City Council Worksession
Regular MeetingSouth St. Paul, MN · April 27, 2020
Agenda
South St. Paul
JOINT WORKSESSION COUNCIL
Monday, April 27, 2020
7:00 pm
Please be advised that the regular meeting location is City Hall Training Room
located at 125 3rd Ave. N., South St. Paul, but pursuant to Minn. Stat. 13D.021,
under the current emergency declaration due to the COVID-19 health pandemic,
some or all of the council members may participate in remote locations using
WebEx. Please be advised that City Hall is closed to the public, therefore, any
member of the public wishing to monitor the meeting may do so electronically by
logging in as follows:
WebEx Meeting
For the Public
Join by phone: 1-312-535-8110
Access Code: 803 361 065
AGENDA:
1. 380 Airport Road Lease
2. 1019 Concord Street North
3. Update on Odor Issues and Discussion of Proposed Revision to Odor Ordinance
4. Siedl’s Lake Lift Station Update
5. Council Comments/Questions
A COUNCIL WORKSESSION REPORT
DATE: APRIL 27, 2020 1
DEPARTMENT: ECONOMIC & COMMUNITY DEVELOPMENT
Prepared by: Ryan Garcia, Director of Economic & Community Development
ADMINISTRATOR: JRH
AGENDA ITEM: 380 Airport Road Lease
DESIRED MEETING OUTCOMES:
• Advise Council of delinquent rent payment by BRS
• Discuss BRS’ current challenges related to COVID-19 and steps the company is taking
• Discuss potential City remedies/responses to delinquency
OVERVIEW:
Ballistic Recovery Systems, Inc. (BRS) is a manufacturer located at the northeast corner of the
South St. Paul Airport, occupying all of a roughly 20,000 square foot industrial building at 380
Airport Road. The South St. Paul HRA financed approximately $1.8 million for the construction
of the building through tax-exempt airport revenue bonds in 2007, and owned the building from
that time until 2017, when the City Council approved transferring ownership from the HRA to
the City of South St. Paul (by paying off the original debt through a new City bond issue). In any
event, BRS has occupied the building since 2007 as its sole tenant.
The company has experienced periods of financial instability over the course of its tenancy and
the City has accommodated the company in down times through a series of lease amendments
intended to temporarily lower BRS’ monthly rent payment and “weather the storm”. In 2018, the
City and BRS renegotiated the lease such that BRS’ lease payment (currently $11,193 monthly)
essentially covers the City’s debt obligation related to (and over the term of) the bond issue.
In a late-March email from BRS’ CEO, Fernando DeCaralt, staff was notified that BRS is
experiencing financial difficulty related to the COVID-19 pandemic (evidently, orders have been
suspended indefinitely) and may not be able to meet its monthly lease obligation for the
foreseeable future. They have asked for the City to consider a 6-month deferral of their monthly
lease payment. If instituted, a 6-month deferral would amount to a total of $66,965 in lost (or at
least, deferred) lease revenue at the building.
Staff responded to BRS that additional information would be needed to formally respond to this
request. Specifically, we advised BRS of the Paycheck Protection Program (PPP), which is a
SBA-backed credit facility that can be used to help cover small business’ payroll, utilities, and
real estate costs. In addition, we advised BRS of the SBA’s Economic Injury Disaster Loan
(EIDL) program – a SBA facility that companies can utilize for working capital needs in times of
economic crisis and disasters. We advised that these programs may provide relief and we’d want
to see that the company was working to find financing through these programs rather than simply
opting to not meet its lease obligations. Nonetheless, BRS stopped payment on its April 1 ACH
for rent, and we anticipate that they will do the same on May 1.
City Council Worksession Report – 380 Airport Road Lease
April 27, 2020
Page 2 of 2
As of this writing, BRS has advised that an application for the PPP has been submitted and that
they are awaiting formal approval and terms. While this is positive news, at this point, it
provides no clarity as to whether, or when, BRS will resume paying rent.
Staff acknowledges that the COVID-19 pandemic is introducing unprecedented strains across the
economy and at every scale. Nonetheless, it would be irresponsible – particularly with this tenant
– to shortcut the process of evaluating rent deferral as a responsible and reasonable solution to
BRS’ current challenges (and for how long). At this point, our options are relatively straight-
forward: either agree to a deferral and repayment of deferred rent at this time, or pursue remedies
found in the lease and Minnesota statute for failure to pay rent.
If the Council is willing to consider a deferral of rent due, Staff would recommend that we
amend the existing lease to allow for a deferral period of no more than 6 months. Further, staff
would suggest that any deferred rent would be repaid either in a “lump sum” at any time between
the date of amendment and 12/31/2020, or through an amortized repayment plan (with interest)
beginning 1/1/2021 (we would suggest a maximum 24-month term). Staff would request that the
Council grant us the latitude to negotiate the amount to be deferred each month. While the
tenant is requesting full deferral, we would suggest that even partial payment - ¼, ½, whatever –
would seem to be possible (and increase the likelihood of recovering deferred rent down the
line). While this approach might introduce short-term strains on the City’s ability to pay its debt
obligation related to the building, it would increase the business’ chances of retaining employees
and remaining in operation for enough time to receive any SBA lending and hopefully re-
establish its contract base.
Alternatively, if the Council feels that this request represents something of a “last straw” with
this tenant (who has a history of lease deferral or altogether nonpayment); our option would be to
abide by the Lease Agreement’s default process. This would involve notifying the tenant of
default, providing them with 30 days to cure (pay the rent due and past due), and – if they do not
cure – proceeding with the eviction process. It probably goes without saying, but eviction of this
tenant would result in the City assuming all costs related to managing and maintaining the
property. In addition, the City would likely want to try to market the property for sale (only the
building can be sold, the land beneath it cannot) or lease. As a reminder, any occupant of the
building would need to be “aviation-related”.
Recommendation
Staff recommends formally informing the tenant of its condition of default for failure to pay rent,
but subsequently offering to amend the lease payment schedule to allow to defer collection of
rent due between April 1, 2020 and September 30, 2020. We’d suggest that collection of the
deferred rent be amortized (including interest) over a 24-month period beginning January 1,
2021. We feel it is important to have record of formally informing the tenant of a condition of
default, even if further enforcement action is not pursued at this time.
A COUNCIL WORKSESSION REPORT
DATE: APRIL 27, 2020 2
DEPARTMENT: ECONOMIC & COMMUNITY DEVELOPMENT
Prepared by: Ryan Garcia, Director of Economic & Community Development
ADMINISTRATOR: JRH
AGENDA ITEM: 1019 Concord Street North
DESIRED MEETING OUTCOMES:
• Explore Council’s interest in acquisition of property at 1019 Concord Street North
OVERVIEW:
As the Council will recall, staff has had ongoing dialogue with Erick Schmidt, owner of South
Park Corporation (1019 Concord Street North), as he looks for a new facility for South Park.
South Park is entering a period of growth and have determined that the facility on North Concord
is not a sustainable solution for the efficient and effective operation of their business. While Mr.
Schmidt was initially interested in pursuing new construction at the vacant EDA-owned property
at 285 Hardman Avenue, he has at this point determined that he and his company would be better
suited by purchasing the existing privately owned industrial facility at 205 Hardman Avenue
South (former Holtkoetter building).
As the Council will recall, Mr. Schmidt previously sought to pursue acquisition of the EDA-
owned property through a “swap” arrangement that would have seen the EDA acquire his
property at 1019 Concord Street North along with the parking lot he owns at the corner of
Concord Street and Bryant Avenue. While he is no longer interested in acquiring the EDA
property, Mr. Schmidt has inquired as to whether the EDA is interested in acquisition of his real
estate interests on North Concord Street through negotiated purchase. Mr. Schmidt has
established that he’d sell the property for the Appraised Value of $510,000. (The County’s
estimated market value for this property totals $455,000.)
The property proposed for acquisition consists of four distinct tax parcels that are non-
contiguous. Two of the parcels (totaling about 9,900 square feet) are improved with the South
Park shop and office building, and two of the parcels (totaling about 6,600 square feet) are
improved with a paved surface parking lot. These two pairs of parcels lie on either side of the
“1009 Hall” building and property (at 1009 Concord, owned by a separate private party).
The existing building, built in the 1940s, measures at about 8,300 square feet total and is in fair
condition. The building likely has limited utility to the City/EDA, but would likely have utility
to a similar business (machine shop/general industrial), or general commercial users such as
tradespersons, construction contractors and the like. It should be noted that given its current
zoning designation of North Concord Mixed-Use, the property could not be used for industrial
purposes outside the bounds of its existing “legally non-conforming” status (i.e., it could be
reused as-is, but not modified or expanded).
City Council Worksession Report – 1019 Concord Street North
April 22, 2020
Page 2 of 4
The existing parking lot is utilized by South Park’s employees and is also leased to Bugg’s Bar
(925 Concord Street North) for overflow parking. As the Council is aware, the owner of Bugg’s
Bar has expressed concern about the loss of parking associated with the Concord Street
reconstruction, and has anecdotally stated that the existing leased parking lot is substandard.
Conceivably, if the EDA were to acquire this site we could relieve at least some of the concerns
about parking loss in this immediate area, at least in the near term.
As the attached map illustrates, the EDA owns quite a few properties in the vicinity of Bryant
Avenue and Concord Street. This district, given its positioning at the entry point to Kaposia
Landing, is undoubtedly an important land use node within the City that the HRA/EDA/City
have sought to improve over time (thus the significant land acquisition efforts in the past). As
such, Staff suggests that if acquisition of 1019 Concord is pursued, it should be understood as a
complement to these assembly efforts and viewed as a component of a relatively long-term
redevelopment effort for the Concord/Bryant node.
This corner of the City is in the early stages of transition and is still waiting to find its foothold
and identity. The former Cenex campus is an enormous and symbolic presence on the corridor,
and has been listed for sale for more than 15 months. Prospects for that site are generally not
congruent with the City’s mixed-use vision espoused in the comp plan nor with current mixed-
use zoning. Other sites along the corridor lack synergy with one another and generally fail to
capitalize on the proximity to the park or river. In short, while one could squint hard and dream
big to see this site becoming a component part of a vibrant district, there is A LOT of heavy
lifting to do in the surrounding area. The 1019 site is a relatively small piece of the puzzle –
acquisition now won’t significantly move the needle in the short-term.
Because opportunity only knocks every so often, Staff suggests that we should think critically
about whether and how 1019 Concord fits into our development visions strategically. The
critical questions before us as they relate to acquisition of 1019 Concord are:
- Is the existing use and condition of the site supportive of the City’s best interests for the
site and district?
- Are surrounding uses and property conditions supportive of the City’s best interests for
the site and district?
- Is redevelopment of this site and surrounding sites likely to occur by private market
forces? If so, on what timeline? Are we content with that timeline?
- Is the City motivated to overpay for site assembly, to advance a different vision for the
district?
- Can this site and immediately surrounding sites catalyze additional development in the
district?
Obviously, none of these questions has definitive, absolute answers. They are really gut-check
questions for us to ask as we consider this opportunity. There is absolutely plenty of upside to
acquiring this site: potential to address short-term parking concerns in the district and potential to
extend site control for future development most specifically. However, strategically the EDA’s
City Council Worksession Report – 1019 Concord Street North
April 22, 2020
Page 3 of 4
efforts have (for better or worse) been focused at Concord/Grand in recent years. We have to
acknowledge that there is only so much capacity in the market for mixed-use development in
SSP, and especially in the near-term the market will be very cautious about pursuing mixed-use
opportunities in our community. Acquiring 1019 – unless we shift priorities away from
Concord/Grand and to the north (Concord/Bryant) – will most likely be a very long-term gamble,
and one that carries at least some risk that it will not pay off as envisioned for a very long time.
FUNDING SOURCES AND OTHER FISCAL CONSIDERATIONS:
If the EDA were interested in pursuing acquisition of the properties currently controlled by South
Park, the EDA has various unrestricted development funds that may be sourced for some or all of
the acquisition, with the balance likely needing to come from the Concord Street TIF District
fund balance.
ATTACHMENTS:
Orientation Map
City Council Worksession Report – 1019 Concord Street North
April 22, 2020
Page 4 of 4
A CITY COUNCIL WORKSESSION REPORT
DATE: APRIL 27, 2020 3
DEPARTMENT: Community Development-Planning
Prepared By: Michael Healy, City Planner/Zoning Administrator
ADMINISTRATOR: JRH
AGENDA ITEM: Update on Odor Issues and Discussion of Proposed Revision to Odor Ordinance
DESIRED OUTCOMES:
• Discuss status of odor issues in the community
• Discuss proposed revision to the odor ordinance
• Discuss potential for collaboration with MPCA
• Get Council feedback on Staff’s proposed strategies.
OVERVIEW:
As a result of the shelter-in-place order, South St. Paul residents are spending a significant
amount of time outdoors in the community. This has led to a major uptick in the number of odor
complaints that are being submitted to the City. As is our current policy:
• These complaints are immediately forwarded to the businesses that are believed to be
responsible for the odors. The hope is that they will take steps to address the issues.
• The City’s odor consultants, SEH, receive an email notification when each complaint is
submitted. If the complaint is received during business hours, they send a team member
out to the site of the complaint to take readings and determine whether any odors are
being generated that exceed “7 Odor Units” using their measurement tool. Per our
Ordinance, any odors that exceed that “7 Odor Units” are considered a “verified odor
complaint.” If less than 7 units are detected, the complaint is considered unverified.
• SEH submits a report to City Staff regarding how many odor units were detected during
each incident and these are kept for our records.
Brief Summary of Past Efforts
The City adopted an odor ordinance in 2014. The ordinance established the methodology for
measuring odors and established that “7 Odor Units” is the threshold at which an odor is
officially considered unacceptable. The ordinance also established a process for dealing with
businesses that routinely exceed 7 odor units with their output.
Under the 2014 odor ordinance, a business that has more than seven (7) verified odor complaints
in any 6-month period is labelled “a significant odor generator.” Businesses that have received
this designation are required to sit down with the City Engineer and develop an odor mitigation
plan (the Code states ‘City Engineer’ even though it looks like the City Planner has traditionally
been the lead staffer handling the odor ordinance). The business is then supposed to work
collaboratively with the City to implement the agreed-upon odor mitigation plan. The existing
City Council Worksession Report – Update on Odor Issues
April 27, 2020
Page 2 of 8
ordinance is quite generous about giving businesses ample time to reach compliance and states
that even a non-compliant business that does not keep to its odor mitigation plan is still given a
12-month grace period after they are declared “non-compliant” before any administrative
citations are issued.
In addition to the odor ordinance, the City also has a longstanding policy of requiring odor-
generating businesses to commit to odor mitigation as a condition of City approvals whenever
they plan an expansion. Some businesses have taken these odor mitigation requirements more
seriously than others. The City has tightened the process for monitoring these mitigation
improvements in recent years after issues with noncompliance.
Does the Existing Ordinance Work?
The existing ordinance does appear to have achieved some early positive results by creating a
framework for the City to work with businesses that were interested in collaborating on odor
mitigation. Several odor-generating businesses have made a good faith effort to work with the
City and decrease their odors.
As previously stated, the existing ordinance is extremely generous and does not have very good
“teeth” when it comes to dealing with any odor-generating businesses that are not willing to take
a collaborative approach and work with the City. Unfortunately, not all of the odor-generating
businesses in South St. Paul have been willing to make a good faith effort and collaborate.
Staff and the City Attorney believe that the odor ordinance, in its current state, is not an effective
tool to deal with South St. Paul’s remaining odor issues. Residents have become increasingly
frustrated with the status quo and Staff has heard many requests that the City “try something
new” to attempt to make progress on this issue. Unfortunately, there does not appear to be any
‘silver bullet solution’ that can address the problem overnight. Staff has worked with the City
Attorney and the odor consultants at SEH to come up with a two-pronged path forward that
could potentially achieve some results.
Prong #1: Proposed Revision to the Odor Ordinance
Former City Planner Peter Hellegers and City Attorney Peter Mikhail worked on a revision to the
odor ordinance in 2019 after receiving some preliminary direction from City Council. The
revised ordinance was temporarily “lost in the shuffle” due to Mr. Hellegers’s departure but Staff
became aware of its existence in early April and believes that it should still be implemented.
The proposed ordinance (which is still in draft form and needs additional refinement) would:
• Amend the Code to empower the City to start issuing administrative citations to a
“significant odor generator” immediately for any violations that occur after the
significant odor generator designation has been earned. Remember, it takes seven (7)
violations within a 6-month period before the “significant odor generator” label is
applied. The designation is maintained until the business manages to go twelve (12)
months without a verified odor complaint.
City Council Worksession Report – Update on Odor Issues
April 27, 2020
Page 3 of 8
• Clean up some language in the ordinance and add the City Administrator to the list of
City personnel who can issue administrative fines.
• The City will still have the ability to use the “friendly” odor mitigation plan approach
with any business that makes a good-faith effort to collaborate with the City. This new
more punitive approach would only be used for businesses that decline to work with the
City.
The goal of the proposed revision is to hold significant odor generators financially responsible
for their negative impact on quality of life in the community and provide a strong incentive for
businesses to mitigate their odors to avoid additional fines. The City’s administrative citations
start at $200 and double for each subsequent citation before maxing out at $2,000 per violation.
Per SEH, one of the businesses that generates significant odors in South St. Paul had seventeen
(17) days between April 4, 2019 and September 11, 2019 where they generated foul odors in
excess of “7 odor units.” If the new ordinance would have been in place, they would have been
labeled a “significant odor generator” after the first 7 violations and then issued ten (10)
administrative citations which would have totaled $15,000 in fines.
Staff would note that the City takes on a significant expense each year in retaining the services of
SEH to conduct odor monitoring. This expense is currently borne by the City’s taxpayers. By
moving forward with issuing administrative citations, the City would shift some of that financial
responsibility onto the offending businesses which is arguably where it belongs. If a business
declines to pay down their citations, the fines will be added to their property taxes as an
assessment.
Prong #2: Discussions with the MPCA Regarding Possible Collaboration
Staff and SEH have been in contact with the Minnesota Pollution Control Agency (MPCA) to
inquire about whether there is any possibility of partnering with that agency in support of the
City’s odor mitigation efforts. What Staff has learned is:
• The MPCA only regulates one (1) specific noxious odor. If a business is generating an
excessive amount of Hydrogen Sulfide (H2S), the MPCA will get involved. All other
noxious odors are considered a local issue and the MPCA will not get involved.
• The MPCA may get involved if a business is expelling pollutants that could cause a
health risk to residents. This has nothing to do with the odor of the pollutants, however, it
solely pertains to the negative health effects of specific pollutants. The MPCA generally
does not take odor into account when making determinations regarding health risks.
SEH believes that there is a possibility that at least one of the City’s significant odor generators
is generating Hydrogen Sulfide in excess of the levels that are permitted by the State. It requires
special equipment to test for Hydrogen Sulfide, equipment that SEH does not own but is able to
rent. They rented this equipment in 2019 in an attempt to document a violation but were
unsuccessful. Per SEH, the weather conditions were not favorable during the monitoring period
in 2019 and that may have been the reason why a violation could not be documented.
City Council Worksession Report – Update on Odor Issues
April 27, 2020
Page 4 of 8
SEH is proposing to rent the Hydrogen Sulfide monitoring equipment again to attempt to
document a violation. If they are able to do so, this could be used to bring the MPCA in for a
collaborative enforcement/mitigation effort. Staff and SEH will both continue to work the
MPCA in regards to monitoring for any potential negative health effects relating to air pollution
generated by the significant odor generators. Air pollution is handled by a different division of
the MPCA than their Hydrogen Sulfide Odor Monitoring division so Staff will need to set up
additional conference calls to collect more information.
GOAL OF THIS WORKSESSION DISCUSSION
Staff’s primary goal in leading this discussion is to update the City Council regarding odor
mitigation efforts in light of the recent uptick in complaints. Staff is also looking for feedback
regarding whether the City Council is comfortable with Staff’s proposed two-pronged approach:
1. Moving forward with the proposed odor ordinance revision (understanding that it is still in
draft format and may need additional refinement)
2. Staff and SEH will continue discussions with the MPCA regarding possible collaboration.
SOURCE OF FUNDS: N/A
ATTACHMENTS
A- DRAFT ODOR ORDINANCE AMENDMENT
ATTACHMENT A
DRAFT ODOR ORDINANCE AMENDMENT
City of South St. Paul
Dakota County, Minnesota
Ordinance No. ________
AN ORDINANCE AMENDING SOUTH ST. PAUL CITY CODE
SECTION 38-104 REGARDING AUTHORITY TO ISSUE COMPLIANCE LETTERS
AND ADMINISTRATIVE CITATIONS, SECTION 38-105(d) REGARDING
COMPLIANCE LETTERS, SECTION 110-144 REGARDING DESIGNATION AS A
SIGNIFICANT ODOR GENERATOR, SECTION 110-146 REGARDING ODOR
MANAGEMENT PLAN, SECTION 110-148 REGARDING NON-COMPLIANCE
AND SECTION 110-150 REGARDING PENALTIES
The City Council of the City of South St. Paul does ordain:
SECTION 1. AMENDMENT. South St. Paul City Code Section 38-104 is hereby amended as
follows:
Sec. 38-104. – Authority to issue compliance letters and administrative citations.
The following city employees and agents are authorized to issue compliance letters and
administrative citations for violations of the City Code:
(1) Licensed peace officers, police reserves, and community service officers of the South St.
Paul Police Department.
(2) Code enforcement officer;
(3) Animal control officer;
(4) City planner;
(5) Building official;
(6) City engineer;
(7) City Clerk;
(8) Fire chief; fire marshal, or fire inspector of the South Metro Fire Department;
(9) City Administrator.
SECTION 2. AMENDMENT. South St. Paul City Code Section 38-105(d) is hereby amended
as follows:
Sec. 38-105. – Compliance letter.
(d) Exceptions to issuance of a compliance letter. For violations of any of the following
sections, the city shall not be required to issue a compliance letter and may proceed
directly to issuance of an administrative citation as provided in section 38-91.
(1) Repeat offender. If the same owner commits a subsequent violation within 12
months after a compliance letter has been issued for a same or similar offense,
no compliance letter shall be required for the new violation.
City Council Worksession Report – Update on Odor Issues
April 27, 2020
Page 6 of 8
(2) License violations. For any license violation, including not having a license, no
compliance letter shall be required.
(3) Traffic or parking violations. For traffic or parking violations issued under
chapter 58, no compliance letter shall be required.
(4) Animal violations. For any violation of city code section 15-35 (Running at
large) or city code chapter 15, article V. (Dangerous Dogs), no compliance letter
shall be required.
(5) Noise violations. For any violation of city code chapter 38, article III (making
unnecessary noise), no compliance letter shall be required.
(6) Obstruction of fire hydrants or fire lanes. For violations of city code subsection
54-1(c) (Obstructing of fire hydrants), or city code section 30-41 (Fire
Prevention Code), no compliance letter shall be required.
(7) Water sprinkling violations. For violations of City Code section 62-28 (water
sprinkling ban), no compliance letter shall be required.
(8) Odor violations. For violations of City Code section 110-142 (odor pollution)
committed by a significant odor generator so designated under section 110-144,
no compliance letter shall be required.
SECTION 3. AMENDMENT. South St. Paul City Code Section 110-144 is hereby amended as
follows:
Sec. 110-144. – Designation as a significant odor generator.
After reviewing the results of odor testing, if the property produces odor emissions that
generate seven verifiable odor complaints in a six-month period, the city engineer or city
administrator may determine that a property shall be designated as a significant odor generator
and shall notify the property owner of the designation.
SECTION 4. AMENDMENT. South St. Paul City Code Section 110-146 is hereby amended as
follows:
Sec. 110-146. – Odor management plan.
If the property is designated as a significant odor generator, then within 90 days of notice
of designation by the city engineer or city administrator, the property owner shall work with the
city engineer or city administrator to develop an odor management plan using the best practicable
odor control technology in order to mitigate and comply with this ordinance. The city engineer
or city administrator may grant an extension for up to an additional 90 days to submit the odor
management plan, upon sufficient evidence and cause for such extension. The odor management
plan shall:
City Council Worksession Report – Update on Odor Issues
April 27, 2020
Page 7 of 8
(1) Identify and explain the odor source(s);
(2) Describe the best practicable odor control technology to manage the odors
generated;
(3) Provide a detailed plan on any proposed operational changes to the existing odor
control equipment in order to control and mitigate the odors being generated;
(4) Establish a timeline for development and implementation of an engineer-approved
treatment technology, which includes monitoring instrumentation and equipment to
ensure future compliance.
(5) Be kept on file with the city engineer or city administrator.
SECTION 5. AMENDMENT. South St. Paul City Code Section 110-148 is hereby amended as
follows:
Sec. 110-148. – Non-compliance.
If the city engineer or city administrator determines after follow-up testing that the results at
the property have not improved, or if odor complaints continue, the property owner shall be
required to meet with the city engineer or city administrator on at least a quarterly basis to
develop a new odor management plan. Such meetings and follow-up testing shall continue until
the city engineer or city administrator determines that the results at the property have improved.
If non-compliance continues for a period of 12 months, the city may impose penalties pursuant
to section 110-150.
SECTION 6. AMENDMENT. South St. Paul City Code Section 110-150 is hereby amended as
follows:
Sec. 110-150. – Penalty.
Failure to comply with the requirements in sections 110-143, 110-146, 110-147, 110-148 or
failure to meet the obligations contained in the odor management plan, unless the failures are
determined by the city engineer or city administrator to be beyond the control of the significant
odor generator or the result of an accident or unexpected and unforeseen events, shall result in an
administrative citation pursuant to sections 38-102—38-110. In addition, any follow-up testing
required due to compliance failure shall be paid for by the property owner. Sections 110-144 to
110-150 are intended to foster compliance with the city code and are in addition to any other legal
or equitable remedy available to the city for city code violations. Nothing in the sections 110-144
to 110-150 relieves a significant odor generator of its continuing obligation to comply with the
city code. More specifically, nothing in sections 110-144 to 110-150 limits the city’s power to
issue administrative citations, initiate criminal charges, or pursue other legal or equitable remedies
available to the city for any violation of section 110-142
City Council Worksession Report – Update on Odor Issues
April 27, 2020
Page 8 of 8
SECTION 7. SUMMARY PUBLICATION. Pursuant to Minnesota Statutes Section 412.191, in
the case of a lengthy ordinance, a summary may be published. While a copy of the entire ordinance
is available without cost at the office of the City Clerk, the following summary is approved by the
City Council and shall be published in lieu of publishing the entire ordinance:
These amendments allow the city to immediately issue administrative citations to
significant odor generators for additional violations of the odor pollution code without
having to issue compliance letters.
SECTION 8. EFFECTIVE DATE. This ordinance shall become effective upon publication.
Approved: _________________________
Published: _________________________
_____________________________________
Christy Wilcox, City Clerk
A COUNCIL WORKSESSION REPORT
DATE: APRIL 27, 2020 4
DEPARTMENT: ENGINEERING
Prepared by: Lee Elfering, Project Engineer
ADMINISTRATOR: JRH
AGENDA ITEM: SEIDL’S LAKE LIFT STATION/4TH STREET SOUTH UPDATE
ACTION TO BE CONSIDERED:
Information only: for input and discussion
OVERVIEW:
As the Council is aware the Seidl’s Lake Lift Station project is a joint project with Inver Grove
Heights, and West St. Paul to install an outlet for Seidl’s Lake. Funding was sought from the
legislature in 2018 for $781,000 to fund what at that time was estimated as close to the project
cost. As design progressed the overall cost was determined to be significantly more than the grant
dollars received and the required additional funds were to be divided among the partner
communities based on a cost sharing formula developed by the Lower Mississippi River
Watershed Management Organization. The reconstruction of 4th Street was added to the project
to capitalize on cost savings for the forcemain installation that could be captured to help pay for
the street reconstruction while address all the needs along the roadway including pavement
condition, watermain replacement, and sanitary repairs.
Bids were received for the above mentioned projects on April 16th, 2020. Two bids were received
for the Seidl’s Lake Lift Station and four bids were received for the 4th Street Reconstruction
project. A summary of the bids along with the Engineer’s estimate based on the final plans is
shown below.
SEIDL’S LAKE LIFT STATION 4TH STREET RECONSTRUCTION
Contractor: Bid: Contractor: Bid:
Minger Construction Veit & Company, Inc. $1,343,848.42
$1,652,607.00
Company, Inc. Northdale Construction
$1,353,092.82
PCI Roads, LLC. $2,563,098.75 Company
* Engineer’s Estimate $1,430,915.00 McNamara Contracting $1,474,413.20
Geislinger & Sons $1,493,459.28
* Engineer’s Estimate $1,456,241.04
The original Joint Powers Agreement did lay out potential methodologies for the sharing of the
project costs that were not funded by grant dollars, but did not provide a definitive percentage split.
Based on the calculation of the percentages by the Watershed District, it has been determined that
South St. Paul is responsible for approximately 61% of the lift station and forcemain costs. This
is a larger percentage than was originally anticipated and additional dollars would need to be
allocated to the project to cover the City’s share of the cost.
While the low bid for the lift station appears to be competitive, it is over the Engineer’s estimate
and only two bids were received. The City’s percentage of the lift station costs is also higher than
originally budgeted and additional funds would need to be reallocated to cover the project costs.
In discussing the bids with the other cities, Inver Grove Heights also had shortfalls in budgeted
dollars for the project. We also discussed rejecting the bids to provide additional time to seek
other funding sources.
RECOMMENDATION:
Given the current economic uncertainty and the lack of currently budgeted funds, we would
recommend that the City Council reject all bids for the Seidl’s Lake Lift Station and 4th Street
Reconstruction projects at the May 4th Council Meeting. The current grant agreement for the
$781,000 does not expire until December of 2021 and we would recommend that staff investigate
other grants and funding sources to decrease the amount of City contribution needed for the
projects over the next several months.