Home Association Meeting
Regular MeetingOgden Dunes, IN · February 24, 2025
Minutes
ODHA
Ogden Dunes Home Association
115 Hillcrest Rd, Suite 111, Ogden Dunes, IN 46368
ANNUAL MEETING
Monday, February 24, 2025
Meeting Minutes
Board Members Present: Maryann Schaefer, Andrew Gurschick, Laura Brennan, Karen Tallian,
Phil Hargarten, Jack Hazen, Nancy Ashby
Establishment of Quorum
Karen Tallian noted that, based on membership numbers, a quorum requires 18 attendees
either in person or online. With 30 online attendees present in addition to those in person, a
quorum was established.
Approval of Meeting Minutes from 2024:
The 2024 meeting minutes were made available to all members. Eric Kurtz motioned to
approve the minutes; Karen Tallian seconded. The motion passed unanimously.
Treasurer’s Report
Maryann Schaefer presented the 2024 operations budget. ODHA had 357 paying members,
putting membership revenue approximately $2,200 over budget. Summer programs fell short
of budget by $1,800, while the soccer program came in close to budget ($5,882 vs. $6,000). The
community garden met budget expectations, though Maryann noted necessary future
improvements.
Overall, the organization ended the year with a net positive of $569 after expenses for summer
camp, soccer, park maintenance, tree cutting, legal and accounting fees, and a $10,000
donation to the pavilion project. Maryann also noted ongoing increases in professional and
maintenance costs.
For 2025, membership rates will remain unchanged. However, mowing and landscaping costs
are expected to increase due to additional space around the pavilion. Electricity and water costs
are also expected to rise, and summer camp staff wages will increase to cover ODHA’s portion
of payroll taxes. ODHA will continue to contract accounting services due to the new 501(c)(3)
filing requirements.
ODHA is implementing new financial software, Xero, with assistance from accounting firm CLH,
CPA. The system will enhance revenue and expense tracking and support improved financial
forecasting and reporting.
Karen Tallian moved to accept the 2024 year-end financials and the proposed 2025 budget.
Laura Brennan seconded. The motion passed unanimously.
OLD BUSINESS
Community Fund Grants
Maryann reported receipt of two grants:
• $4,058.88 for a water fountain with a dog bowl and water bottle filler
• $1,500 for repairs to garden beds in the community garden.
Work is scheduled to begin in the spring.
Online ODHA membership/summer camp Software Update:
Andrew Gurschick stated that past issues with ad pop-ups and membership sign-ups have been
resolved. The software includes a processing fee, which ODHA does not pass on to members.
The system now supports summer camp registration and donation collection.
Soccer Update:
Glenn Seerup shared that two teams—ages 8 and under, and 10 and under—are at capacity,
with additional interest that could justify adding more teams. The Kiddie Kickers program for
ages 3–5 continues. Glenn announced he is stepping down after 12 years of leading the
program. He recommended appointing an ODHA member as a liaison to help transition
leadership, noting that without new leadership, the program cannot continue.
Summer Camp Update:
Deb Pratt will return as program director this summer. Camp rates will increase to $125 per
week for members and $150 for nonmembers, with a $50 discount for those registering for all
four weeks. Deb will step down after this season and assist with hiring and training a new
director.
Community Garden:
Michael Bill Smith continues to manage the garden. He will contact current members to confirm
participation and recruit new members via email and Facebook. Several plots are reserved for
donations to local food pantries.
NEW BUSINESS
501c3: One of our biggest updates is that we received our 501c3 status on June 28, 2024. We
were able to do this because, unlike most other HOAs, we do not require membership, and all
members/non-members are able to make use of ODHA property/amenities. The process was
arduous and included updating our bylaws.
ODHA consulted with naturalist Sandy O’Brien from EAB to assess land north of the pavilion and
nearby sand tracks. Restoration costs are estimated at $8,200. The board is also exploring the
installation of new tennis courts with pickleball striping and fencing ($117,000–$137,000) and
replacement soccer goals ($13,000–$19,500).
Given budget constraints, ODHA will seek community donations. Members may contribute
cash, stocks or investments directly to ODHA’s investment company.
Election of New Officers
Board Vacancy
One vacant seat, with a term ending in March 2027, was open for nomination. Frank Lani
nominated himself. Jim Slawinski seconded. With no other nominations, and confirmation of
Frank’s membership status, Karen Tallian closed the nomination. The motion passed
unanimously.
Board Reappointments
Three board positions expiring March 31, 2025 with terms of 4 years, were up for
reappointment.
• Karen Tallian nominated Nancy Ashby for a new four-year term; Laura Brennan
seconded.
• Karen renominated Laura Brennan; Pat Maxwell seconded.
• Karen renominated Jack Hazen; Maryann Schaefer seconded.
•
With no additional nominations from the floor or Zoom, Karen called for a vote by acclamation.
All were in favor.
Officer Elections
Karen Tallian motioned to retain the current officer roles:
• Andrew Gurschick, President
• Karen Tallian, Vice President
• Maryann Schaefer, Secretary/Treasurer
Nancy Ashby seconded. The motion passed unanimously.
Pavilion Update:
Andrew expressed his appreciation to the board for the many hours of work dedicated to the
project. He noted that the current field house sits on land leased by the town to ODHA in 2002.
To accommodate the new pavilion, ODHA requested an additional acre of land from the town.
The lease was approved at a cost of $10 for a 40-year term.
Thanks were also extended to John Hannon and his engineering firm, Tom Cleland, the general
contractor, and Adam Levy, the architect, all of whom donated their services to the project.
The pavilion project is a long-standing goal, supported by the town's master plan, which
identified the pavilion as the number one priority from resident feedback.
Some older residents expressed concerns about the original pavilion location, citing
inaccessibility, lack of pathways, and limited investment. In response to community feedback,
the final site was selected for full ADA accessibility and to minimize noise impact on nearby
homes. The pavilion ramp will have a gentle 1:20 slope, eliminating the need for railings.
.
The team decided to proceed with the design of a pavilion made of cedar with a black metal
roof, including a fireplace and built-in buffets for food storage during rentals. The pavilion's
dimensions are 44 feet by 28 feet, with a height of 12 feet. An anonymous donor fully funded
the new bathrooms, which were not part of the original plan for the pavilion. The pavilion can
comfortably accommodate 80 to 100 people. The decision to proceed with the Pavilion project
was based on the community's support and funding through donations, with no reliance on tax
dollars.
Bathroom Design Overview
The new bathroom facility will include a men's room with a urinal and toilet, a women's
room with double vanity and two toilets, a janitor's closet, and a family restroom that is
fully ADA compliant with a baby changing table. It was decided that the bathroom
facility will be available for summer programs and rented events, ensuring accessibility
during these times. The bathroom building will be climate controlled, with HVAC and
heating, and will have hot water, which the current bathrooms do not have. The
bathrooms will only be open during soccer programs, highlighting operational
limitations due to maintenance costs.
Site Plan:
The site plan showed the location of the pavilion on the north side of the pitch. This
location allows for proximity to the roundabout with handicapped parking. There will
be a path with chevron pavers that lead to the pavilion – with donation bricks
intermingled throughout. There will be benches along the path and grassy areas for
people to watch the field from a higher vantage point. There will also be a patio area.
Support columns are set two-feet in, allowing 5-feet to get into the pavilion and access
the bathroom. The plan was designed without the need for a retaining wall.
One of the reasons we needed to lease land from the town was the condition of our
current septic field. Over 22 years, it had gotten grown over and was no longer usable.
John McQuestion with Soil Solutions pulled 8 core samples to see where we could locate
the septic field. One of the first areas near the water fountain would have interfered
with the soccer field. Another spot was where the new bathrooms will be placed, which
leaves the current selected spot which needed to be cleared.
Ecological Restoration Discussion
Laura Brennan, a board member who is a restoration ecologist who has worked to
restore areas around the town for the last 23 years, indicated that the clearing was done
to protect the investment in the structure and for engineering purposes, with around
half of the removed trees being non-native invasive species such as tree of heaven,
mulberry, and Siberian elm. The environment that did exist wasn’t healthy with a dense
tree canopy and little diversity in the understory. The individual whose company did the
land clearing is a certified arborist. There is a plan to restore the area using native
landscaping and trees, with a focus on pollinator-friendly species to enhance the habitat
and provide educational opportunities for residents..
Because we need a mounded septic system, if everything works out, ODHA is proposing
a sledding hill that can be enjoyed by residents it that space. It is a safe space without
anything to hit. Because the area needs to be clear for the septic system, the project
aims to restore the space to a prairie or savanna without trees which will not require
mowing, thus saving costs.
The board agreed to work with landscape architects to develop a detailed plan for the
restoration and stabilization of the area. Laura indicated that the engineers and
landscape architects aren’t concerned about erosion because tree roots and trees at the
top of the dunes were left intact. While there isn’t concern, there is a plan in
development with the landscape architect using hydro seeding and erosion comfortable
blankets/fabric.
Scott Kingan asked Laura to talk about what the town’s natural tree covering would be.
Laura indicated it would be 20-40% coverage (oak savannah) vs. the current 60-80%.
Budget Overview for Project
The project is fully funded through donations, with a total of $528,000 received and
over $16,000 accumulated in interest and investment income. Including in-kind
donations, we have over $628,000 accumulated.
The budget for the pavilion is $380,000 and for the bathroom is $100,000 (before
clearing for septic) with additional costs anticipated for site preparation and tree
removal. Andrew went through the budget and costs to date highlighting that $50,000
of the bathroom donation has not been received, bringing total revenue toward the
project to close to $700,000.
Event Planning
The board will be conducting a competitive analysis of other event spaces to determine
pricing and rental terms for the Pavilion, which will be available for events.
The Memorial Day town celebration will still take place during construction. The pavilion
will be delivered a week after Memorial Day and we are hopeful that it will be
completed in time for the Labor Day games. The team is excited about organizing more
community events, including story time with Santa, chili cook-offs, cooking classes,
movie nights, etc.
Design Considerations
Nancy Ashby discussed working with Betsy Marvelis on the furniture – picnic tables –
that will be in the pavilion ensuring that it does not have an industrial look and is visually
appealing. It was decided that the interior lighting will be minimized to maintain the
aesthetic.
PUBLIC COMMENT
A question was taken from the floor about wheelchair access to the interior of the pavilion.
Andrew indicated that the bathroom, pavilion and pavers being roughly the same height with
the floor being concrete.
Brenda Spape, 3 Cedar Court, asked to see drawings of the pavilion again. Andrew indicated
that the height from the ground to the bottom of the roof line is approximately 12 feet, with
structural beams being closer to 12.6 feet. The design includes five columns for support, which
were modified to four to accommodate a double gable design. He also highlighted that the
fireplace is placed behind the woodwork so we don’t have to cut into framing.
Brenda also asked if we were going to have ceiling fans. Andrew indicated that we are not, as it
would not fit the aesthetic, and the structural supports from the roof do not allow space.
She also asked where the sledding hill would be and Andrew indicated it would be to the left
side of the current field house in the area that is cleared for the septic field.
There were no additional questions from Zoom or the floor.
Donation Process and Community Engagement
The donation options include in-person donations via check or credit card at town hall, and
online donations through the Ogden-Dunes website. Specific donation tiers include: $250 for a
4x8 brick, $500 for an 8x8 brick, $750 for a 12x12 brick, and $2,500 for a bench with a plaque.
Donations of $5,000 and above will receive naming rights near the pavilion, which is fully
funded by a single donor.
Karen Tallian moved to adjourn.
Maryann Schaefer seconded.
All were in favor.