Public Works Committee (Ceased May 2022)
Regular MeetingSpearfish, SD · September 15, 2020
Minutes
City of Spearfish
Public Works Committee Minutes
September 15, 2020 4:15 p.m.
The Public Works Committee met at 4:15 p.m. in the Council Chambers of City Hall on Tuesday,
September 15, 2020 with the following members present: Clark, Herrmann and Hodgs. Absent:
None. Also present were: City Administrator Harmon, City Attorney McDonald, Public Works
Director Lee, City Engineer Mathis, City Planner Watson, Parks and Recreation Director Ehnes,
Human Resource Director Mathis, and Finance Officer DeNeui.
Engineering
Final Project – Committee recommended to full council to approve the final Under/Over Change
Order #2 for the Pickle Ball Court Project 1 for a net increase of $12,864.02 (increase of $15,042.02
and a decrease of $2,178.00); final project cost totaled $72,613.64 with the original contract amount
of $54,397.52. Committee additionally recommended to full council to authorize Mayor Boke sign
the Certificate of Final Completion and Acceptance setting September 21, 2020 as the date the two
(2) year warranty begins.
Easement – Committee recommended to full council to authorize Mayor Boke to sign an easement
agreement for a proposed 5-foot sidewalk along Hillsview Road as part of the Exit 8 Area
Community Path Project.
Agreement – Committee recommended to full council to authorize Mayor Boke to sign a driveway
agreement for 511 W. Jackson Blvd.
Human Resources
Add – Committee recommended to full council, consent agenda, to add Kordel Chmela, Jacob
Powell, Bridger Janvrin and Brock Pentheny to the Spearfish Recreation & Aquatics Center referees
list for worker’s compensation purposes.
Hire – Committee recommended to full council, consent agenda, to hire Sidney Forsch as part-time
(not benefit eligible), recreation assistant, grade 7, step 1, $13.13 per hour, effective 9/22/2020.
This is a replacement position.
Public Works
Award – Committee recommended to award the lowest responsive and responsible bid for the 2020
Airport Perimeter Wildlife Exclusion Fence Project bid to Quinn Construction at a total of
$1,279,870.50. Project to be fully funded by Federal Aviation Administration Grant funds.
Award – Committee recommended to award the lowest responsive and responsible bid for the Sky
Ridge Development Infrastructure Project Phase 1 to Zandstra Construction Inc. for a total base bid
of $3,958,843.26. Project is to be funded through Tax Increment Finance District No. 6.
Public Comment – Public comment section was opened at 4:24 p.m. and closed with no
comments received.
No additional discussions were held and the meeting was adjourned at 4:25 p.m.
Agenda
City of Spearfish
Public Works Committee Agenda
September 15, 2020 4:15 p.m.
City Council Chambers, 625 N. 5th Street, Spearfish
1. Engineering
A. Approve the final Under/Over Change Order #2 for the Pickle Ball Court Project 1 for a
net increase of $12,864.02 (increase of $15,042.02 and a decrease of $2,178.00); final project
cost totaled $72,613.64 with the original contract amount of $54,397.52.
1) Authorize Mayor Boke sign the Certificate of Final Completion and Acceptance setting
September 21, 2020 as the date the two (2) year warranty begins.
B. Authorize Mayor Boke to sign an Easement Agreement for a proposed 5-foot sidewalk
along Hillsview Road as part of the Exit 8 Area Community Path Project.
C. Authorize Mayor Boke to sign a Driveway Agreement for 511 W. Jackson Blvd.
2. Human Resources
A. Consent Agenda – Add Kordel Chmela, Jacob Powell, Bridger Janvrin and Brock Pentheny
to the rec center referees list.
B. Consent Agenda – Hire Sidney Forsch as part-time (not benefit eligible), recreation assistant,
grade 7, step 1, $13.13 per hour, effective 9/22/2020.
3. Public Works
A. Award the lowest responsive and responsible bid for the 2020 Airport Perimeter Wildlife
Exclusion Fence Project bid to Quinn Construction at a total of $1,279,870.50.
B. Award the lowest responsive and responsible bid for the Sky Ridge Development
Infrastructure Project Phase 1, with name of contractor and amount to be available at
committee meeting.
4. Public Comment
September 2, 2020
Mr. Dustin Lee
Public Works Director
City of Spearfish
625 N. 5th Street
Spearfish, SD 57783
Re: Construct Perimeter Wildlife Exclusion Fence
AIP 3-46-0065-027-2020
Bid Results
Dear Dustin:
We have reviewed the two bids received, opened, and publicly read on Thursday, July 30, 2020 for the
above referenced project to construct a perimeter wildlife exclusion fence at the Clyde Ice Field / Black
Hills Airport. Each of the bids contained the required bid bonds and noted a Buy American Waiver would
not be required. Enclosed is a Bid Tabulation indicating the responsive bidders and bid amounts, together
with the Consultant’s Opinion of Cost. The bids were reviewed for any mathematical errors and no errors
were noted within the bids.
The responsive low bid received for the perimeter wildlife exclusion fence was from Quinn
Construction, Inc. of Rapid City, South Dakota in the base bid amount of $1,279,870.50. The Consultant’s
Opinion of Cost for the construction was $1,987,000.00. The remaining bid received was from RCS
Construction, Inc. of Rapid City, South Dakota in the amount of $1,571,741.18.
It is our understanding that these construction activities are ultimately planned to be funded through
a Federal Aviation Administration Airport Improvement Program Supplemental grant to be announced
within the coming week as the FAA fiscal year ends on September 30, 2020. The grant activities will be
funded with 100% federal funds with no local or state matching funds. Funding will include your balance
of your annual FAA entitlement funding; FAA discretionary funding and the normal 10% matching funds
will be included in CARES Act monies.
Quinn Construction, Inc. is a Disadvantaged Business Enterprise (DBE) firm certified in South Dakota
and indicated a participation of 91.56 percent within their bidding documents which exceeds the Airport’s
current established DBE Goal for 2020 of 4.24% participation. The Airport will not need to do anything
more to address this FAA provision.
Quinn Construction, Inc. indicated with their bid that that 100 percent of the cost of all the components
on the project and their final assembly has or will occur in the United States which meets the Airport’s
requirements regarding the Federal Aviation Administration’s requirements for the Buy American
Program. The Airport will not need to do anything more to address this FAA provision.
It is the recommendation of KLJ Engineering that the City of Spearfish and Clyde Ice Field / Black Hills
Airport proceed with the awarding of a contract for the construction of the perimeter wildlife exclusion
fence project to Quinn Construction, Inc. in the amount of their total construction bid of $1,279,870.50
contingent upon the issuance of a Federal Aviation Administration grant to fund all of the costs associated
with this project. Based on recent discussion with the FAA DAK-MIN Airports District Office the City should
anticipated that grant to be offered during the first two weeks of September 2020.
Upon the City awarding the contract, we will prepare three (3) original documents of the Notice of
Award which can be executed by the City to be returned to our office for coordination with the Contractor.
If you should have any questions or need additional information regarding this perimeter wildlife
exclusion fence construction project, please feel free to contact our office at your convenience.
Sincerely,
KLJ
Rod Senn, PE
Project Manager
Enclosure(s): 1 – Bid Tabulation
3 – Notice of Award Documents
Project #: 2005-00309
BID TABULATION
Black Hills Airport / Clyde Ice Field
Construct Perimeter Wildlife Exclusion Fence
AIP #3-46-0065-027-2020 KLJ #2005-00309
Engineer's Opinion of Quinn Construction, Inc. RCS Construction, Inc.
Construction Cost Rapid City, SD Rapid City, SD
Item Description Qty. Unit Unit Cost Total Cost Unit Cost Total Cost Unit Cost Total Cost
Total Bid Schedule 1 - General Construction Bid
1 Mobilization 1 L.S. $ 170,316.00 $ 170,316.00 $ 100,000.00 $ 100,000.00 $ 50,270.40 $ 50,270.40
2 Traffic Control 1 L.S. 2,200.00 $ 2,200.00 7,000.00 $ 7,000.00 7,640.12 $ 7,640.12
3 Pavement Removal 169 S.Y. 20.00 $ 3,380.00 14.00 $ 2,366.00 6.72 $ 1,135.68
4 Clearing and Grubbing 2 Acre 20,000.00 $ 44,000.00 3,500.00 $ 7,700.00 9,114.02 $ 20,050.84
5 Excavation 50 C.Y 10.00 $ 500.00 25.00 $ 1,250.00 12.01 $ 600.50
6 Excavation (OnSite Borrow) 258 C.Y 20.00 $ 5,160.00 25.00 $ 6,450.00 12.01 $ 3,098.58
7 Aggregate Base Course SDDOT 260 30 C.Y 45.00 $ 1,350.00 60.00 $ 1,800.00 63.18 $ 1,895.40
8 Gravel Surface Course SDDOT 260 60 C.Y 55.00 $ 3,300.00 80.00 $ 4,800.00 63.18 $ 3,790.80
9 8-inch PCC Pavement 155 S.Y. 110.00 $ 17,050.00 160.00 $ 24,800.00 104.72 $ 16,231.60
Remove and Dispose Existing Barbed Wire
10 37,962 L.F. 1.50 $ 56,943.00 1.50 $ 56,943.00 0.65 $ 24,675.30
Fence
Remove and Dispose Existing Chain-Link
11 374 L.F. 3.00 $ 1,122.00 10.00 $ 3,740.00 9.64 $ 3,605.36
Fence
Remove and Dispose Existing Electrical
12 2 Each 1,000.00 $ 2,000.00 350.00 $ 700.00 212.23 $ 424.46
Sliding Gate
13 18-Inch Reinforced Concrete Pipe, Cl.4 52 Each 90.00 $ 4,680.00 80.00 $ 4,160.00 190.84 $ 9,923.68
14 18-Inch RC End Section, Cl.4 2 L.F. 1,150.00 $ 2,300.00 850.00 $ 1,700.00 1,246.92 $ 2,493.84
15 10-Foot Chain-Link Fence 2,890 L.F. 50.00 $ 144,500.00 48.00 $ 138,720.00 72.26 $ 208,831.40
16 10-Foot Woven Wire Fence 32,520 L.F. 35.00 $ 1,138,200.00 20.00 $ 650,400.00 27.01 $ 878,365.20
17 18-Foot Chain-Link Sliding Vehicle Gate 4 Each 10,000.00 $ 40,000.00 5,500.00 $ 22,000.00 6,238.15 $ 24,952.60
16-Foot Chain-Link Double Swing Vehicle
18 1 Each 7,500.00 $ 7,500.00 1,400.00 $ 1,400.00 3,022.61 $ 3,022.61
Gate
24-Foot Woven Wire Double Swing Vehicle
19 11 Each 5,000.00 $ 55,000.00 1,300.00 $ 14,300.00 1,929.32 $ 21,222.52
Gate
24-Foot Chain-Link Double Swing Vehicle
20 1 Each $ 5,000.00 $ 5,000.00 $ 2,000.00 $ 2,000.00 $ 3,614.27 $ 3,614.27
Gate
5-Foot Chain-Link Single Swing Pedestrian
21 7 Each 1,500.00 $ 10,500.00 400.00 $ 2,800.00 2,012.93 $ 14,090.51
Gate
22 Weed Control Application 35,698 L.F. 0.50 $ 17,849.00 0.25 $ 8,924.50 0.15 $ 5,354.70
10-Foot Steel Chain Box Culvert Fence
23 28 L.F. 200.00 $ 5,600.00 350.00 $ 9,800.00 391.45 $ 10,960.60
Section
24 10-Foot Steel Chain and Rubber Mat Fence 120 L.F. 450.00 $ 54,000.00 400.00 $ 48,000.00 502.53 $ 60,303.60
25 Seeding 16 Acre 2,000.00 $ 32,000.00 1,100.00 $ 17,600.00 1,286.22 $ 20,579.52
26 Mulching 16 Acre 2,500.00 $ 40,000.00 2,750.00 $ 44,000.00 3,215.54 $ 51,448.64
27 Bioroll 500 L.F. 3.50 $ 1,750.00 6.50 $ 3,250.00 3.86 $ 1,930.00
Total Bid Schedule 1 - General Construction Bid $ 1,866,200.00 $ 1,186,603.50 $ 1,450,512.73
BID TABULATION
Black Hills Airport / Clyde Ice Field
Construct Perimeter Wildlife Exclusion Fence
AIP #3-46-0065-027-2020 KLJ #2005-00309
Engineer's Opinion of Quinn Construction, Inc. RCS Construction, Inc.
Construction Cost Rapid City, SD Rapid City, SD
Item Description Qty. Unit Unit Cost Total Cost Unit Cost Total Cost Unit Cost Total Cost
Total Bid Schedule 2 - Electrical Construction
1 Mobilization 1 L.S. $ 11,926.25 $ 11,926.25 $ 4,500.00 $ 4,500.00 $ 4,501.76 $ 4,501.76
No. 6 AWG, CU, Type THWN Cable,
2 280 L.F. 1.75 $ 490.00 $ 1.10 $ 308.00 $ 1.54 $ 431.20
Installed in Trench, Duct Bank or Conduit
No. 6 AWG, Insulated, Stranded Equipment
3 Ground, Installed in Trench, Duct Bank or 140 L.F. 1.50 $ 210.00 $ 1.10 $ 154.00 $ 1.54 $ 215.60
Conduit
No. 8 AWG, CU, Type THWN Cable,
4 270 L.F. 1.50 $ 405.00 $ 1.00 $ 270.00 $ 1.41 $ 380.70
Installed in Trench, Duct Bank or Conduit
No. 8 AWG, Insulated, Stranded Equipment
5 Ground, Installed in Trench, Duct Bank or 135 L.F. 1.25 $ 168.75 $ 1.00 $ 135.00 $ 1.41 $ 190.35
Conduit
6 Non-Encased Electrical Conduit, 2" PVC 20 L.F. 5.00 $ 100.00 $ 15.00 $ 300.00 $ 17.62 $ 352.40
Airport Obtruction Lights with Solar Power
7 10 Each 250.00 $ 2,500.00 $ 1,200.00 $ 12,000.00 $ 3,089.50 $ 30,895.00
System, In Place
8 Junction Box 1 Each 500.00 $ 500.00 $ 1,600.00 $ 1,600.00 $ 1,897.17 $ 1,897.17
9 Slide Gate Operator System 2 L.S. 40,000.00 $ 80,000.00 $ 30,000.00 $ 60,000.00 $ 29,518.67 $ 59,037.34
10 Pipe Bollard 18 Each 250.00 $ 4,500.00 $ 400.00 $ 7,200.00 $ 856.34 $ 15,414.12
11 Overhead Lighting Standards 1 Each $ 20,000.00 $ 20,000.00 $ 6,800.00 $ 6,800.00 $ 7,912.81 $ 7,912.81
Total Bid Schedule 2 - Electrical Construction Bid $ 120,800.00 $ 93,267.00 $ 121,228.45
SUMMARY OF BIDS
Total Bid Schedule 1 - General Construction $ 1,866,200.00 $ 1,186,603.50 $ 1,450,512.73
Total Bid Schedule 2 - Electrical Construction $ 120,800.00 $ 93,267.00 $ 121,228.45
Total Bid Schedule 1 and Schedule 2 $ 1,987,000.00 $ 1,279,870.50 $ 1,571,741.18
Project Manager's Signature
True tabulations of bids received on: July 30, 2020
Number of bids received: 2
Bids rejected: 0
Corrections made due to mathematical errors in calculating costs.
Notice of Award
Date: September 21, 2020
To Quinn Construction, Inc.
Bidder’s Address 4404 Universal Drive – Rapid City, South Dakota 57702-9395
Project Description Construction Perimeter Wildlife Exclusion Fence
Name of Owner City of Spearfish, South Dakota – Clyde Ice Field / Black Hills Airport
Owner’s Address 625 North 5th Street – Spearfish, South Dakota 57783
You are notified that your Bid dated July 30, 2020 for the above Contract has been considered. You are the apparent successful
bidder and have been awarded a contract for:
AIP # AIP 3-46-0065-027--2020
Project Description Construct Perimeter Wildlife Exclusion Fence
Airport Name Clyde Ice Field / Black Hills Airport
Airport Location Spearfish, South Dakota
The Contract Price of your contract is one million two hundred seventy-nine thousand eight hundred seventy dollars and fifty
cents ($1,279,870.50).
You must comply with the following conditions precedent with ten (10) business days of the date of this Notice of Award,
that is by October 1, 2020.
1. You must immediately deliver to the OWNER a duly signed copy of this notice, acknowledging its receipt.
2. You must deliver, with the executed Agreement, the Contract Security (Bonds) as specified in the Instruction to
Bidders, General Provisions and Local and State Provisions.
3. You must deliver to the OWNER, evidence of insurance as outlined within the General Provisions and Local and State
Provisions.
Failure to comply with these conditions within the time specified, will entitle the OWNER to consider your bid abandoned, to
annul this Notice of Award and to declare you Bid Security forfeited.
Within ten (10) business days after you comply with these conditions, the OWNER will return to you one (1) fully signed
counterpart of the Agreement with the Contract documents attached.
KLJ #2005-00309 Page 1 Clyde Ice Field / Black Hills Airport
Notice of Award Version 01.2018
OWNER: BIDDER:
City of Spearfish, South Dakota Quinn Construction, Inc.
Owner Bidder
By: Dana Boke By: Derek Suhr
Authorized Signature Authorized Signature
Mayor – City of Speafish Vice President
Title Title
Date Date
KLJ #2005-00309 Page 2 Clyde Ice Field / Black Hills Airport
Notice of Award Version 01.2018
ITEM NUMBER
__________
AGENDA ITEM SUMMARY
DEPARTMENT/ENTITY: City Engineering
___________________________________________________________
REQUEST:
Approve the Development Agreement for 511 W. Jackson
JUSTIFICATION: (attach any additional justification and/or documentation)
This agreement sets the terms for the future access for this business located at Jackson and
Meier as a result of the changes to the Jackson Blvd. frontage. Access will remain along
Jackson but will be an exit / egress only from the business.
FUNDING: n/a
___________________________________________________________________
RECOMMENDATION: Approve
________________________________________________________
COMMITTEE DATES
LFPS: 09/15/2020
_____________________ PW: _____________________
Deadline: Friday 5:00pm prior to committee, send electronically to the Finance Office.
Departments provide requests/reports to committee:
Legal, Finance and Public Safety: City Administration may report to both committees. Police, Fire, Finance, Building Inspection,
Planning & Zoning and Human Resources.
Public Works: City Administration may report to both committees. Public Works, Library, Parks and Recreation, and Engineering.
Prepared by:
City of Spearfish
625 5th Street
Spearfish, SD 57783
(605) 717-1122
DRIVEWAY AGREEMENT
This DRIVEWAY AGREEMENT (hereinafter “Agreement”) is made and entered into this 21st
day of September, 2020 by and between the C ITY OF SPEARFISH, a municipal corporation and
political subdivision of the State of South Dakota, 625 North Fifth Street, Spearfish, South
Dakota 57783 (hereinafter “Spearfish”) and JOSEPH B. M ILLER & JANET G. MILLER AND
R ANDAL G. P ETERSON & CONNIE A. PETERSON, 511 West Jackson Boulevard, Spearfish,
South Dakota 57783 (hereinafter “Owner”).
1. Owner is the owner of the following described real property situated in the City of
Spearfish, Lawrence County, South Dakota, to-wit:
Lot 1 of the Subdivision of the SW1/4 of Section 10, T6N, R2E,
B.H.M., City of Spearfish, Lawrence County, South Dakota as
shown on the Plat thereof recorded in Plat Book 2, Page 61 in the
Office of the Lawrence County Register of Deeds.
(hereinafter “Owner’s Property”).
2. Owner’s Property is currently zoned as C-1 Central Commercial.
3. Spearfish is re-constructing Jackson Boulevard within the public right-of-way and along
the frontage of Owner’s Property. The re-construction will result in modifications to the
existing curb and driveway within the public right-of-way in this location.
4. In consideration of Spearfish allowing continued driveway access from Owner’s Property
to Jackson Boulevard, Owner is willing to enter into this Agreement to limit or otherwise
restrict use of the driveway per the terms of this agreement and as shown on Exhibit A in
this document.
Development Agreement
Spearfish – Miller and Peterson
Page 1 of 7
NOW THEREFORE, Spearfish and Owner agree as follows:
5. Requirements.
5.1. The driveway abutting Jackson Boulevard may remain open and used by Owner so
long as the property is configured as follows: Office 2,500 square feet, Retail 800
square feet, and Warehouse/storage/shop 1,200 square feet.
5.2. The driveway abutting Jackson Boulevard is permitted only as an egress/exit point for
vehicles onto Jackson Boulevard from Owner’s Property and not as an
ingress/entrance point for vehicles from Jackson Boulevard onto Owner’s Property
for as long as it remains open.
5.3. If the land use of Owner’s Property results in an increase in daily vehicular trips
above what is generated by the current configuration of land uses the driveway
abutting Jackson Boulevard will be closed by Spearfish and will not be replaced.
5.4. The driveway abutting Meier Avenue is permitted to remain..
6. Future Rights. In consideration of Spearfish to construct the following improvements on
Owner’s Property: 1) Re-stripe the existing hard surface parking stalls, 2) placement of
four wheel stop parking blocks, 3) 20 linear feet of curbing between Jackson Boulevard
sidewalk and landscape area, and in the Jackson Boulevard right of way: 4) curb and gutter,
5) a 25 foot wide driveway approach, and 6) sidewalk with handicapped ramps, Owner
agrees it will not claim access rights above those granted by this Agreement. Owner also
agrees it will not pursue or make a claim against Spearfish in any court or tribunal for any
cause regarding the loss of the Jackson Boulevard driveway in the event th e Jackson
Boulevard driveway is closed in accordance with Paragraph 5 above.
7. Succession. This Agreement shall be binding upon Owner, its heirs, successors, assigns,
legal representatives, or transferees and inure to and for the benefit of Spearfish and its
respective successors, assigns, legal representatives, and transferees and shall be deemed to
run with Owner’s Property, to include any replat or subdivision thereof. A copy of this
Agreement shall be recorded in the Office of the Lawrence County Register of Deeds.
8. Complete Agreement. This Agreement, including Exhibit A, constitutes a written
memorandum of the entire understanding and agreement between the parties and
supersedes all prior understandings, negotiation, or agreements between them, whether
written or verbal, with respect to the subject matter hereof.
9. Non-Waiver. Failure by Spearfish to insist upon or enforce any of its rights shall not
constitute a waiver thereof, and nothing shall constitute a waiver of Spearfish’s right to
insist upon strict compliance with the provisions hereof.
Development Agreement
Spearfish – Miller and Peterson
Page 2 of 7
10. Modification. No oral modification hereof shall be binding upon the parties, and any
modification shall be in writing and signed by the parties.
11. Attorney’s Fees and Costs. In the event any legal action is filed to enforce or recover
under any provision of this Agreement, the prevailing party in the suit shall be entitled to
recover court costs and reasonable attorney’s fees from the non-prevailing party.
12. Severability. In the event that any portion of this Agreement is determined to be invalid
or unenforceable, such determination shall not affect the validity or enforceability of any
other provision herein.
13. Notice. Notice, demand, or other communication made pursuant to this Agreement by
any party to another shall be sufficiently given or delivered if it is sent by registered or
certified mail, postage prepaid, return receipt requested, or delivered personally at the
address stated above.
14. Construction and Governing Law. This Agreement shall be construed and governed in
accordance with the laws of the State of South Dakota. Each party has had the
opportunity to review and revise this Agreement, has had equal opportunity for input into
this Agreement, and has had the opportunity to have this Agreement reviewed by that
party’s own independent legal counsel. No individual party, nor its respective legal counsel,
shall be construed to be the drafter or primary drafter of this Agreement. In the event of
any dispute regarding the construction of this Agreement or any of its provisions,
ambiguities or questions of interpretation shall not be construed more in favor of one
party than the other. Instead, questions of interpretation shall be construed equally as to
each party.
15. Other Documents. The Parties hereby mutually agree to execute any and all other
documents necessary or needed to effectuate the purposes of this Agreement.
16. Counterparts. This Agreement may be executed in two or more counterparts, both or all
of which taken together shall constitute one and the same instrument, and any party
hereto may execute this Agreement by signing any such counterpart. Facsimile and
electronic versions of signatures shall be treated as originals.
In Witness Whereof, the Parties have set their signatures.
[Separate signature pages follow]
Development Agreement
Spearfish – Miller and Peterson
Page 3 of 7
C ITY OF SPEARFISH
By: ____________________________
(Seal) Dana Boke, Its Mayor
Attest:
________________________________
Michelle DeNeui, Finance Officer
State of South Dakota )
) ss.
County of Lawrence )
On this ____ day of _________, 2020, before me, the undersigned officer, personally
appeared Dana Boke and Michelle DeNeui, known to me or satisfactorily proven to be the
persons described in the foregoing instrument, and acknowledged that they executed the same
in the capacity therein stated and for the purposes therein contained.
In Witness Whereof, I have set my hand and official seal.
(Seal) _______________________________
Notary Public
My commission expires: ____________
Development Agreement
Spearfish – Miller and Peterson
Page 4 of 7
JOSEPH B & JANET G M ILLER
By:________________________________
Joseph B. Miller
________________________________
Janet G. Miller
State of South Dakota )
) ss.
County of Lawrence )
On this ____ day of _______________, 20___, before me, the undersigned officer,
personally appeared Joseph B. Miller & Janet G. Miller, and who are known to me or
satisfactorily proven to be the persons described in the foregoing instrument and
acknowledged that they executed the same in the capacity therein stated and for the purposes
therein contained.
In Witness Whereof, I have set my hand and official seal.
(Seal)
____________________________
My Commission Expires: __________ Notary Public
Development Agreement
Spearfish – Miller and Peterson
Page 5 of 7
R ANDAL G. & C ONNIE A. P ETERSON
By: _________________________________
Randal G. Peterson
_________________________________
Connie A. Peterson
State of South Dakota )
) ss.
County of Lawrence )
On this ____ day of _______________, 20___, before me, the undersigned officer,
personally appeared Randal B. Peterson & Connie A. Peterson, and who are known to me or
satisfactorily proven to be the persons described in the foregoing instrument and
acknowledged that they executed the same in the capacity therein stated and for the purposes
therein contained.
In Witness Whereof, I have set my hand and official seal.
(Seal)
____________________________
My Commission Expires: __________ Notary Public
Development Agreement
Spearfish – Miller and Peterson
Page 6 of 7
Exhibit A
A full and complete diagram of the improvements is on file in the
City of Spearfish Finance Office.
Development Agreement
Spearfish – Miller and Peterson
Page 7 of 7