Neighborhood Districts
Regular MeetingProvo, UT · February 21, 2024
Minutes
Neighborhood District 3 Meeting Minutes for 2/21/2024
There were no objections to the new developments introduced to District 3 residents attending the
meeting.
1. Department Topics (6:00-6:30 PM)
A. 2050 West Speed Study (Traffic Manager Vern Keeslar, Provo city engineering
division look at speeding on 2050 West). South of gas station along 2050 W short of 600
South. Looked at crashes for the last 3 years. Rural areas 5 years. 3 years one crash
distracted driving, no injuries. Look at the crash data, not significant amount reported.
Please report crashes, call the police.
Definitions: Average Speed, 85th percentile, Volume.
2050 is a collector in this area, north of center street it is an arterial.
85th percentile on a collector or arterial, speed limit is raised? Arterial
35, most speeds in Provo are 25, not more than 35, maximum speed. Lakeview
Parkway is 45 mph. This part is 25 mph. 85% of vehicles were going at that speed
or lower.
Data Sept Th-Sun 73 hrs, 25 mph, northbound average speed was 25 mph.
Southbound average speed 20 mph
Average 27 mph.
2 going over 50 mph northbound.
136 going 26-30 mph.
4,615 total volume, 63 vehicles / hr or 1,517 daily
Functional class: Local lots of access, residential road
Collector: fewer access, more traffic volume, higher speed
Arterial: Low access, higher speed
Interstate: No access high speed
One crash, 22mph average, 85% 27 mph, 8,595 total vehicles,
Speed limits good. 4 speed limit signs, southbound, northbound and 2 in
between.
Noncompliance is a good time to remind drivers at the highest speed point.
$3500 speed signs, can purchase two.
Can we schedule another study once the park is completed and during game
season? A study in winter or prior to heavy traffic season. Get a full year after the
park opens before another speed study. Yes, we can do another study.
B. Updates on Delta Gateway Park, West Park, Fort Utah Park & Greenway, Sports
Park (Parks Projects Manager John Bunderson).
1. Rock Canyon Trailhead improvement:
1. Public Works aquifer storage and recharge project Provo River
mouth of canyon waters released flow towards trailhead
creating natural water effects.
2. Improving the parking lot and trailhead to accommodate off-
street parking. Streets lined with visitor vehicles. Creating more
off-street parking and talking to UTA for transit options.
3. Master Plan for improvements: Trailhead, roundabout, closing
one trail request from National Park service, creating 3 new
interpretive trial loops, geology, animal, plant life in rock canyon.
New amphitheater area, new rock-climbing area for beginners
with soft fall area below.
2. Delta Gateway Park - Lakeshore Drive by Provo River in conjunction to
Delta River Project connector to all trails to both new Provo River trail
sections and old trail going to state park as well as trail upriver. Why no
flow through old channel, hurts CLAS ropes business. Parks had not
input into that. Diversion construction regulated by bureau of
reclamation, regulate flows in old channel, suggest reach out to them,
website, June sucker, Utah Lake mitigation commission. Federal project.
Legislative bills signed back in the 90s, longtime in the planning.
Involvement contained in the master plan. Provo River trail is county
property, not city property. Becky Bogdin asked, told has to go, can’t
tell another government entity, has to be done through residents
getting together. Have the right to go to them. Do the same thing,
concerned, we do not have the right to tell them, it’s not property right,
it’s water rights. Confused about the plan for that area, will the water
drain? Stagnant? They will create a fishery there. Introducing air, small
boat craft launch areas by county, making some improvements.
JuneSuckerRecovery.org. Park completed Spring 2025.
3. West Park - New basketball court, new swing set, Revamped irrigation
system, Improve access and parking.
4. Fort Utah: Sake, BMX, pump track, jump lines, skate park replacement
with all wheels facility, new playground, new restrooms, parking
improvements to bring on street to off street parking add one more
row of stalls. Consultant coming on to get design.
5. Question: Matt Peterson: Looks like pump tracks already there, fairly
poured asphalt, crumbling, concerned looks out of place and
rough=shod, is this the final location? What is shown is a modular pump
track fabricated temporary structure as get into removal of skate park.
Not the permanent structure to maintain a level of service for youth in
the area. Asphalt is mill tailings crushed recycled asphalt product for
temporary use for moisture. Completion next year. Will the playground
be in the same location? As we develop a plan, will replace the current
playground and restrooms. Love new baseball set up, location of
playground cannot see from game. If you can put the playground where
parents from stands can see the playground. New Lakewood Park,
Becky invited to come to give opinion. Bringing on a consultant to
gather opinions.
6. Epic Sports Park: PM Fall this year complete north section 15 sports
fields, restroom, central plaza restroom gathering for teams. South and
north playgrounds, perimeter walking trail around and in middle, 3
miles open to public 24/7. Multi-use best as we can with sports facility.
4 parking lots, 500 trees shrubs, sod going in, open to play. Question:
Food trucks have a designated area instead of in parking lot? Have
electrical stubs around the center plaza area, in parking area. Has the
park and recs department considered food truck scheduling? Alleviate
heavy traffic in areas by allowing food trucks. Mom of two distance
runners: Will the park cater to cross country events? Down to sports
programmer, trails around, quality of turf a concern, yes want to multi-
use, frisbee, lacrosse, soccer, cross country. House there, love access
and trails. 24/7 nervous about lights? Fields will not be 24/7 but secure
through parking lots and roads. Lighting all of parking and streets. Ball
fields will not be lit. Complaints about FootPrinters, how will this be in
compared to…no field lighting. Just parking safety lighting. No night
games, no field lighting. What about a fence, yes on street on the park
side. Committed to property owners a barbed wire field fence. Before
opening. 3 ft 3-4 strand barbed wire fence. Surveyors cannot decide
where the property line is. Will follow up with surveyor. Talk to you
tomorrow or Monday with property issues.
7. Provo Dog Park: one at bicentennial park. On leash pets allowed on
trails and in parks. Pet waste stations provided by Provo City, new dog
park facilities being identified, parks and rec is working with a special
task force of community members and dog park designers. Important to
everyone but never makes the list. In design, neighborhood attentions.
Question: Is there a need? Advocating for a dog park? Bicentennial a
mess, dogs run free, don’t clean up. Dog parks are the worst for dogs.
Last 7 years 2 people reach out for dog parks. SE and Grandview want
them to be on the west side. Need to express that. Local parks just an
area fenced where dogs can run so you don’t get a ticket if you want to
let your dog run. Irrigation, taking up greenspace, hard to take
greenspace. 5-10% user base. 6800 just to fence. Taking greenspace
from a majority user group. Not backing up to neighboring properties.
Put them in the right location. How do they survey that population.
Want them on leash but how do you survey. Neighborhood meetings.
Part of master planning process, statistically survey, not in the top 10.
Multiple surveys. New park, brought to neighborhood and design
process. West Park, part of that discussion, Fort Utah, will bring it up.
Mutual decision between department and community served. Open
space for pets to be let loose, learned the reserved space is typically too
small. Grassy nice to start, burned out, too course first time, switched
to a finer material, couple iterations of bicentennial. Learning from
other facilities, how to best address, it’s being explored, actively looked
at, pets are allowed on leash in public facilities, just off-leash is a
problem.
2. Planning Items (6:30-7:00 PM)
A. Dudley & Associates requests a Zone Map Amendment from the A1.5 Agricultural
Zone to the R1.8 One-Family Residential Zone to create a 3-lot single-family subdivision at 1342
N Geneva Rd in the Lakeview North Neighborhood. Nancy Robison 801-852-
6417 nrobison@provo.org PLRZ20240018.
B. Colliers’ Dan Ford and Liz Raff proposed project.
1. Dudley: They have application in department review process, not in city
council yet, Roger Dudley engineer for developer, 1.5 acre on Geneva
Road want to divide into 3 lots to build 2 additional residents. 1. Zone
change R1-8 zoning. No sewer in front of property some south and north,
need to put in sewer main in Geneva Road, UDOT controlled discuss
access. Agreed to two access, not three. Two lots will have a shared
access, then other log will have its own access, trying to space along
Geneva Road. Custom Home designs.
2. Josh: Working with property owners to create a new subdivision housing
development. Seeing 4 units per acre, 3.7. Lower density single family
around edges, middle sections 5 units / acre townhomes, Meadows and
Utah Lake, new more affordable housing. Open space #1 cannot have
anything in line with that drainage system. Affordable housing push limit
for yard, young families, 1600 1150 s SW corner, ¼ acre, 10000 sf or more.
Townhome concept stretch it out for own fenced backyard. Dog park. Big
attractor. Not much more affordable than single family homes. Squeeze
down lots. West side has a lot of starter homes, title 1 rate on SW side is
very high, 60-80%. We have all these starter homes, need something
people can grow into after 3rd child can stay, move up and stay on west
side and not have to move away. Adding problems on top of problems.
Agree with Becky, moved to east side to west side, not a lot to choose
from. Larger lot. Stability of neighborhoods. Prefer larger single-family
homes .25 to ⅓ acre. Good for west side. Instead of townhomes, single
homes with smaller yards, gotten a lot of cookie cutter homes, different
diversity, helping families that own this grown, push this through
entitlement process, end up with Ivory, DR Horton, builder will, pros and
cons too consistent, some consistency, most talking to are great home
builders. Arrive, DR Horton, Ivory, will not be a custom home choose your
builder.
3. Election of Chair and Vice Chairs (7:00-7:15 PM) – Rachel Breen
A. Board members introduce themselves. Former neighborhood chairs, application, city
hall for input, only board members may run for office.
1. Matt Peterson: Decline, will consider it. Attended from Zoom. Lived in
Provo most of adult life. Build first home 30 years ago, 2nd home 5 years
ago.
2. Haley Glenn: 8 years, interested in parks, Willing to be a chair or vice
chair.
3. Andrew Terry: 2 years in Provo, Vineyard, grew up in Orem, Qualtrics,
4. Brian Taylor: Cannot be re-elected as chair, cross Brian off.
5. Shaun Hilton: Moved to Provo a year ago, involved with program since
moving into neighborhood, civil engineer, asst city engineer, serving as
vice chair, not petitioning one way or another. Happy to serve.
6. Brooke Barnes: Lived here a long time, not far from sunset view, lived here
for 16 years. Love Provo, want to get involved. With Arien, like the new set
up every 6 weeks, go back to neighborhoods, get more people involved.
Working on matching grant. Arien, Hailey, Andrew, Shaun and Brooke.
Vote for 3.
B. Pass out ballots.
C. Vote for three (most votes=Chair, second & third most votes=Vice Chairs)
D. Turn in ballots.
4. Service Project (7:15-7:30 PM) – Brooke Barnes
A. Goat head removal project with Provo School District on April 20th to coincide
with Earth Day.
1. Field south of Sunset. Area full of goat heads. Gone, city spray, asphalt
path. BYU volunteers. April 20. 9 or 10 am. Get service hours.
2. Considered having a follow up day?
B. Reach out to volunteers (BYU YSA ward, YServe Community Cleanup, BikeWalk
Provo, etc.).
5. Announcement of Chair and Vice Chairs (7:30 PM) – Rachel Breen
1. Chair: Brooke Barnes
2. Vice Chair: Arien Adams
3. Vice Chair: Shaun Hilton
6. Election of Secretary (7:30-7:40 PM) – Rachel Breen
1. Andrew Terry: Sunset
7. Public Comment (7:40-7:45 PM)
8. Announcement of Secretary (7:45 PM) – Rachel Breen
9. Adjournment (7:45 PM)
Agenda
Neighborhood District 3 Meeting Agenda
Lakeview North, Lakeview South, Fort Utah, Provo Bay, Sunset, and
Lakewood Neighborhoods
Wednesday, February 21, 2024; 6:00 PM
Provo City Hall Community Room 445 W Center St
Direct Zoom link: https://us02web.zoom.us/j/85855505004?pwd=aUdhN1lYenc1VGV6WHdqYmk0VjFJUT09
Through Zoom website: https://zoom.us enter Meeting ID 858 5550 5004, passcode 330412.
Zoom by phone: dial 346-248-7799, enter Meeting ID 858 5550 5004, press #, when asked for participant ID,
press #; press *9 if you would like to speak.
1. Department Topics (6:00-6:30 PM)
A. 2050 West Speed Study (Traffic Manager Vern Keeslar).
B. Updates on Delta Gateway Park, West Park, Fort Utah Park & Greenway, Sports Park
(Parks Projects Manager John Bunderson).
2. Planning Items (6:30-7:00 PM)
A. Dudley & Associates requests a Zone Map Amendment from the A1.5 Agricultural Zone
to the R1.8 One-Family Residential Zone to create a 3-lot single-family subdivision at 1342 N
Geneva Rd in the Lakeview North Neighborhood. Nancy Robison 801-852-6417
nrobison@provo.org PLRZ20240018.
B. Colliers’ Dan Ford and Liz Raff proposed project.
3. Election of Chair and Vice Chairs (7:00-7:15 PM) – Rachel Breen
A. Board members introduce themselves.
B. Pass out ballots.
C. Vote for three (most votes=Chair, second & third most votes=Vice Chairs)
D. Turn in ballots.
4. Service Project (7:15-7:30 PM) – Brooke Barnes
A. Goat head removal project with Provo School District on April 20th to coincide with
Earth Day.
B. Reach out to volunteers (BYU YSA ward, YServe Community Cleanup, BikeWalk Provo,
etc.).
5. Announcement of Chair and Vice Chairs (7:30 PM) – Rachel Breen
6. Election of Secretary (7:30-7:40 PM) – Rachel Breen
A. Board members introduce themselves.
B. Pass out ballots.
C. Vote for one (most votes=Secretary)
D. Turn in ballots.
7. Public Comment (7:40-7:45 PM)
8. Announcement of Secretary (7:45 PM) – Rachel Breen
9. Adjournment (7:45 PM)
Next Neighborhood District 3 Meeting: Wednesday, May 15, 2024, 6:00 PM, City Hall Community Room.
Get email alerts for Provo
A daily email when new agendas and minutes are posted.