000
DPW12 DPW Levy 1 Ton Dump Truck #39 $ 115,000
DPW13 DPW Levy Plow Truck #38 $ 315,000
DPW14 DPW Levy Backhoe Loader #29 $ 225,000
DPW15 DPW Levy 1 Ton Dump Truck #36 $ 115,000
DPW16 DPW Levy Zero Turn Mower Replacement $ 6,000
DPW17 DPW Levy Aquarius Lake Weed Harvestor $ 300,000
DPW18 DPW Levy Aquarius Lake Transport $ 290,000
DPW19 DPW Levy Aquarius Shore Conveyor $ 88,000
DPW20 DPW Levy DESIGN Street Program $ 125,000 $ 125,000 $ 125,000 $ 130,000 $ 130,000
DPW21 DPW Levy Street Maintenance Program $ 1,000,000 $ 1,000,000 $ 1,000,000 $ 1,000,000 $ 1,000,000
DPW22 DPW Debt Major Street Replacement Plan $ 1,800,000 $ 1,800,000 $ 2,000,000 $ 2,000,000 $ 2,000,000
DPW23 DPW Impact FeeExtension of Lake Bluff Drive $ 220,000 $ 2,000,000
DPW24 DPW Levy Second Salt Shed $ 300,000
DPW25 DPW Levy Insulate and Heat Cold Storage $ 100,000
DPW26 DPW Levy Restore Clock Tower $ 44,000
DPW28 DPW Levy Replace Elevator Controls $ 150,000
DPW29 DPW Levy Replace Overhead Doors at Public Works Shop $ 40,000
DPW30 DPW Levy Blower Attachment for Skid steer $ 45,000
DPW31 DPW Levy Scissor Lift with Trailer $ 25,000
DPW32 DPW Levy Asphalt Hot Box (Trailer Mounted) $ 57,000
DPW33 DPW Levy Additional Plow Truck $ 315,000
DPW34 DPW Levy Pickup Truck #73 a 2019 Chevy Silverado 55173 $ 55,000
DPW35 DPW Levy Brine Making Machine - not fleet - Building & Grounds $ 50,000
Library 1 Library Levy Chiller Coil Replacement $ 86,159
Library 2 Library Other Feasibility Study $ 30,000
Library 3 Library Levy Service Desk $ 30,000
Parks1 Parks Levy Westover Park - Play Equipment Replacement $ 45,000
Parks2 Parks Impact FeeNE Regional Park Development - Phase2 $ 70,000
Parks3 Parks Levy Tennis Court resurfacing $ 30,000 $ 30,000 $ 30,000
Parks4 Parks Levy Municipal Services Building - Doors $ 40,000
Parks5 Parks Levy Lily Park - construct 1/2 court basketball surface $ 45,000
1
3
CITY OF OCONOMOWOC
LONG TERM FINANCIAL PLAN 2025-2029
SCHEDULE OF CAPITAL - LEVY FUNDS
Update 2025-2029
ol
Tab # Dept Funding Description 2025 2026 2027 2028 2029 u Council Notes
Parks6 Parks Levy Lakeridge Park Playground $ 90,000
Parks7 Parks Other Bike/Ped Trail connections $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000
Parks8 Parks LVY/Util Cold Storage Building-Split w/Utility $ 380,000
Parks9 Parks Levy Lake Country Trail - Addition #5 $ 85,000 $ 40,000
Parks10 Parks Levy Hidden Ridge Pathway Repairs $ 15,000
Parks11 Parks Levy Truck #96-2009: Ford F250 3/4 ton $ 70,000
Parks12 Parks Levy Unit #98 - Toro Groundmaster mower/2015 $ 105,000
Parks13 Parks Levy Replace Truck #95 $ 65,000
Parks14 Parks Levy 3WD Super Rake #80 replacement $ 30,000
Parks15 Parks Levy Polar Trac #7210 replacement $ 65,000
Parks16 Parks Levy Additional New Wide Area Mower $ 105,000
Parks17 Parks Levy 2008 Toro Herbicide Sprayer $ 35,000
Parks18 Parks Levy 2012 SmithcoAthletic Field Conditioner $ 35,000
Parks19 Parks Levy Truck #81 - 2011: Silverado C2500 3/4 ton $ 75,000
Parks21 Parks Levy 525 gallon Water Trailer $ 15,000
Tech1 Tech Tech IT Upgrades $ 55,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000
Fleet1 Fleet Fleet Fuel Management Software Upgrade $ 30,000 $ 30,000
Fleet2 Fleet Fleet Replace Air Makeup Unit on Building $ 55,000
WLFD1 FIRE LVY/FirereWLFD 2024-2028 CIP $ 582,437 $ 605,897 $ 590,580
Totals $ 5,870,488 $ 7,415,650 $ 5,250,350 $ 4,283,500 $ 4,403,000
$ 5,870,488 $ 7,415,650 $ 5,250,350 $ 4,283,500 $ 4,403,000
check totals by year $ - $ - $ - $ - $ -
Funding Proposal
2025 Capital Requests $ 5,870,488
Debt Financing $ 1,800,000
Other Financing Sources $ 630,000
Unreserved Fund Balance $ 600,000
2025 Levy Requested $ 2,840,488
2025 Levy Available $ 2,300,000
Surplus Interest Rev $ 550,000
Remaining to be funded $ (9,512) surplus
Plan uses $150K of Reserved WLFD Referendum fund for Fire Capital
2
4
Capital Improvement FINANCIAL PLAN 2025-2029
SCHEDULE OF CAPITAL - UTILITY FUNDS
Update 2025-2029
C
Page # Dept Description 2025 2026 2027 2028 2029 ol Council Notes
Elec1 Electric New Services $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000
Elec2 Electric Primary Extensions $ 250,000 $ 250,000 $ 250,000 $ 250,000 $ 250,000
Elec3 Electric Voltage Conversion $ 500,000 $ 105,000
Elec4 Electric Customer Conversion $ 50,000 $ 50,000
Elec5 Electric North Feeder Ext CB85 to Vista $ 525,000
Elec6 Electric Bury CB75 Jefferson Sub to Industrial Park $ 600,000
Elec7 Electric Cooney replacement breakers $ 210,000 $ 210,000 $ 210,000 $ 210,000 $ 210,000
Elec8 Electric Develop New Areas IDd by System Study $ 500,000
Elec9 Electric Annual Street Project Relocations $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000
Elec10 Electric Auto Transfer Switches (System Study Est 5) $ 250,000 $ 250,000 $ 250,000
Elec11 Electric Electric Field Inventory GIS Asset Collection $ 140,000
Elec12 Electric Cable Replacement $ 525,000 $ 550,000 $ 575,000 $ 610,000 $ 630,000
Elec13 Electric Overhead to Underground Conversions $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000
Elec14 Electric Lapham St Bridge Replacement Duct Package $ 135,000
Elec15 Electric Street Light Additions/Replacements $ 20,000 $ 20,000 $ 20,000 $ 20,000 $ 20,000
Elec16 Electric Electric Meters - New & Replacement $ 550,000 $ 550,000 $ 550,000 $ 550,000 $ 450,000
Elec17 Electric Transformers - New & Replacement $ 2,000,000 $ 1,800,000 $ 1,500,000 $ 1,500,000 $ 1,500,000
Elec18 Electric Replace T27 1995 3 Reel Trailer $ 70,000
Elec19 Electric Replace Truck #5 - Utility Body Crew $ 95,000
Elec20 Electric Replace Truck #8 2015 - Foreman Pickup $ 55,000
Elec21 Electric Replace T33 2007 Sauber 3 reel turret trailer $ 70,000
Elec22 Electric Replace TBC21 2004 Butler trencher trailer $ 20,000
Elec23 Electric Replace Flatbed Tandem #14 a 2002 Freightliner $ 210,000
Elec24 Electric Replace T44 Trailer a 2004 Contrail $ 60,000
Elec25 Electric Replace Truck #94 Locating truck a 2021 Chevy $ 65,000
Elec26 Electric Replace Zero Turn Mower ZT2 a 2015 Grasshopper $ 10,000
Elec27 Electric New Utility Building $ 50,000 $ 2,000,000 $ 200,000 $ 20,000,000
Elec28 Electric Cold Storage Building (Electric Utility Portion) $ 127,300
Elec29 Electric Replace 2017 Small Aerial Truck #15 (63115) $ 225,000
Elec30 Electric Replace Shoring Box - Share w/Water Dept $ 15,000
Elec31 Electric Distribution Outage Repair Upgrades $ 20,000 $ 20,000 $ 20,000 $ 20,000 $ 20,000
Elec32 Electric Concrete Storage Area at Utility Building $ 100,000
Elec33 Electric Village green infrastructure $ 100,000
Elec34 Electric Regrade/fix flooding at end of Worthington/Cooney Sub $ 75,000
Elec35 Electric Replace Locating Unit $ 15,000
Elec36 Electric Relight South Main, Cross & Collins St $ 125,000 $ 125,000
Elec37 Electric Replace Cooney T8 - 50 yrs old in '29 $ 3,000,000
ELECTRIC TOTALS $ 5,870,000 $ 6,835,000 $ 4,545,000 $ 23,907,300 $ 6,350,000
Water1 Water Water Meters $ 595,000 $ 425,000 $ 335,000 $ 345,000 $ 355,000
Water2 Water Water Main (In Conjunction w/ Streets) $ 1,838,000 $ 1,281,000 $ 1,203,000 $ 1,500,000 $ 1,500,000
Q:\Dept Heads\lsullivan\2025 Budget\Capital\`Working Utility Capital Worksheets 2025-2029- Combined Utilities, Capital Util-Council Plan 1
5
Update 2025-2029
C
Page # Dept Description 2025 2026 2027 2028 2029 ol Council Notes
Water3 Water Distribution Water Mains & Valves $ 70,000 $ 70,000 $ 70,000 $ 70,000 $ 70,000
Water4 Water DNR Mandated Lead Service Line Replacement Program $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000
Water5 Water Well 2 Abandonment, Well 1 Reserve $ 200,000
Water6 Water Pine Hill Booster Station Redesign $ 100,000
Water7 Water Well 9 site acquision $ 50,000
Water8 Water Fire Flow Dead End Connections to Meet DNR Requirements $ 450,000
Water9 Water Ground Storage Reservoir at Wells 4 & 6 $ 750,000
Water10 Water Crew truck #10 replacement - 2013 Chevy $ 85,000
Water11 Water Crew van #24 replacement - 2013 Chevy $ 85,000
Water12 Water Replace 10" water main East WI Ave $ 525,000
Water13 Water Water System Study $ 60,000
Water14 Water New Utility Building $ 25,000 $ 1,000,000 $ 100,000 $ 10,000,000
Water15 Water Replace Backhoe Loader - 2012 3CX-15 $ 290,000
Water16 Water Replace Crew Truck # 9 2016 Ford $ 95,000
Water17 Water Replace roof at East & West Boosters $ 85,000
Water18 Water Olympia Tank under-lighting $ 25,000
Water19 Water Well #8 Pumping Station Eng - IRON FILTER $ 400,000
Water20 Water Worthington St Water Main Re-lay $ 250,000
Water21 Water Cold Storage Building (Water Utility Portion) $ 62,700
Water22 Water River Bluff Booster Stn - Replace Check Valves $ 50,000
Water23 Water Replace Shoring Box - Share w/Elec $ 15,000
Water24 Water Replace Hydro Excavator Truck 2011 Freightliner #58 63058 $ 350,000
Water25 Water Replace Zero Turn Mower 2019 Grasshopper 63051-ZT3 $ 20,000
Water26 Water Add VFDs to Well Sites and Booster Stations $ 55,000
Water27 Water Pressure Monitors (3) $ 15,000
Water28 Water East Standpipe Booster Station - rebuild $ 40,000
Water29 Water Replace doors at water facility stations $ 20,000
Water30 Water Fluoride Chemical Containment Upgrades $ 10,000
Water31 Water Well Head Protection Plans - Well #3 and Well #4 $ 75,000
Water32 Water Well 7 Repipe -after W8 online $ 125,000
Water33 Water Replace Water Main, Valves, Hydrants on S Main St $ 285,000
Water34 Water SCADA Fiber to Well Sites & Pump Stations $ 75,000
WATER TOTALS $ 3,668,000 $ 3,271,000 $ 2,863,000 $ 13,202,700 $ 2,745,000
WWTP1 WWTP Metering Station Upgrades $ 30,000 $ 30,000 $ 30,000 $ 30,000 $ 30,000
WWTP2 WWTP Sewer Main (In Conjunction w/ Streets) $ 950,000 $ 450,000 $ 450,000 $ 500,000 $ 550,000
WWTP3 WWTP Treatment Plant Upgrades-HVAC $ 350,000 $ 20,000 $ 15,000 $ 15,000 $ 15,000
WWTP4 WWTP Wastewater Plant Pavement Work $ 100,000
WWTP5 WWTP Replace RAS Piping from Secondary Clarifiers $ 200,000 $ 1,500,000
WWTP6 WWTP Replace Existing Aeration Blowers $ 360,000
WWTP7 WWTP Add Biological Phosphorus Removal and methane generator $ 2,000,000 $ 2,500,000
WWTP8 WWTP Replace safety Grating $ 50,000
WWTP10 WWTP Pump station-Submersible pumps $ 45,000 $ 47,500 $ 50,000 $ 50,000 $ 50,000
WWTP11 WWTP Lift Station SCADA System $ 80,000 $ 80,000 $ 80,000 $ 80,000 $ 80,000
WWTP12 WWTP Replace Truck #19 2006 Chevy $ 55,000
Q:\Dept Heads\lsullivan\2025 Budget\Capital\`Working Utility Capital Worksheets 2025-2029- Combined Utilities, Capital Util-Council Plan 2
6
Update 2025-2029
C
Page # Dept Description 2025 2026 2027 2028 2029 ol Council Notes
WWTP13 WWTP Replace Truck #87 2010 Ford $ 60,000
WWTP14 WWTP Roof Safety Equipment $ 37,000
WWTP15 WWTP Lift Station Roofs and WWTP Building Repair $ 125,000
WWTP16 WWTP OWPP Skid Steer and brush head to remove Buckthorn $ 275,000
WWTPZT WWTP Replace Zero Turn Mower ZT2 a 2015 Grasshopper $ 10,000
WASTE WATER TOTALS $ 2,657,000 $ 4,127,500 $ 3,185,000 $ 685,000 $ 725,000
UTILITY TOTALS $ 12,195,000 $ 14,233,500 $ 10,593,000 $ 37,795,000 $ 9,820,000
Funding Source
Total by Year $ 12,195,000 $ 14,233,500 $ 10,593,000 $ 37,795,000 $ 9,820,000
Electric Utility $ 5,870,000 $ 6,835,000 $ 4,545,000 $ 23,907,300 $ 6,350,000
Water Utility $ 3,668,000 $ 3,271,000 $ 2,863,000 $ 13,202,700 $ 2,745,000
WasteWater Utility $ 2,657,000 $ 4,127,500 $ 3,185,000 $ 685,000 $ 725,000
Q:\Dept Heads\lsullivan\2025 Budget\Capital\`Working Utility Capital Worksheets 2025-2029- Combined Utilities, Capital Util-Council Plan 3
7
TO: Laurie Sullivan, Finance Director
From: James Pfister, Chief of Police
RE: Capital Budget Changes
______________________________________________________________________________
Newly added items for Capital:
• 2028 Emergency Management Equipment for EOC Room at Public Safety
Building
• 2027 Virtual Reality Software Program
Updated Items to Capital:
• Radio Replacement obtained with an updated quote to have pricing more
consistent for the 2025 budget.
• Police Radar obtained with updated quote to have pricing more consistent
for the 2026 budget.
• Police Boat Patrol obtained with an updated quote to have pricing more
consistent for the 2026 budget.
• Squad Car replacement obtained with updated quotes to have pricing
more consistent for the 2025, 2026, 2027, and 2028 budget.
Rspectfully,
James P. Pfister
8
MEMORANDUM
PUBLIC WORKS
Date: May 23, 2024
To: Laurie Sullivan
From: Jason Herzog, Director of Public Works
Re: 2025-2029 Capital Budget
DESCRIPTION
Changes and additional items in Capital budget
• Minor price adjustments listed in red and details were provided on the far column due to updated price
provided
• Dpw 22 – Design engineering – increase to $125k/yr from $60/yr
o Amount was increased to the amount of work being requested and the work is more
complex requiring addition design and surveying work needed.
• Dpw 24 – Major street work – increased to 1.8M/yr from 1.5M
o The department reviewed the entire City street and requested additional funds to be
used to do more street work to maintain a 30 year replacement program on all streets in
the City.
• New 1 – Skidster snowblower attachment – addition to the 2025 budget $45k
o The department is being required to remove snow along the trails throughout the City.
There is over a 1 mile stretch on hwy 67 is needed and in the large snow events only the
loader and bucket can be used. This equipment currently must be used due to the large
snow amounts pushed from the 3 lanes of snow being pushed onto it from the hwy and
usually 1-2 days after an event. The loader and bucket can only push so much and then
need to dump on the side. This tends to damage all the edges and is much slower. The
blower attachment will allow for clean clearing and the crew will be able to spend less
time considering additional trails being installed in the next couple years that the City will
be responsible for.
• New 2 – scissor lift & trailer – addition to the 2026 budget $25k
o Building maintenance has had to rent a lift to safely complete maintenance on lights,
water pipe repairs, hvac, and other mechanical work. Currently the City has limited
equipment for this.
• New 3 – Hot box & trailer – addition to the 2026 budget $57k
o Currently the crews uses a smaller box in the bed of truck. The current one needs to be
replaced. This unit will be larger capacity and have the flexibility to be used quickly and
allow for the bed of the truck to be free for other equipment, reducing the need for
additional trucks going to the same place.
• New 4 – plow truck – addition to the 2029 budget $315k
1
9
o The City approved an additional crew member in 2024. The addition of the truck will
provide coverage to the snow events with staff. The City street system has grown
tremendously, and continues to expand the amount required to clear.
• New 5 – pickup truck 73 replacement new for the 2029 budget - $55k
o This is a 2019 model
• New 6 – Brine machine – new for the 2029 budget - $50k
o The original machine and tank was purchased in 2018.
V:\Budget\Capital\2025 Capital Budget Memo.docx
2
10
MEMO
TO: Laurie Sullivan, Mark Frye
FROM: Jennifer Puccini, Library Director
DATE: July 11, 2024
SUBJECT: 2025-2029 Library Capital Request
The library has three new requests for the 2025 Capital Budget.
• Chiller/Coil replacement in one of the four air conditioning units.
• Funds for a feasibility study, so we can focus on fundraising for a possible future renovation.
• New Service Desk, so we can combine our two current desks into one service desk to better serve our
patrons.
These requests were not made last year because Library staff were not aware of the needs until after the previous
capital budget process.
11
MEMORANDUM
To: Laurie Sullivan, Director of Finance
From: Eric Boettcher, Director of Parks, Recreation & Forestry
Date: May 24, 2024
Re: Capital Budget Planning Updates
After reviewing the CIP plan for 2025-2029, the following items for the Parks department have
been updated. The additional amounts are listed below and have been updated on the budget
sheets that were provided.
Parks Item #2 – Northeast Regional Park Development Phase 2.
An additional $70,000 was added for planning and future amenities for park development. This
would be taken out of park impact fees. The addition is needed for a future RFP for design of
future park.
Parks Item #16- Lake Country Trail Addition #5
This trail expansion is a partnership between Waukesha County Park and Jefferson County
Parks for the expansion of the Lake Country Trail that will expand towards the east beginning
on 2nd Street in Oconomowoc. An additional $40,000 is needed in 2026 for this project.
Q:\Dept Heads\lsullivan\2025 Budget\Capital\Dept Memos\2025 Parks Capital Budget Memo.docx
12
MEMORANDUM
UTILITIES: WATER, ELECTRIC & FLEET
Date: June 4, 2024
To: Laurie Sullivan, Mark Frye
From: Kevin Kaari, Utility Manager
Re: 2025-2029 Water, Electric & Fleet Utility Capital Budget Changes
DESCRIPTION
Water Utility Budget Changes 2025 – 2029 Summary:
The changes to the Water Budget for the 2025 – 2029 LTFP are shown in red text on summary tab “Capital Util-
Council Plan”, with additional details provided on the far-right, in column AX, “2025-2029 Notes”
In summary:
• Items highlighted in yellow - Water Main (Water2) and Replace 10” Water Main E WI Ave
(Water18) numbers are subject to change based on information coming in June ‘24, from DPW
street project meetings.
• Items highlighted in yellow – Well 8 Pumping Station (Water28) and SCADA fiber to well sites
(NEW12) depend on Well 8 information/bids coming at end of June
• Items highlighted in green (Water9, Water10) have been moved out to “future” (beyond 2029) as
they are based on pending new development
• Items highlighted in grey: GIS Mapping and System Automation (Water5) moved to Ops budget,
Install Natural Gas Heaters at Well Sites (Water34) removed -no longer pursuing, and Remove
Valve Box Extenders (Water35) has been combined with Distribution Water Mains & Valve
Extensions (Water3).
• Cost changes indicated are for City wide growth (additional quantity), inflation, and additional
needs. These include:
o Water Meters – New Dev & Emergent Replacements and 20 Year Replacement Units (new
in 2024) (Water1) –increased from $1.3M to $2.1M over 5-year time frame for 20-year
replacements and meter head replacements on larger meter sets that fail after 10 years
due to battery life. These categories will continue into perpetuity.
o DNR Mandated Lead Service Line Replacement (Water6) – decreased from $1.9M to
$250k due to “free money” grant programs ending
o Crew van #24 (Water15) increased from $55k to $85k in ’26 due to changing from a van
to a 1-ton truck with a liftgate.
o Replace crew truck #9 (Water23) increased $10k to include a V-plow and a salter.
• Specific to 2025, we added several pieces of equipment and grounds maintenance items,
identified recently, as emergent needs
1
13
o Replace shoring box (share w/electric) (NEW1): $15k. Added for safety and new box is
lighter and easier to install
o Add VFDs to well sites and booster stations: (NEW4): $55k VFD will allow pumps to slowly
ramp motor speed up and down -- extends the life of the pumps.
o Add pressure monitors (NEW5): $15k Remote device that can be temporarily placed on
any hydrant in the system to report system pressure values in real-time
o East Standpipe Booster Station -rebuild (NEW6): $40k Rebuild 2 booster pumps, motors
and equipment similar to the East Booster Station emergency rebuild in 2023 (same
vintage pumps)
o Replace doors at water utility stations (NEW7): $20k Replace rusted doors at Well 3 & 7
and Pine Ridge Booster Station
o Fluoride Chemical Containment (NEW8): $10k Upgrade to twin wall containers to capture
leaks from primary container at all pumping stations.
• New future replacements:
o Replace Hydro Excavator (NEW2): $350k in ’28 to replace old unit
o Replace zero turn mower (NEW3): $20k in ’29 to replace old unit
o Well 7 Re-pipe (NEW10): $125k in ’27 after Well 8 is in-service. Replace the aged ductile
iron piping at well 7
o Replace Water Main, Valves and Hydrants on S Main St (NEW11): $285k in ’27 Replace
aging infrastructure in conjunction with street program.
Electric Utility Budget Changes 2025 – 2029 Summary:
The changes to the Electric Budget for the 2025 – 2029 LTFP are shown in red text on summary tab “Capital Util-
Council Plan”, with additional details provided on the far-right, in column AX, “2025-2029 Notes”
In summary:
• Cost changes indicated are for City wide growth (additional quantity), inflation, and additional
needs. These include:
o New Services (Elec1): Increased yearly budget from $55k to $100k
o Primary Extensions (Elec2): Increased yearly budget from $150k to $250k
o Electric Meters (Elec22): Increased yearly budget from $450k to $550k
o Transformers (Elec23): Increased 5-year budget from $4.4M to $10.9M
o Cable Replacement (Elec15): Increased 5-year budget from $2.5M to $2.9M
o Street Light Additions/Replacements (Elec18): Increased 5-year budget from $50k to
$100k
• Several projects extended into additional years or moved based on emergent development and
project information
o Cooney Replacement Breakers (Elec8): Now a multi-year project to replace all breakers.
Increased from $210k in ’26 to $1.1M over 5 years (’25 to ’29) -- Age and condition based.
o Auto-transfer Gear (Elec12): Changed from $675k in ’26 to $750k over 3 years (’25 to ’27)
o Distribution Outage Repair Upgrades (New3): Changed from $20k in ’24 to $20k/year
ongoing (for minor upgrades to distribution system in associated with customer outages)
o Bury CB75 to Industrial Park (Elec7): Budgeted $550k in ’24, won’t occur until ’26 and will
cost $600k then.
• 3 pieces of equipment pushed back based on equipment condition (Elec33, Elec36, Elec38):
o T33 3-reel trailer (Elec33): Moved from ’25 to ’29 and increased from $60k to $70k
o T44 trailer (Elec36): Moved from ’27 to ’28 and increased from $50k to $60k
2
14
o Replace Zero Turn ZT2 (Elec38): Moved from ’25 to ’28 and share with WWTF $10k
• Removed from budget:
o Installation of Distribution Capacitors (Elec11): Was originally $275 in ’25.
o Fuel Management Software (Elec13): Originally $80k in ’25. Moved to Fleet ’25 &’26
• Specific to 2025, added several pieces of equipment and grounds maintenance items, identified
recently, as emergent needs
o Replace shoring box (share w/water) (NEW2): $15k. Added for safety and new box is
lighter and easier to install
o Concrete TR Storage Area (NEW4): $100k. Added per SPCC Plan (oil-spill containment)
o Village Green Infrastructure (NEW5): $100k for changes/additions required
o Upgrades to alleviate flooding near Cooney Sub (NEW6): $75k
o Replace locating unit: (NEW7): $15k
• New future replacements/projects:
o Re-light South Main, Cross & Collins St (NEW8): $250k in ‘28
o Replace Cooney SS Transformer #8 – 50 years old in ’29 (NEW9): $3M in ‘29
Fleet Budget Changes 2025 – 2029 Summary:
Added 2 new capital projects.
In summary,
• Fuel Management Software Upgrade (NEW1): $30k in ’25 and $30k in ‘26
• Replace Air Makeup Unit on Fleet building: (NEW2): $55k in ‘25
3
15
Memo
To: Laurie Sulivan
From: Kevin Freber
cc: Mark Frye
Date: 05/23/2024
Re: Changes to LTFP Wastewater
1. WWTP2- Sewer Main and Lapham St – added $400,000 for moving force main due to
Lapham St. bridge project.
2. WWTP4- Treatment Plant HVAC – Added $335,000 to replace MAU, building heaters,
ductwork, and insulation.
3. WWTP5-Lift Station Pavement – Changed title to include WWTP pavement.
4. WWTP8- Replace Existing Aeration Blower – Updated cost.
5. WWTP20 (NEW)-Roof Safety Equipment-add due to safety violations.
6. WWTP21(NEW)-Lift Station roofs and WWTP repairs – multiple lift station roofs and
treatment plant tuck pointing ect.
7. WWTP22 (NEW)-OWPP Skid Steer and brush heads to remove buckthorn - Skid Steer,
Trailer, brush head, forks and bucket.
8. WWTP23 (NEW)-Pipe Painting- Paint pipes that are ductal and are critical.
16