Public Safety Committee (Meets 3rd Thursday of each month at 6:00 p.m.)
Regular MeetingSuperior, WI · January 18, 2024
Minutes
PUBLIC SAFETY COMMITTEE Minutes
Thursday, January 18th, 2024
The meeting was called to order by Councilor Ledin at 6:04 pm on January 18th, 2023, in Government
Center Room 204.
Committee Members: Nick Ledin -Chair, Tylor Elm- Vice Chair, Mark Johnson, Mike Herrick
1. ROLL CALL
PRESENT: Nick Ledin-Chair, Tylor Elm-Vice Chair, Mark Johnson, Mike Herrick
CITY STAFF PRESENT: Fire Chief Camron Vollbrecht, Captain Winterscheidt, Lieutenant Trone*
(Entered meeting at 6:25) Nikki Kalan
OTHERS PRESENT: DJ Ross – owner of Wire Werks, Maria Lockwood (started virtual and
physically entered the meeting at 6:15 PM)
*Attended virtually
2. APPROVAL OF MINUTES
2.1. Public Safety Committee (Meeting held December 21, 2023)
MOTION by Mark Johnson, second by Tylor Elm, and carried to approve the minutes from
the December 21, 2023 meeting
3. RECURRING
3.1. Police and Fire Department Updates
Captain Winterscheidt states there were 8 applicants for the sergeant eligibility list and 3 applicants
for the Officer in Charge program. Captain promotion process was posted a couple days ago and
those positions will be filled in February. Ford states the Police Department will receive 7 hybrid
explorers in the first quarter of 2024, no timeline on when the rest will arrive. The department did a
PepperBall demonstration today, they have been approved in the budget and will be implemented
sometime this year.
Chief Vollbrecht states the run volume in 2023 was down slightly from 2022; this was likely due to
running ARVs and changing how they respond to fire alarms. A new Firefighter started yesterday, he
previously worked with Cloquet Fire for around two years. They have 16 interviews for Firefighter
this Saturday. The Fire Department airboat is back in operation, they had it on the ice today and it had
been performing well. They will be doing training on the airboat before it’s in full service.
4. NEW BUSINESS
4.1. Request to Add Reserved Parking Spaces in Lot Across from Wire Werks – DJ Ross
(Owner of Wire Werks)
Owner of Wire Werks, DJ Ross, requests reserved parking spaces in the lot across from his business.
In the Winter, he has a hard time finding off street parking for the vehicles in service due to snow
piles. The committee would like to hear from Public Works regarding the options for parking.
Councilor Elm will reach out to Public Works Director Todd Janigo.
MOTION by Mark Johnson, second by Tylor Elm, and carried to hold this item in committee.
*DJ Ross and Lieutenant Trone left the meeting
Public Safety Committee Minutes – 01/18/2024; page 1 of 1
4.2. Approve Station-3 Renovation Architecture and Engineering Firm Contract with OPN
Architects
The Fire Department received 6 qualified companies for the station 3 renovation. They are
requesting approval to contract with OPN Architects due to their extensive experience in designing
and overseeing fire stations while the station is still being occupied by firefighters. OPN states the
budget may be tight for the renovations being requested; Councilor Johnson will write a letter to the
Finance Committee to see if more funds could be allocated to the renovation.
MOTION by Tylor Elm, second by Mark Johnson, and carried to approve. Will send to
council.
4.3. Approve Purchase of a Rosenbauer RTX EV Fire Engine
The Fire Department is requesting approval on a Rosenbauer RTX EV Fire Engine with a build time
of approximately 18-22 months. An equipment committee of the Fire Department looked at three
different EV fire engines. The current engine three will reach its 15-year service life in 2026.
Councilor Elm recommends the equipment committee write a report on their findings and submit to
the Finance Committee.
MOTION by Mark Johnson, second by Tylor Elm, and carried to approve the Rosenbauer
RTX EV Fire Engine and send to Finance Committee for purchasing.
5. ADJOURNMENT at 7:29 by Councilor Ledin.
Submitted by Nikki Kalan
Public Safety Committee – 01/18/2024; page 2 of 2
Agenda
PUBLIC SAFETY COMMITTEE Agenda
Thursday, January 18th, 2024–6:00 PM
Government Center Room 204
Virtual Link
Click here to join the meeting
Meeting ID: 293 937 333 593 / Passcode: BGVDUL
Or call in (audio only)
+1 872-242-8028,,501684506#
Phone Conference ID: 636 039 665#
COMMITTEE MEMBERS: Nick Ledin, Chair; Tylor Elm, Vice-Chair, Mark Johnson, Mike Herrick
1 ROLL CALL
2 APPROVAL OF MINUTES
2.1 Public Safety Committee (Meeting held December 21, 2023)
3 RECURRING BUSINESS
3.1 Police and Fire Department Updates
4 NEW BUSINESS
4.1 Request to Add Reserved Parking Spaces in Lot Across From Wire Werks – DJ Ross
(Owner of Wire Werks)
4.2 Approve Station-3 Renovation Architecture and Engineering Firm Contract with OPN
Architects
4.3 Approve Purchase of a Rosenbauer RTX EV Fire Engine
5 ADJOURNMENT
Notice is hereby given that a majority of the members of the Common Council may be present at the meeting, and
although this may constitute a quorum of the Common Council, the Council will not take any action at this
meeting.
Pursuant to the Americans with Disabilities Act of 1990, if you are in need of an accommodation to participate in
the public meeting process, please call (715) 395-7200 by 4:30 p.m. on the day prior to the scheduled meeting date
(OR dial 711 for Telecommunications Relay Service). The City will attempt to accommodate any request
depending on the amount of notice received.
*********************************************************************************************
In compliance with Wisconsin Open Meetings Law, this agenda was posted on 01/16/2024 at the following
locations: Superior Government Center, Douglas County Courthouse, and online at
https://www.ci.superior.wi.us/agendacenter. It was also emailed to the Superior Telegram and the Superior Public
Library.
PUBLIC SAFETY COMMITTEE – 01/18/2024 MEETING Page 1 of 1
PUBLIC SAFETY COMMITTEE Minutes
Thursday, December 21, 2023
The meeting was called to order by Councilor Elm at 6:00 pm on December 21, 2023, in Government
Center Room 204.
Committee Members: Nick Ledin -Chair, Tylor Elm- Vice Chair, Mark Johnson, Mike Herrick
1. ROLL CALL
PRESENT: Tylor Elm-Vice Chair, Mark Johnson, Mike Herrick
ABSENT: Nick Ledin-Chair
CITY STAFF PRESENT: Fire Chief Camron Vollbrecht, Captain Winterscheidt*, Lieutenant Thor
Trone*, Nikki Kalan
OTHERS PRESENT: DJ Ross – Owner of Wire Werks
*Attended virtually
2. APPROVAL OF MINUTES
2.1. Public Safety Committee (Meeting held November 16th, 2023)
MOTION by Mike Herrick, second by Mark Johnson, and carried to approve the minutes from
the November 16th, 2023, meeting.
3. RECURRING
3.1. Police and Fire Department Updates
Chief Vollbrecht discussed recent fires and a rescue that happened in the city. The Fire Department
has one new hire; he is currently going through the background process. Chief Vollbrecht discussed
recent trainings through the department. Toys for Tots distribution was a success for 2023. The Fire
Department received six bids for station renovations; they are meeting with the Contract Analyst in
early 2024 to review them.
The Police Department is currently filling positions within the department. A Certified Peer Support
Specialist, Breanna Pearson, recently started with the Coar+ Team in the Police Department doing
active outreach with CRS Jen Stank. Officer Kelsey Davis has been selected to fill the next detective
spot. A Deflection Resource Officer spot has been posted; this will be part of the Coar+ Team and
will be filled from existing ranks. A new Sergeant eligibility list has opened, and the department
expects to hire multiple Sergeants from this list. The internal Narcotics Investigations unit has
previously been backed by a Northern Area Crime Unit (NACU) grant, but this grant has become
more restrictive. As a result, one internal investigator will be assigned to the Duluth Task Force and
one internal investigator position will be reallocated to the Internet Crimes Against Children unit. The
Police Department just finished up with a new hiring process with 13 applicants, they will start
interviews in January 2024. On January 4th, 2024, there will be 3 new officers being sworn in.
4. NEW BUSINESS
*Motion to move agenda item 4.2 ahead of 4.1 by Mark Johnson, second by Mike Herrick, and
carried.
4.2 Request to add reserved parking spaces in lot across from Wire Werks -DJ Ross
DJ Ross, owner of Wire Werks, requests to add reserved parking spaces in the lot across from Wire
Public Safety Committee Minutes – 12/21/2023; page 1 of 1
Werks. DJ Ross states he does a lot of business with the city/county departments and would like to
park customer vehicles overnight in the lot across the street. He does not have enough off-street
parking where his business is located. There is some concern from Public Works regarding plowing
snow as needed, but there is not a lot of demand for the lot. Will hold this agenda item in committee
until January 2024 and invite Todd Janigo, Chris Carlson, and Jason Serck.
MOTION by Mark Johnson, second by Herrick, and carried to hold agenda item 4.2 in
committee.
*DJ Ross and Lieutenant Thor Trone left the meeting
4.1 Approve Consent Agreement with T&T Salvage
Superior Fire Department would like to provide more resources for shipboard fires to their
firefighters. They have been working with the Marine Fire Fighting Task Force in the Great Lakes for
a few years now attending different conferences and trainings. Chief Vollbrecht is requesting
approval to enter an agreement with T&T Salvage to provide additional resources to the Superior Fire
Department.
MOTION by Mark Johnson, second by Mike Herrick, and carried to approve. Will send to
council.
5. ADJOURNMENT at 6:47 by Councilor Elm.
Submitted by Nikki Kalan
Public Safety Committee – 12/21/2023; page 2 of 2
Superior Fire Department
Camron Vollbrecht, Fire Chief Phone: 715-395-1680
3326 Tower Avenue
Superior, WI 54880
Web site: www.ci.superior.wi.us
Public Safety Committee Date: January 18th, 2024
MEMORANDUM
Date: January 18th, 2024
To: Public Safety Committee
From: Camron Vollbrecht, Fire Chief
RE: Station-3 Renovation Architecture and Engineering Firm Contract with OPN
Architects
Introduction
Fire Chief Vollbrecht is requesting the Public Safety Committee approve and forward the
contract with OPN Architects for the architectural design and engineering of a renovation on
Station-3 in the amount of $79,900.00 to the City Council for final approval.
Background and Proposals Received
On Friday, November 10th, 2023, the City of Superior advertised a request for qualifications for
the design and engineering of Fire Station #3. Major design elements include structural roof
improvements and roof replacement, mechanical and electrical upgrades, interior design
upgrades, and an approximate 500 sq. ft. expansion.
The request for qualifications was written with generally desired specifications. Each contractor
was to submit detailed information on their qualifications and experience. The requests stated
that the proposals would be reviewed, and a contractor would be selected based on their
proposal, addenda acknowledgement, sub-consultants, reference checks, and interviews.
The request was advertised through the Superior Telegram and posted electronically at
DemandStar.com. Bids were opened Tuesday, December 12, 2023, at 2:00pm.
1|Page
The following six companies submitted qualifications:
• LHB
• Meyer Group Architects
• OPN Architects
• TDKA
• Westlund Consultancy, LLC
• Architecture Advantage
After internal reviews of the six firm’s qualifications, LHB and OPN Architects were invited to
for an in-person presentation discussion of qualifications, the firm’s approach, process, ability to
meeting the timeline, and approach to this project. LHB presented their qualifications on January
4th and OPN Architects on January 10th. The interviews were held at the Headquarters Fire
Station. Based on their presentations of qualifications, experience with municipal fire projects,
selected team, and approach to this project, OPN Architects was selected to engage in further
discussions of specific scope and negotiating costs.
OPN Architects has extensive experience in both designing fire stations and overseeing
construction while firefighters are occupying and operating the facility. They made the point
during their presentation to design the most efficient remodel for the budget while providing for
enhanced safety of our firefighters and functionality of the station. OPN presented innovative
ideas for energy saving mechanical systems, as well as offering possible energy incentives
related to those options. OPN stressed their focus on providing detailed plans and specifications
so that engineer estimating, and the actual bidding of the construction phase is concise and
reduces change orders during the construction phase. OPN references highly recommended the
firm.
Budget Source
The renovation project at Fire Station 3 is included in the Council approved 2024 CIP budget, for
$750,000.00.
2|Page
Recommendation
It is the recommendation of the Superior Fire Department to award the Fire Station 3 renovation
project to OPN Architects in the amount of $79,900.00.
Approved:____________________________________ Date:__________________
Committee Chair Ledin
Denied:______________________________________ Date:__________________
Committee Chair Ledin
3|Page
Agreement
Professional Engineering
Services Agreement
for the Fire Station 3 Remodel Project
This agreement made this _____ day of February 2024, by and between, OPN Architects, an
Incorporated business (herein known as ‘Consultant’), and the City of Superior, a municipal
corporation, through its Fire Department (herein known as ‘City’). The parties to this
Agreement shall be bound by the following terms and conditions.
Purpose
The purpose of this Agreement is to develop a set of construction documents (design, technical
specifications and standards) in compliance with applicable codes and regulations, for the Fire
Station 3 Remodel Project, in accordance with the terms and conditions of this Agreement.
Scope
Consultant services include, but are not limited to, all of the tasks, activities and requirements
included in Exhibit A, “Scope of Services” and other tasks and responsibilities as identified by
the Fire Department. By reference, Exhibit A is hereby incorporated into this Agreement, but
shall not in any way restrict the services provided by the Consultant nor prohibit the City from
requesting other tasks or procedures germane to the Agreement. If there are other tasks
identified by the City that are beyond the scope identified in Exhibit A, these will be considered
extra services and can be added to this agreement by an amendment.
Term
The term of this agreement shall be from the date of the agreement through December 31, 2025
or completion of the project.
Services and Fees
Costs shall be full compensation for services performed or services rendered and for all labor,
materials, supplies, equipment, incidentals, applicable taxes, fees and applicable expenses,
necessary to complete the services for a not to exceed amount of seventy-nine thousand, nine
hundred dollars ($79,900.00), attached Exhibit A, and incorporated herein by reference. All other
expenditures shall be the sole responsibility of the Consultant.
Changes to services and/or fees that are agreed to by both parties shall be acknowledged in an
amendment signed by both parties.
Payments
Consultant may invoice the Fire Department on a monthly basis during the progress of the work
for partial payment on account for work completed and accepted to date and shall not impose any
penalties or interest for amounts invoiced. The invoice shall be itemized and in a form
satisfactory to the City, of expenses incurred in the previous period. The City shall pay agreed
upon amounts within thirty (30) days of receipt.
Insurance
Consultant shall provide up-to-date, accurate professional liability information on Consultant’s
Data Record, including amount of insurance, deductible, carrier and expiration date of coverage.
Consultant shall furnish the City with an endorsement for earlier notice of cancellation and/or
non-renewal and the Certificate of Insurance showing the type, amount, deductible, effective date
and date of expiration of such policy. Consultant shall not cancel or materially alter this coverage
without prior written approval by the City. Consultant shall be responsible for consultants
maintaining professional liability insurance during the life of their Agreement and for 2 years after
final acceptance for the service.
Consultant and its subconsultants retained under the terms of this Agreement shall procure and
maintain professional liability insurance providing for payment of the insured's liability for errors,
omissions or negligent acts arising out of the performance of the professional services required
under this Contract.
It is hereby agreed and understood that the insurance required by the City is primary coverage
and that any insurance or self-insurance maintained by the City, its officers, council members,
agents, employees or authorized volunteers will not contribute to a loss. All insurance shall be
in full force prior to commencing work and remain in force until the entire job is completed and
the length of time that is specified, if any, in the agreement or listed below whichever is longer.
1. PROFESSIONAL LIABILITY
A. Limits
(1) $1,000,000 each claim
(2) $1,000,000 annual aggregate
B. Must continue coverage for 2 years after final acceptance for service/job
2. GENERAL LIABILITY COVERAGE
A. Commercial General Liability
(1) $1,000,000 each occurrence limit
(2) $1,000,000 personal liability and advertising injury
(3) $2,000,000 general aggregate
(4) $2,000,000 products - completed operations aggregate
B. Claims made form of coverage is not acceptable.
C. Insurance must include:
(1) Premises and Operations Liability
(2) Contractual Liability
(3) Personal Injury
(4) Explosion, collapse and underground coverage
(5) Products/Completed Operations must be carried for 2 years after
acceptance of completed work.
(6) The general aggregate must apply separately to this project/location
3. BUSINESS AUTOMOBILE COVERAGE
A. $1,000,000 combined single limit for Bodily Injury and Property Damage
each accident
B. Must cover liability for Symbol #1 - "Any Auto" - including Owned, Non-
Owned and Hired Automobile Liability.
4. WORKERS COMPENSATION AND EMPLOYERS LIABILITY
A. Must carry coverage for Statutory Workers Compensation and an
Employers Liability limit of:
(1) $100,000 Each Accident
(2) $500,000 Disease Policy Limit
(3) $100,000 Disease - Each Employee
5. UMBRELLA LIABILITY - Provide coverage at least as broad as the underlying
Commercial General Liability, Automobile Liability and Employers Liability, with a
minimum limit of $2,000,000 each occurrence and $2,000,000 aggregate, and a maximum
self-insured retention of $10,000.
6. ADDITIONAL INSURANCE PROVISIONS
A. Primary and Non-contributory requirement - all insurance must be primary and non-
contributory to any insurance or self-insurance carried by City
B. Acceptability of Insurers - Insurance is to be placed with insurers who have an A.M. Best
rating of no less than A- and a Financial Size Category of no less than Class VII, and who
are authorized as an admitted insurance company in the state of Wisconsin.
C. Additional Insured Requirements - The following must be named as additional insureds
on the General Liability and Business Automobile liability coverage arising out of project
work - City, and its officers, council members, agents, employees and authorized volunteers.
On the Commercial General Liability Policy, the additional insured coverage must be ISO
form CG 20 10 07 04 and also include Products - Completed Operations additional insured
coverage per ISO form CG 20 37 07 04 or their equivalents for a minimum of 2 years after
acceptance of work. This does not apply to Workers Compensation Policies.
D. Deductibles and Self-Insured Retentions - Any deductible or self-insured retention must be
declared to and approved by the City.
E. Evidences of Insurance - Prior to execution of the agreement, the Consultant shall file with
the City a certificate of insurance (Accord Form 25-S or equivalent) signed by the insurer's
representative evidencing the coverage required by this agreement. In addition, form CG 20
10 07 04 for ongoing work exposure and form CG 20 37 07 04 for products-completed
operations exposure must also be provided or its equivalent.
F. Provide a waiver of subrogation in favor of the City for the workers’ compensation.
Agreement General Terms and Conditions
1. No Relationship. Consultant understands and agrees that the relationship of Consultant and
the City arising out of this agreement is that of a contracted service provider, not an employee or
contracted employee of the City or any other entity within the municipality, and therefore, is not
entitled to any benefits provided to employees of the City.
2. Taxes. Consultant will act as an independent contractor and will be responsible for all
federal, state and local taxes arising in accordance with this contract, as well as any other taxes,
fees or licensing expenses pertaining to these services.
3. Confidentiality. Consultant shall diligently protect the confidentiality of any
information, documentation or communication received from the City that contains
personal, financial or other information of a confidential nature, and shall not disclose said
information to any other persons, organizations or entities without the expressed written
approval of the City, except that Consultant may disclose confidential information that is
reasonably necessary to defend itself in the event of a dispute. Nothing herein shall be
construed to conflict with the obligations under Wisconsin Public Records Law, Wis. Stat.
§19.31, et. Seq.
4. Qualifications. By accepting this agreement, Consultant represents that they possess the
necessary skills and qualifications to perform work under this agreement. Consultant will
comply with all applicable local, state, and federal licensure requirements and will provide proof
upon request.
5. Legal Relations. Recommendations, policies, procedures and other communications provided
by the Consultant under this agreement will comply with all applicable laws, ordinances, rules
and regulations promulgated and enforced by the City and any other proper authority having
jurisdiction over the conduct of the operations of the City. The Consultant shall comply with and
observe federal, state and local laws that may be applicable to the project. In carrying out
provisions of this Agreement or exercising power or authority granted to the Consultant thereby,
there shall be no personal liability to the City, it being understood that in such matters the City
acts as representatives of the State. The Consultant is not an agent of the State.
6. Assignment of Agreement. The Consultant shall not subcontract, assign or transfer any part
of this work to any other parties without the express written agreement of the City.
7. Claims. Claims, disputes and other matters in question arising from the performance of
this contract shall be brought to the Fire Chief for review and mutual resolution. If the
parties cannot mutually resolve the matters in question, the parties shall endeavor to settle
disputes by mediation. A demand for mediation shall be filed, in writing, within a reasonable
period of time after a claim, dispute, or other matter in question has arisen. In no event shall
a demand for mediation be made after the date when the institution of legal or equitable
proceedings, based upon such a claim, dispute, or other matter in question would have been
barred by an applicable statute of limitations.
8. Ownership of Documents. All drawings, specifications, renderings, models, approved
copies, manuals and other such documents prepared by the Consultant or any party pursuant to
this Agreement shall become the property of the City of Superior on completion and acceptance
of any of the Consultant’s work, or upon termination of the Agreement and upon payment in
accordance with the terms of this Agreement and shall be delivered to the City of Superior upon
request.
9. Indemnifications. Consultant hereby agrees to indemnify, defend and hold harmless the City its
elected and appointed officials, officers, employees, agents, representatives and volunteers, and each
of them, from and against any and all suits, actions, legal or administrative proceedings, claims,
demands, damages, liabilities, interest, attorneys' fees, costs, and expenses of whatsoever kind or
nature in any manner directly or indirectly caused, occasioned, or contributed to in whole or in part
or claimed to be caused, occasioned, or contributed to in whole or in part, by reason of any act,
omission, fault, or negligence, whether active or passive, of Consultant or of anyone acting under its
direction or control or on its behalf, even if liability is also sought to be imposed on the City, its elected
and appointed officials, officers, employees, agents, representatives and volunteers.
The obligation to indemnify, defend and hold harmless the City, its elected and appointed officials,
officers, employees, agents, representatives and volunteers, and each of them, shall be applicable
unless liability results from the sole negligence of the City, its elected and appointed officials, officers,
employees, agents, representatives and volunteers.
Consultant shall reimburse the City, its elected and appointed officials, officers, employees, agent or
authorized representatives or volunteers for any and all legal expenses and costs incurred by each of
them in connection therewith or in enforcing the indemnity herein provided. In the event that
Consultant employs other persons, firms, corporations or entities (subcontractor) or volunteers as part
of the work covered by this Agreement, it shall be the consultant’s responsibility to require and
confirm that each sub-contractor enters into an Indemnity Agreement in favor of the City, its elected
and appointed officials, officers, employees, agents, representatives and volunteers, which is identical
to this Indemnity Agreement.
This indemnity provision shall survive the termination or expiration of this Agreement.
10. Final Payment. Prior to final payment, the Fire Department shall review project documents,
recommendations, tasks and procedures, etc., and all other recommendations submitted by
Consultant to determine the satisfaction thereof; it will be at the Fire Department’s sole
discretion when the final payment is made. Final payment will be made to Consultant within
thirty (30) days of the City’s acceptance of services as complete.
11. Deficiencies. Consultant shall not be entitled to payment for work found deficient or failing
to conform to the requirements set forth in this agreement and is not entitled to further payments
until corrected to the satisfaction of the Fire Chief. The City will inform the Consultant of any
deficiencies and/or items that do not conform to this agreement within thirty (30) days of receipt.
12. Termination. This Agreement may be terminated by either party without cause upon ten
(10) days written notice to the other. In the event of termination, Consultant shall be paid for
services performed to termination date. The results of the work by Consultant shall immediately
be turned over to the City of Superior, and is a condition of final payment.
13. Warranty of Documents. The City, its representatives, employees, and agents make no
representations of the accuracy of documents, drawings, procedures, etc., provided to Consultant
under this Agreement, and shall not be held liable for the inadequacy thereof. To the greatest
extent possible, any document, drawing, procedure, etc., provided by the City for the purposes of
the project that cannot be utilized as reliable information by the Consultant shall be noted as such
by the City in the transmittal of the material.
14. Entire Agreement. This Agreement contains the entire understanding of the parties with
respect to the maters contained herein and supersedes all other written and oral agreements
between the parties with respect to such matters.
15. Modification. This Agreement is binding only when signed by both parties. Any
modifications or amendments must be in writing and signed by both parties.
16. Force Majeure. Each party shall be excused from any breach of this Agreement which is
caused by war, strike, act of Nature or other similar circumstances normally deemed outside the
control of well-managed businesses.
17. Governing Law. The Agreement will be interpreted, and the rights and liabilities of the
Parties determined, in accordance with the laws of the State of Wisconsin.
18. Headings and Captions. Headings and Captions appear solely for convenience of reference.
Such headings and captions are not part of this agreement and shall not be used to construe it.
19. Validity. If any provision or provisions of this Agreement shall be held to be invalid, illegal
or unenforceable, the validity, legality and enforceability of the remaining provisions shall not in
any way be affected or impaired thereby.
20. Integrated Agreement. This Agreement contains the entire agreement and understanding
among the Parties regarding the matters set forth herein and supersedes all previous negotiations,
discussions, and understandings regarding such matters. The Parties acknowledge and represent
that they have not relied on any promise, inducement, representation, or other statement made in
connection with this Agreement that is not expressly contained herein. The terms of this
Agreement are contractual and not a mere recital.
21. Safety And Security. The Consultant shall at all times perform in a safe and workmanlike
manner to avoid injury or damage to any person or property. The Consultant shall comply with
applicable requirements and specifications relating to the safety, health and sanitation measures
applicable to the project. The Consultant shall exercise the applicable necessary precautions for
the safety of its employees, and be in compliance with applicable federal, state and local laws,
statutes, ordinances, rules and regulations. Including, but not limited to, the Wisconsin Labor
Code, The U.S. Department of Transportation Omnibus Transportation Employee Testing Act,
and OSHA standards.
The Consultant shall provide its employees all necessary safeguards, devices and protective
equipment, including but not limited to adequate life protection and lifesaving equipment, and
shall ensure the proper inspection and maintenance of safety measures are current and in
compliance.
The City may halt progress on any project where appropriate safety measures and equipment are
not being used or any safety regulations are not being followed. Services will not be permitted to
resume until required safety provisions have been made and delays as a result of this provision
will not be considered a basis for an increase in the Agreement price or an extension of the
completion deadline.
22. Standard of Care. Consultant represents that it will perform the Services in a manner
consistent with that degree of care and skill ordinarily exercised by members of the same
profession currently practicing under similar circumstances at the same time and in the same
locality. To the extent Consultant’s services do not meet this standard of care; Consultant shall
re-perform its work at no cost to the City.
23. Appropriation. State and/or Federal funds may be used to fund all or part of this
Agreement. Allowances detailed in the Project scope shall be awarded at the City’s discretion,
and is subject to available funding, project progress and other terms and conditions as identified
by the City. The City will not be held liable for any damages incurred due to changes in State or
Federal funding, including (but not limited to) a reduction, delay, or cancellation of the project.
24. Non-Discrimination. Upon execution of this Agreement, Contractor agrees as follows:
Contractor and all Subcontractors do not discriminate against any employee, applicant for
employment, independent contractor, or any other persons because of race, color, religion, sex,
sexual orientation, gender identity, or national origin.
25. Authority. The Consultant represents that it has the authority to enter into this Agreement.
If the Consultant is not an individual, the person(s) signing on behalf of the Consultant represents
and warrants that they have been duly authorized to bind the Consultant and sign this Agreement
on the Consultant’s behalf.
The parties, intending to be legally bound have executed this agreement on the day and year set
forth above.
Signatures
Company: OPN Architects
Address: 212 N 3rd Avenue, Suite 312, Minneapolis, MN 55401
Phone:
_____________________________
Tate Walker, Associate Principal
ATTEST: CITY OF SUPERIOR, WISCONSIN
___________________________________
Jim Paine, Mayor Heidi Blunt, Clerk
___________________________________
Nicholas Rhinehart, Finance Director Frog Prell, City Attorney
Provision has been made to
pay the liability that will
accrue under this contract.
*Approved by Superior Common Council on
Exhibit A Fire Station 3 Remodel Agreement
Jane Darwin
Contract Analyst
City of Superior
1316 N. 14th Street
Superior, WI 54880
RE: Superior Fire Station 3 - Professional Service Agreement - OPN
Architects
Date: January 12, 2024
Ms. Darwin:
OPN Architects is pleased to provide this summary of professional design
services for The City of Superior’s Fire Station 3.
Project criteria
Based upon RFP #23-44-FD posted on 11/17/23, we have developed our scope of
services and preliminary fees upon the following criteria:
Site Location: 2531 E 5th St, Superior, WI 54880
Project’s physical characteristics: existing building with 1 floor and a mezzanine
totaling approximately 4,000 square feet.
Building Program: Major design elements include structural roof improvements and
roof replacement, mechanical and electrical upgrades, interior design upgrades, and
an approximate 500 sq. ft. expansion. Refer to the above reference RFP for more
information.
Project Delivery Method: Design-Bid-Build
Owners Estimated Construction Budget: While the final construction cost has not
been established yet, we are basing our proposal on an estimated project cost of
$750,000, and an estimated construction cost of $600,000.00. Should the budget
increase, an additional design fee will be assessed at 13% of the increased budget.
Additional design fees are to be based on the final cost estimate prepared in the
Construction Documents phase.
Project Schedule
OPN will meet a mutually agreed upon schedule for the delivery of documents.
Timely receipt of information and feedback from the Owner is critical.
Commence Construction: July 2024
Substantial Completion: 6-9 months (per contractor determination)
The professional fees as requested in the RFP and outlined in this proposal
response are based on an estimated design period lasting up to 12 weeks and
construction period lasting 36 weeks.
Project Team
OPN Architects, includes the following consultant team within our Scope of Work:
Architect OPN Architects, Inc.
Tate Walker, Associate Principal
MEP Engineer Emanuelson-Podas Consulting Engineers
Scott Vander Heiden, Managing Partner
Structural Engineer Larson Engineering
Sean R. Noren, Structural Department Manager
Civil Engineer Larson Engineering
Eric Meyer, Project Manager
Cost Estimator Adolfson & Peterson Construction
Patrick Sims, Project Executive
Scope of Services
Our work would be divided into 4 phases – Preliminary Design, Construction
Documents, Bidding and Negotiations, and Construction Administration.
We anticipate the Owner would make available to us all pertinent existing
drawings and data.
Deliverables: Progress sets and review meetings provided at the end of Preliminary
Design and at 95% Construction Document Phases
Meetings: 3 in-person meetings and 5 virtual meetings are included in the Design
Phases (PD and CD), an in person Prebid meeting, an in-person Preconstruction
meeting, 3 in person and 6 virtual Construction Administration meetings. Additional
in-person meetings are billed at $1,250 each.
Compensation
The professional fee for developing the scope of services outlined in this proposal will
be a lump sum fee of Seventy-Eight Thousand Four Hundred ($78,400.00) plus
additional services or reimbursable expenses if necessary. This fee is summarized
below.
Design Fee Breakdown per Phase:
Preliminary Design $ 23,520 30%
Construction Documents $ 35,280 45%
Bidding and Negotiations $ 3,920 5%
Construction Administration $ 15,680 20%
Total Fee $ 78,400 100%
Architect $ 40,100 51%
MEP Engineer $ 17,800 23%
Structural Engineer $ 8,600 11%
Civil Engineer $ 8,400 11%
Cost Estimator $ 3,500 4%
Total Fee $ 78,400 100%
This fee will cover services and activities required to accomplish the scope of work
within a time frame of 24 months. Should the project timeframe extend beyond this,
as a result of conditions not under the control of OPN, fees may be adjusted to align
with the effort extended.
The project will be invoiced monthly as a percentage of work completed and
commensurate with the work plan schedule. Any services if required beyond those
described within the Agreement will be reviewed with the client to understand impact
to scope of work or related fees.
Refer to attachment for standard hourly rates.
Reimbursable Expenses
Reimbursable expenses are in addition to the above fee and will be invoiced at 1.0
times actual cost. Reimbursable expenses include: authorized out-of-town travel,
courier services, express mail, plan review fees, reproduction of project
documents, photography, out-of-house digital processing, physical models, meals
and mileage at the government standard rate.
Estimated Reimbursable Expenses = $1,500
Exclusions and Additional Services – Available Upon Request
FFE Design/Selection and Procurement Services
Signage Design
Commissioning
Geotechnical Services
Site Surveying
Acoustical Consulting Services
Kitchen Consultant Services
Landscape Architecture
Contract Agreement
This Letter of Proposal is intended to document the primary issues concerning our
Agreement Between Owner and Architect. Once details of this proposal are
confirmed, we will provide you with the AIA B101 – 2017, Standard Form of
Agreement Between the Owner and Architect. Should you desire a different form
of agreement the Architect will assist in the preparation of the agreement at our
standard hourly rates.
All of us at OPN are extremely excited to work on this fantastic project. Please
review this proposal and let me know if you have any questions.
Thank you.
Tate Walker
Associate Principal, OPN Architects
OPN ARCHITECTS
Hourly Rates – 2024
Principal $250
Associate Principal $185
Associate $170
Healthcare Planner $205
Senior Project Manager/Senior Project Architect $145
Project Manager/Project Architect $125
Architect $115
Intern Architect 3 $100
Intern Architect 1-2 $80
Senior Interior Designer $115
Interior Designer $90
Construction Administrator $105
Architectural Technician $85
Directors of Business Support $130
Business Support Specialist $95
Marketing Specialist $90
Administrative Support $65
College Interns $50
These rates are subject to an annual adjustment on or around January 1, and your contract will
adjust accordingly.
Superior Fire Department
Camron Vollbrecht, Fire Chief Phone: 715-395-1680
3326 Tower Avenue
Superior, WI 54880
Web site: www.ci.superior.wi.us
Public Safety Committee Date: January 18th, 2024
MEMORANDUM
Date: January 15th, 2024
To: Public Safety Committee
From: Camron Vollbrecht, Fire Chief
RE: Purchase of a Rosenbauer RTX EV Fire Engine
1. Introduction:
It has been requested by the Fire Department to purchase or lease one (1) 2026 Rosenbauer RTX
EV Fire Engine with appropriate equipment. Total cost is $1,837,202 including incentives for a
short demo period. This Rosenbauer RTX will run off electric battery power and is equipped with
a small diesel “range extender” that charges the battery if needed. The Fire Department’s
equipment committee also retained a quote from E-One for a similar EV fire engine for
$2,047,821.
Fire Chief Vollbrecht is requesting the Public Safety Committee approve and forward the
selection of a Rosenbauer RTX to the Finance Committee for Funding.
2. Background:
This EV fire engine is available through Rosenbauer America with a contractual build time of
approximately 18-22 months. An equipment committee made up of several firefighters
representing different ranks from Superior visited the factory in Wyoming, MN to put
specifications together. The committee also visited the Pierce Manufacturing facility in Appleton,
WI and reviewed their EV offering as well as specified and demoed an E-One EV fire engine that
was brought to Headquarters here in Superior. The committee also reviewed a traditional diesel
fire engine from Rosenbauer.
3. Analysis/Discussion:
The current Engine Three is a 2011 Pierce Velocity that will reach its 15-year front line service
life in 2026. Currently the lead time to build fire engines is significant. Ordering the engine early
in 2024 will allow the apparatus to be delivered in 2026. The long build time is not specific to EV
fire trucks. Based on surveyed manufacturers, the building time for a traditional diesel truck
varied from 20 to 36 months.
The Rosenbauer RTX offers some unique features that will improve capabilities of the fire crew.
The engine is narrower and significantly lighter than our current engines. This will allow better
access down narrow urban streets especially in the winter. A lighter engine will result in less road
damage to side streets especially during springtime frost melting.
Due to the EV drive train, the RTX is equipped with all wheel drive and all wheel steering. The
advantages of all wheel drive are obvious in our winter environments. All wheel steering allows
the engine to turn around in almost half of the radius of our current engines. This will limit the
amount of backing of the fire engine in the streets. Backing of engines at scenes increases the risk
of damage and injury.
The EV drive train of the RTX will eliminate the introduction of diesel exhaust into our fire
stations. Diesel exhaust is a known carcinogen and eliminating its presence in the fire stations will
lower the risk of cancer for our firefighters.
4. Budget Source:
The fire engine requires a $50,000 down payment at the time of order. The cost will come from
the Fire Department’s CIP revolving equipment fund. The remaining funding mechanism will be
determined by the Finance Committee.
5. Recommendation:
I am recommending the City of Superior Fire Department enter a build contract with Rosenbauer
America for a RTX EV fire engine with the final funding mechanism determined by the Finance
Committee.
Approved:____________________________________ Date:__________________
Committee Chair Ledin
Denied:______________________________________ Date:__________________
Committee Chair Ledin
January 5, 2024
Battalion Chief Bob Zimmerman
Superior Fire Department
3326 Tower Avenue
Superior, WI 54880
Chief Zimmerman,
Re: Rosenbauer RTX Electric Fire Engine
Rosenbauer and General Safety Fire Apparatus would like to thank you for the opportunity to propose the
Rosenbauer RTX electric fire engine, showcasing these key features.
• One (1) Rosenbauer RTX Electric Pumper
• Rosenbauer NH-55 1500 GPM with pump and roll
• LCS 3.0 Pump Panel
• Volvo-Penta electric all-wheel-drive drivetrain
• Volvo-Penta dual 66 kWH (50 kWH usable) lithium batteries
• All-wheel steering with counter and crab steering
• Hendrickson Adjustable Suspension
• 500 Gallon water tank
• RM-35 Roof Turret
• Rosenbauer Variomatic foam system with 26-gallon foam cell
• Rear slide-in ladder compartment with NFPA ground ladder compliment
• 9” Extended Front Bumper
• (1) High Pressure Attack Line with 160’ of 3/4” hose on electric reel
• (3) Preconnected Speedlay discharges
• Whelen LED lighting package
• Full length roof compartments
• Rosenbauer storage solution including equipment mounting
• Motorola Radio VM5730 VHF Radio and Setcom LiberatorMax Intercom System
• $10,000 Loose Equipment Allowance
• Constructed in accordance with NFPA 1901
• 5-year warranty and service agreement
• 5 years of Rosenbauer Connected Fleet remote vehicle diagnostics.
A 50 KW DC Fast charger for your station has been included with this proposal. Superior Fire will
be responsible for any fire station infrastructure upgrades that need to be made.
Final vehicle details shall be determined at the pre-construction conference at Rosenbauer in
Leonding, Austria. There shall be an inspection of the vehicle prior to shipping from Leonding.
Final Assembly and equipment mounting will be performed at our factory in Wyoming, MN.
Travel, accommodation, and meals for six (6) fire department personnel to attend the pre-
shipping final inspection are included in the proposal.
RTX Price As Specified ……………..……………….……………………………………………………………………………………$1,857,202.00
Payment Terms
Slot Reservation - Due with 30 Days of Purchase Order ($50,000 )………………………………………..$50,000.00
After the Pre‐construction, production ready specs (30%) ~Approx April 1, 2024………………..$557,161.00
Pre-shipment payment after final inspection (40%) ~May 1, 2025……….…………………………$742,881.00
Final payment after upon delivery (Balance) ~ Q4 – 2025……………………………………………………$507,160.00
Total Contract Price $1,857,202.00
No local, state, or federal taxes are included. This quote is valid for 45 days from the date of this quote.
Optional Demo Discount
As a valued customer, the Superior Fire Department plays a vital role in our mission to revolutionize the firefighting
industry with our innovative RTX electric fire truck. We deeply appreciate your enthusiasm in showcasing this
cutting-edge technology to potential customers, enabling us to spread the advantages of this remarkable vehicle.
To express our gratitude for your collaborative spirit, we are pleased to offer an exclusive $20,000 discount on the
above mentioned contract price in exchange for allowing Rosenbauer to demonstrate your RTX for a period of 60
days prior to delivery. Thank you, Superior Fire Department, for being an invaluable partner, and we eagerly
anticipate the positive impact we will achieve together.
Delivery
RTX orders are processed through a slot reservation system, and the estimated delivery time is 18-22
months, subject to the completion of the pre-construction conference and configuration requirements.
The delivery timeline is dependent on the finalization of specifications, and the sooner the pre-
construction conference is completed, the quicker we can secure the next available production slot and
deliver the product. Based on a January 2024 purchase order, we anticipate a December 2025 delivery. A
more detailed timeline will be provided once the production ready specs are finalized.
The RTX currently involves a two-stage assembly process. Currently, the RTX is assembled at our factory in
Leonding, Austria, with final assembly taking place at our factory in Wyoming, Minnesota.
On behalf of Rosenbauer and General Safety Fire Apparatus, we would like to express our gratitude for
the confidence you have placed in us in the past. With its unparalleled efficiency, reliability, and
performance, the RTX represents a major step forward in firefighting technology. We believe that the RTX
is the best choice for Superior’s firefighting needs, and we look forward to working with you to bring this
remarkable piece of equipment to your community.
Sincerely,
Todd McBride, RTX Sales & Marketing Manager
Rosenbauer America
CC: Steve Harris
General Safety Fire Apparatus
PROPOSAL SPECIFICATIONS COMPARTMENT KEY
GR1 = L1 GR2 = R1
SUPERIOR FIRE DEPARTMENT GR3 = L2 GR4 = R2
Job# N/A / 1.4.24 GR5 = L3 GR6 = R3
GR7 = RR
QTY RTX OPTION CODE DESCRIPTION SHOP NOTES
1 GENERAL
1 CM91XA0021 RTX Revolutionary Technology
1 CM91XA0913 M913 RTX Advanced Driveline
2 Quality Standards
1 CM91XA1001 Quality Guidelines RBI
4 Warranty/Guarantee
1 CM91XS1001 Warranty general period 24 months after handover
1 CM91XS1011 Warranty for water tank and foam tank to 10 years after handover
6 Midterm Inspection
1 CM91XA3111 Mid-Term Inspection at Production Facility Plant 1 in Leonding (AUT)
5 Final Acceptance
1 CM91XA3711 Factory Acceptance Testing at Production Facility Plant 1 in Leonding (AUT)
ETO:
•Complete FMVSS and CMVSS compliance
1
•UL / ULC (NFPA) READY
CM91XA3761 UL certification at Rosenbauer, RMN Rosenbauer Minnesota (USA) •EPA Compliance
7 Vehicle Concept
8 Design
9 Painting and Corrosion Protection
1 CM91XD1021 Design RTX Vehicle colour RAL 3000 fire red ETO: PPG FDG 73539ALT Bright Red
1 CM91XD1122 Design RTX Lower parts (bumper, fender) RAL 3020 traffic red ETO: PPG FDG 73539ALT Bright Red
1 CM91XD2121 Design RTX Roof cover RAL 3000 fire red ETO: PPG FDG 73539ALT Bright Red
1 CN742-G501 Design RTX Roof gallery basic profile RAL 3000 fire red ETO: PPG FDG 73539ALT Bright Red
1 CN742-A501 Design RTX Roof gallery top profile RAL 3000 fire red ETO: PPG FDG 73539ALT Bright Red
1 CN742-D501 Design RTX Roof gallery Design inserts RAL 3000 fire red ETO: PPG FDG 73539ALT Bright Red
1 CN742-E001 Design RT Roof gallery Rear end cap RAL 9005 black
1 CM91XD2512 Design Warning light covers front left red
1 CM91XD2522 Design Warning light covers front right red
1 CN742-K002 Design Warning light covers rear left red
1 CN742-K005 Design Warning light covers rear right red
1 CM91XD3121 Design RTX Side rollershutter RAL 9006 white aluminium
1 CM91XD3311 Design RTX Side hosebed panel RAL 3000 fire red ETO: PPG FDG 73539ALT Bright Red
1 CM91XD3511 Design Rear rollershutter RAL 9006 white aluminium
1 CM91XD3621 Design RTX Rear light module RAL 3000 fire red ETO: PPG FDG 73539ALT Bright Red
1 CM91XD3631 Design RTX Panel side lower compartment rear RAL 3000 fire red ETO: PPG FDG 73539ALT Bright Red
1 CM91XD4023 Design RTX Front mask RAL 9005 jet black (matt)
1 CM91XD4032 Design RTX Front bezel with backlit lettering RED: "SUPERIOR"
1 CM91XD4998 Design according to customer requirement (acc to Rosenbauer color catalog) ETO: PPG FDG 73539ALT Bright Red
1 CM91XD5011 Design Chassis frame RAL 9005 jet black
1 CM91XD5111 Design Crew cabin door RAL 9005 jet black ETO: PPG FDG 73539ALT Bright Red
1 CM91XD5511 Preservation of the underside of the vehicle (underbody rust-proof protection)
1 CM91XD5811 Anti-slip coating for roof
1 CM91XD5812 Anti-slip coating for floors in GRT 1/2
1 CM91XD5911 Roof contour marking; NFPA, yellow, along roof surface area
298 Stickers
1 CM91XD7001 Rosenbauer design principles standard emblems
1 CM91XD7011 Rosenbauer R at crew cabin doors
1 CM91XD7621 Warning stickers at vehicles rear side; red/yellow colour, NFPA, Chevron vehicle rear
1 CM91XD7631 Warning stickers at doors inside; red/yellow colour, NFPA, Chevron
1 CM91XD7711 Protective film (splinter shield); applied on side windows front cabin doors
1 CM91XD7721 Protective film (splinter shield); applied on side windows crew cabin doors
1 CM91XD7731 Protective film (splinter shield); applied on side windows crew cabin windows
1 CM91XD7999 Vehicle design (stickers) external
10 Lettering
341 Special Lettering
1 CM91XA4101 Chassis number and factory plate
1 CM91XA4113 Warning and information signs in English
1 CM91XA4225 License plate bracket rear; 1-line, with LED white
11 Documentation
1 CM91XA5011 Documentation in English language
12 Operating Manual
1 CM91XA5021 Operating instructions (hardcopy)
1 CM91XA5022 Operating instructions (digital on central display)
13 Maintenance Manual
1 CM91XA5031 Maintenance manual (hardcopy)
14 Spare Parts List
1 CM91XA5041 Spare parts list (online)
15 Additional Documentation
16 Performance, Weights and Dimensions
1 CM91XA9001 Temperature range use/storage
1 CM91XA9012 Driving performance and range [Advanced Driveline]
1 CM91XA9100 Weights (total permissible weight)
1 CM91XA9213 Wheelbase 4,400 mm / 173.2 in
1 CM91XA9224 Vehicle length aprox. 8,200 mm / 322.8 in
1 CM91XA9231 Vehicle width aprox. 2,350 mm / 92.5 in
1 CM91XA9241 Vehicle height aprox. 2,900 mm / 114.2 in
1 CM91XA9263 Turning circle diameter with all wheel steering: approx. 14.5 m / 47.6 ft.
1 CM91XA9281 Ground clearance variable 175/250/350/470 mm
1 CM91XA9291 Water passage capability 500 mm
3 CHASSIS AND CAB
17 Chassis
18 Chassis - General
241 Frame and Frame components
1 CM91XF1101 Chassis frame
19 Engine
1 CM91XF1111 Drive system electric with two electric motors
1 CM91XF1121 Pump drive electric with electric motor and mechanical with diesel engine
1 CM91XF1131 Energy Backup System
1 CM91XF1212 Exhaust aftertreatment system Tier-4-final
303 High Voltage (HV) system
1 CM91XF3303 HV-battery package RTX Advanced Driveline
1 CM91XF3309 Battery management system (BMS)
1 CM91XF3313 Charging port; CCS-Combo Type1, LHS
1 CM91XF3322 Charging with DC 150kW, via Charging Station (direct current fast charging)
1 CM91XF3341 Charging with integrated energy backup system
20 Transmission
1 CM91XF1311 2-speed gearbox
1 CM91XF1321 Differential lock manual
240 PTO (Power Take-off)
1 CM91XF1411 Transfer gearbox without PTO hydraulic
21 Fuel Tank
1 CM91XF1511 Fuel tank 125 litres / 33 gal
1 CM91XF1512 Ad-blue tank 14 litres / 3.7 gal
57 Brakes
1 CM91XF1811 On Board Air Compressor System to maintain chassis air pressure
1 CM91XF1821 EBS electronic braking system
1 CM91XF1831 Disc brakes
1 CM91XF1832 Parking brake
1 CM91XF1833 Recuperation brake
242 Axles and suspension
1 CM91XF2011 Independent Suspension with air suspension
234 Wheels (rims and tires)
1 CM91XF2111 Tires front axle; 385/65 R22,5 road profile ETO: Provide tire model/tread pattern for approval
1 CM91XF2121 Tires rear axle; 385/65 R22,5 road profile ETO: Provide tire model/tread pattern for approval
1 CM91XF2212 Rim selection front axle; Alcoa 11,75x22,5 ET120 Aluminum dura-bright
1 CM91XF2222 Rim selection rear axle; Alcoa 11,75x22,5 ET120 Aluminum dura-bright
2 CM91XF2231 Spare wheel; in tire / rim combination as driving tires, supplied loose 1 ea side
1 CM91XF2252 Tire pressure control system - AirGuard Caps
212 Steering system
1 CM91XF2311 Left-hand drive (LHD)
1 CM91XF2321 FA steering system
1 CM91XF2331 RA-steering (for all-wheel steering and crab steering)
1 CM91XF2341 RA-steering setup; default off, situative (speed limit deactivation)
307 Assistance Systems
1 CM91XE6061 Driver Assistance Systems - Brake System (ABS, ESP, EPB, hill-assist)
121 Electrical system of chassis/vehicle
1 CM91XF3111 24V on-board electric with CAN-Bus System
1 CM91XF3121 Batteries for 24V on-board electric; 2x 12 V / 145 Ah
1 CM91XF3131 Electric battery master switch; with Ready-2-Run software
1 CM91XF3141 Mechanical battery disconnect switch
1 CM91XF3142 Undervoltage protection
1 CM91XF3143 Battery Monitoring
1 CM91XF3145 Battery indication lamp
71 Additional chassis options
1 CM91XF3522 Front bumper extended 9"
1 CM91XF3642 Tow eyes front; two (2) on bumper, front-side
1 CM91XF3643 Tow eyes front; two (2) on bumper, bottom-side
1 CM91XF3644 Tow eyes rear; two (2) on rear carrier profile end, bottom-side
1 CM91XF3821 Tailboard at the rear of the vehicle
1 CM91XF3915 Wheel chocks; 2x steel galvanized, incl. brackets in equipment locker, NFPA-version
235 Winch
58 Cab
65 Cab - General
1 CM91XF5011 Fully integrated cab
1 CM91XF5022 Interior trim in cab with roof hatch
1 CM91XF5031 Roof hatch in cab RMN tint
66 Seats
1 CM91XF5111 Crew of four (4) firefighters - (2+2+0)
1 CM91XF5211 Front seat layout 2x - (left driver/ right co-driver)
1 CM91XF5221 Cross seat layout 2x - (left 0+1 / right 0+1)
1 CM91XF5313 Driver seat, version Bostrom Sierra; with 3-point belt, w/o SCBA
1 CM91XF5326 Co-driver seat, version Bostrom Tanker; with 3-point belt, w/ SCBA, FMVSS
2 CM91XF5342 Cross seat version Bostrom; with 4-point belt, flip-up seat, w/ SCBA
1 CM91XF5511 Seat belts version Bostrom; with seat belts in orange
1 CM91XF5612 Seat embroidery version Bostrom; with Rosenbauer embroidery on headrest in red
1 CM91XF5711 Seat covers version Bostrom; with Clean-Cab vinyl
1 CM91XF5811 Seat occupancy detection, for Bostrom version seats
60 Brackets for breathing apparatus
1 CM91XF6411 SCBA bracket at cab rear wall DS up high inboard
63 Doors
1 CM91XF7111 Front cab doors as hinged doors
1 CM91XF7131 Crew cab doors as hinged doors
1 CM91XF7292 Radio key set for central locking system; 915 MHz
3 CM91XF7299 Radio key add-on for central locking system; 915 MHz
305 Mirror
1 CM91XF3231 Mirror replacement system with cameras; 2,35m LHD
64 Electrical appliances in cab
1 CM91XF7311 Combined air conditioning/heating system for cab (HVAC)
1 CM91XF7316 Auxiliary heater system for cabin (for cold land)
--- Dashboard Operation Switches
1 CM91XF9611 Rocker switch for hazard warning lights
1 CM91XF9612 Rocker switch for chassis-height control
1 CM91XF9613 Rocker switch for hill-assist
1 CM91XF9614 Rocker switch for acoustic warning signal
1 CM91XF9615 Rocker switch for fog horn
1 CM91XF9616 Rocker switch for RA steering; mode all wheel steering
1 CM91XF9617 Rocker switch for crew cabin powered windows
1 CM91XF9631 Steering wheel buttons for vehicle operation with symbols
--- Cabin Operation
1 CM91XF9711 Switch for crew cabin lighting LED
59 Additional cab options
1 CM91XF7331 Auxiliary air conditioner on cabin roof (for hot land) - roof AC
1 CM91XF7412 Windshield with window heater
1 CM91XF7421 Sun visor outside
1 CM91XF7422 Sun visor inside (roller blind)
--- Equipment stowage in cab
1 CM91XF8011 Actiontower next to cross-seat, left front
1 CM91XF8013 Actiontower next to cross-seat, right front
8 CM91XF8201 Shelf; cabin rear wall 8 total painted shelves to be determined at pre-con
2 CM91XF8221 Drawer for personal items
2 CM91XF8223 Mesh pocket for personal items
4 CM91XF8227 Cup holder
1 CM91XF8312 Cooling drawer at cab rear wall
61 Control panel for driving operation
1 CM91XF9111 Driver cluster display 10"
1 CM91XF9112 Indicator lights, in and next to driver cluster display
62 Control panel for vehicle operations in cab
1 CM91XF9121 Center display 15.6", touch display
1 CM91XF9122 Displays and controls on center display
1 CM91XF9211 Quick start buttons
1 CM91XF9411 Headlights flashing alternated (High- / Low Beam) "Wig-Wag"
1 CM91XF9511 Warning lights dimmable (day/night switching)
--- Display settings
1 CC598-L040 Display language in English USA
1 CC598-MU42 Display of speed in mph
1 CC598-MU02 Display of pressure in psi
1 CC598-MU12 Display of temperature in Fahrenheit
1 CC598-MU22 Display of rotational speed in RPM
1 CC598-MU33 Display of volume in US.liq.gal.
1 CC598-MU52 Display of flow in US.liq.gal./min
50 BODY
52 Body - General
1 CM91XB0001 Vehicle body
1 CM91XB0011 Vehicle body width aprox. 2,350 mm / 92.5 in
1 CM91XB0023 Vehicle rear in version long and low (American rear)
1 CM91XB0041 Roof hosebed storage bay, left; in version slim, short
1 CM91XB0044 Roof hosebed storage bays, right; in version slim, long
1 CM91XB0051 Roof cover for hosebed storage roof bay, left; in version slim, short
1 CM91XB0054 Roof cover for hosebed storage roof bay, right; in version slim, long
1 CM91XB3212 Hose bed divider, short
1 CM91XB4212 Hose bed divider, long RMN blitzfire preconnect see rogers folder
1 CM91XB3213 Hose bed tarp cover rear, left
1 CM91XB4213 Hose bed tarp cover rear, right
1 CM91XB0062 Roof front storage bay left; in version slim, long
1 CM91XB0063 Roof front storage bay right; in version slim, short
1 CM91XB0072 Roof cover for front storage bay, left; in version slim, long
1 CM91XB0073 Roof cover for front storage bay, right; in version slim, short
1 CM91XB0082 Ladder compartment left side; in version long
3 CM91XB0095 Cross compartment for crosslays 1x top; 2x bottom
--- Roof Access Rear
1 CM91XB0331 Roof access steps, on left vehicle side
1 CM91XB0332 Roof access steps, on right vehicle side ETO: ladder
--- Rear Corner
74 Compartments
1 CM91XB1001 Rosenbauer loading concept and mounting system
9 CM91XB1005 Roller shutter guard
--- Lockers
1 CM91XB0101 Central locking (CL), for lockers
1 CM91XB0112 Roller shutters manual for side lockers; (GR1 to GR6, 3 on each side, light-alloy), w/ CL
1 CM91XB0152 Roller shutter manual for rear locker; (GR7, light-alloy), w/ CL
75 Compartment 1
3 CM91XB1111 Shelf; LHS front locker (GR1a)
159 Lower Compartment 1
1 CM91XB1153 Pull-out tray; LHS front low locker (GRT1a)
76 Compartment 1/2
5 CM91XB1188 Crosslay hose-tray 10.75" x 21"; transv. front (GR1 and GR2) 1 top, 2 bottoms (match boulder X2BA219) + 2 extra for bottom
78 Compartment 2
3 CM91XB1211 Shelf; RHS front locker (GR2a)
161 Lower Compartment 2
1 CM91XB1252 Swing-out tray; RHS front low locker (GRT2a), rear inst.
1 CM91XB1253 Pull-out tray; RHS front low locker (GRT2a)
80 Compartment 3
1 CM91XB1311 Shelf; LHS centre locker (GR3)
81 Compartment 4
1 CM91XB1411 Shelf; RHS centre locker (GR4)
82 Compartment 5
1 CM91XB1511 Shelf; LHS rear locker (GR5)
83 Compartment 6
1 CM91XB1611 Shelf; RHS rear locker (GR6)
84 Compartment 7
1 CM91XB1701 Pull-out tray; rear locker (GR7)
1 CM91XB1711 Shelf; rear locker (GR7)
306 Roof Gallery
1 CM91XB0200 Mounting of roof gallery RT/RTX
1 CN742-B001 Roof gallery for body width 2.350mm
1 CN742-L004 Gallery length L=6851mm
51 Brackets for Equipment in Body
1 CM91XA3322 Equipment stowage at Rosenbauer, RMN Rosenbauer Minnesota (USA)
1 CM91XB2099 Basic preparation for external equipment stowage
53 Body Roof
55 Body roof, left side
56 Body roof, right side
54 Body roof, front
169 One-Man Mobile Hose Reel
233 WATER/FOAM TANKS
232 Water Tank
1 CM91XT1104 Water tank 1,900 L / 500 gal; short, medium one-sided right
--- Water Tank Specials
1 CM91XT2011 Visual water tank level indicator; on vehicle exterior, blue, LED
1 CM91XT2015 Visual water tank level indicator; activation with pump operation
1 CM91XT2031 Water tank drainage 1"
1 CM91XT2041 Water tank drainage; pneumatic valve
1 CM91XT2089 Water tank stop angle on core frame
139 Foam Tank
1 CM91XT3110 Foam tank 100 L / 26 gal; rear locker (GR7) - AT
--- Foam Tank Specials
1 CM91XT4012 Visual foam tank level indicator; on vehicle exterior, green, LED
1 CM91XT4015 Visual foam tank level indicator; activation with pump operation
1 CM91XT4031 Foam tank drainage underneath LHS rear locker (GR5)
1 CM91XT4036 Foam suction inlet underneath LHS rear locker (GR5)
1 CM91XT4041 Foam tank filling via Variomatic-pump
1 CM91XT4076 Foam pick-up hose, Storz 38; 2.5m long
135 FIRE FIGHTING SYSTEM
231 Water Pump
1 CM91XL0001 Truck-mounted fire pump
1 CM91XL0115 Pump NH55 according to NFPA-1901 UL150-1500; made of stainless steel
1 CM91XL0206 Pump test in vehicle according to; NFPA-1901, 1500 gpm
137 Foam Proportioning System
239 Z-Proportioner
143 High Pressure Foam Proportioning
136 FIXMIX
226 VARIOMATIC
CM91XL4011 Direct injection foam proportioning system; VARIOMATIC 12
CM91XL4012 Direct injection foam proportioning system; VARIOMATIC 24
1 CM91XL4013 Direct injection foam proportioning system; VARIOMATIC 48
4 CM91XL4112 Injection points, made of gunmetal
1 CM91XL4320 Multi-channel injection point, RHS front outlet
1 CM91XL4331 Multi-channel injection point; in connection line LP to HP for rear hose reel
1 CM91XL4361 Multi-channel injection point; in supply line to crosslays NW65, for crosslay top
1 CM91XL4362 Multi-channel injection point; in supply line to crosslays NW65, for crosslay bottom for dual bottom crosslay (together)
1 CM91XL4031 VARIOMATIC suction line; from foam tank 1
1 CM91XL4411 Foam tank 1 filling via VARIOMATIC
1 CM91XL4421 External suction line; for VARIOMATIC
1 CCA00-ST53 Coupling Storz 38; incl. blind cap, made of brass
1 CM91XL4071 Independent selection of proportioning rate; for each injection point
1 CM91XL4081 Training mode; for Variomatic
67 CAFS (Compressed Air Foam System)
185 Pump System
1 CM91XL6002 Pump system basic scope; version NFPA
1 CM91XL6011 Piston priming pump, pneumatic actuation
1 CM91XL6021 Central drainage system; electro-pneumatically
1 CM91XL6031 Pump overheating protection into the open air
1 CM91XL6041 Pump heating system, stage 1; pump thermoregulation (for cold land)
1 CM91XL6061 Pump & roll
1 CM91XL6081 RTX Emergency operation quick guide instructions, in LHS rear locker (GR5)
1 CM91XL6082 RT Pump emergency operation pneumatic; for main valves, in LHS rear locker (GR5)
184 Pump connections
1 CM91XL6102 Pipework; water pipes stainless steel, and foam pipes brass/stainless steel
238 Water tank suction line
1 CM91XL6112 Tank suction line, NW150; electro-pneumatic, stainless steel
128 External water suction line
69 Central water intake
ETO: Department is requesting a Trident AirMax air adjustable relief valve for the intake
1
CM91XL6141 Water intake rear double, 2x NW 150; electric, incl. pressure relief valves, stainless steel relief valves.
1 CM91XL6151 Sensor for inlet pressure; installed in suction line
--- Coupling system water intake
2 CM91XL6964 Adapter NH 6" male to NH 4" female; incl. blind cap, made of brass chrome-plated 6"NH to 4" storz
2 CCA00-NH61 Coupling NH 2 1/2" male in stainless steel incl. blind cap made of brass, chrome-plated
131 Water tank filling line, left side
133 Water tank filling line, right side
132 Water tank filling line, rear
1 CM91XL6164 Auxiliary tank filling line via water intake; branched off NW65 / 2,5", electro-pneumatically
134 Water tank filling line via pump
1 CM91XL6172 Pump to tank filling line; NW50 / 2" with orifice NW19 / 0,75", electro-pneumatically
213 Supply lines
1 CM91XL6212 LP line to front bumper; NW65 / 2,5", right foam
1 CM91XL6245 HP line, quick attack hose reel; NW25 / 1", rear locker (GR7), electro-pneumatic foam
1 CM91XL6262 LP line to roof turret; NW100 / 4", electric
1 CM91XL6272 LP line to pre-connected crosslays (3x); NW100 / 4" 1x Top (foam) + 2x bottom (foam)
1 CM91XL6281 LP line to pre-connected hosebed left; NW65 / 2,5" Outboard - left side!
165 Low pressure outlets, front
1 CM91XL6315 Low pressure outlet (1x), Front right, forward; NW65 / 2,5", c/w electric ball valve through front
166 Low pressure outlets, left side
1 CM91XL6426 Low pressure outlet (1x), LHS rear low locker (GRT5); front, NW65 / 2,5", c/w electric ball valve
1
CM91XL6428 Low pressure outlet add (1x), LHS rear low locker (GRT5); rear, NW65 / 2,5", c/w electric ball valve
168 Low pressure outlets, right side
1 CM91XL6526 Low pressure outlet (1x), RHS rear low locker (GRT6); front, NW80 / 3", c/w electric ball valve mount up and rear as standard
1
CM91XL6529 Low pressure outlet add (1x), RHS rear low locker (GRT6); rear, NW65 / 2,5", c/w electric ball valve
167 Low pressure outlets, rear
144 High pressure outlets, front
145 High pressure outlets, left side
146 High pressure outlets, right side
243 High pressure outlets, rear
--- Coupling system pressure outlets
1 CCA00-NH71 Coupling NH 4" male in stainless steel incl. blind cap made of brass, chrome-plated
8 CCA00-NH61 Coupling NH 2 1/2" male in stainless steel incl. blind cap made of brass, chrome-plated
1 CM91XL6971 Adapter NH 4" female to NH 2 1/2" male; incl. blind cap, made of brass chrome-plated 4" NH x Storz GR6 fwd discharge
1 CM91XL6973 Adapter NH 2 1/2" female to NH 1 1/2" male; incl. blind cap, made of brass chrome-plated
CM91XL6974 Adapter swivel coupling NH 2 1/2" female to NH 1 1/2" male, w/o cap, made of brass
1 CM91XL6975 Adapter swivel coupling NH 2 1/2" female to NH 2 1/2" male, w/o cap, made of brass top crosslay
2 CM91XL6976 Adapter swivel coupling NH 2 1/2" female to NH 1 3/4" male, w/o cap, made of brass bottom crosslays + front bumper
10 CM91XL6991 Pressure relief for outlet incl. HD Hose Reel - not possible
87 Pump Unit Control Panel
1 CC598-AS31 Installation in series RTX
1
CM91XL7051 Pump operation panel RTX (Display 10", Display 3,5", Digipot, 15-keypad); in left rear locker (GR5)
1 CM91XL7053 Touch function active; for Display 10"
1 CM91XL7111 Automatic water tank levelling
1 CM91XL7112 Automatic water tank levelling, automatic actuation
1 CM91XL7114 Active pressure monitoring at pressure discharges all discharges including roof turret, crosslays
--- Indicators display
1 CC598-MU02 Display of pressure in psi
1 CC598-MU12 Display of temperature in Fahrenheit
1 CC598-MU22 Display of rotational speed in rpm
1 CC598-MU33 Display of volume in US.liq.gal.
1 CC598-MU52 Display of flow in US.liq.gal./min
1 CC598-TH02 Colour scheme for media Green/Light Blue/Dark Blue/Purple
1 CC598-DV10 Display water tank level indication
1 CC598-DV15 Display foam tank level indication, tank 1
1 CC598-DV20 Display fuel tank level
1 CC598-DV22 Display battery voltage, for 24V system
1 CC598-DV24 Display battery level, for HV system
1 CC598-DV25 Display of engine temperature indication
1 CC598-DV26 Display of engine speed
1 CC598-DV30 Display of pump pressure governor screen
1 CC598-DV50 Display of pump pressure, XL; NFPA compliant
1 CC598-DV51 Display of pump inlet pressure, XL; NFPA compliant
1 CC598-DV52 Display of pump speed, numeric; NFPA compliant
1 CC598-DV40 Display of operating hours vehicle
1 CC598-DV43 Display of operating hours pump
--- Functions on Digipot
1 CC598-DP10 Push button for start water pump
1 CC598-DP15 Push button for stop water pump
1 CC598-DP30 Pump pressure governor
1 CC598-DP50 Proportioning rate adjustment
1 CC598-DP22 Key foam quick start left bottom
1 CC598-DP99 Key inlay blank Digipot as many as needed
--- Functions on keypad
1 CC598-KL20 Key vicinity illumination; (left, right, rear)
1 CC598-KL30 Key surrounding illumination maximum
1 CC598-KL31 Key surrounding illumination left
1 CC598-KL32 Key surrounding illumination right
1 CC598-KL33 Key surrounding illumination rear
1 CC598-KL34 Key surrounding illumination front
1 CC598-KV01 Key TDS flashing
1 CC598-KV05 Key TDS left
1 CC598-KV10 Key TDS right
1 CC598-KV15 Key TDS left/right
1 CC598-KM25 Key central lock
1 CC598-KM12 Key EVAC sequence to be determined
1 CC598-KE15 Key rear flashers
1 CC598-KM30 Key inlay blank as many as needed
194 Quick Attack Water/Foam
195 Quick attack water/foam in compartment 3
196 Quick attack water/foam in compartment 4
197 Quick attack water/foam in compartment 5
198 Quick attack water/foam in compartment 6
199 Quick attack water/foam in compartment 7
1 CM91XL8713 HP quick attack hose reel, rear locker (GR7); DN19 rubber-rigid hose, 50m
1 CM91XL8833 Foot pedal switch for hose reel winding
1 CM91XL8835 Crank handle for manual rewinding
1 CM91XL8851 Hose reel blow-out
1 CM91XL8862 HP NEPIRO ERGO, branch pipe
1 CM91XL8863 NEPIRO one-hand bracket, insert
1 CM91XL8864 Foam clamp-on tube, NEPIRO ERGO (NP or HP)
342 Quick attack water/foam Crosslay
1 CM91XL6351 Low pressure outlet (1x), Crosslay top; NW65 / 2,5", c/w electric ball valve
2 CM91XL6354 Low pressure outlets (2x), Crosslay bottom; NW65 / 2,5", c/w electric ball valve 2x bottom
343 Quick attack water/foam Hosebed
1 CM91XL6621 Low pressure outlet (1x), pre-connected hosebed left; NW65 / 2,5", c/w electric ball valve outboard- left side
222 Turret
219 Turret on cab roof
1 CM91XL9201 Installation roof turret RM35C; on cab roof
1 CM91XL9212 Roof turret RM35C; on cab roof, in RAL 3000 fire red ETO: PPG FDG 73539ALT Bright Red
218 Turret on bumper
--- Turret on bumper
1 CM91XL9313 Wireless Remote Control for turret operation
1 CM91XL9511 Joystick for turret operation 360 op through joystick - 28914B-001
122 ELECTRICS, PNEUMATICS
156 Lighting
290 Chassis Lighting
1 CM91XE0121 Vehicle light package; version FMVSS/CMVSS FMVSS
1 CM91XE0122 Cornering lights side, additional; on the side of the front bumper, bottom, WHITE
1 CM91XE0124 Contour lights rear, additional 3x [3905] on rear bottom on tailboard, RED
291 Cab Lighting
1 CM91XE0131 Crew cabin lighting LED direct white colour
1 CM91XE0132 Crew cabin lighting LED ambiente white colour
1 CM91XE0133 Crew cabin lighting LED ambiente red colour
1 CM91XE0140 Cabin floor safety lighting at doorways and crew compartment steps
1 CM91XE0142 Reading lamp on co-driver's side
1 CM91XE0145 Warning lamp; ready to drive, RED
292 Body Lighting
1 CM91XE0151 Compartment illumination from side at GR1-7
1 CM91XE0156 Compartment illumination in ladder compartment
1 CM91XE0159 Lighting in engine compartment
1 CM91XE0171 Lighting in roof hosebed storage bay
1 CM91XE0181 Lighting in roof front storage bay
293 Special Lighting
1 CM91XE0211 Front with surrounding illumination; on cab roof front, with 2x LED spotlights
1 CN742-U001 Roof gallery with side area lighting local, w/ 1 pc. LED-strip, L/H and R/H side
1 CN742-U002 Roof gallery with side area lighting long-range, w/ additional 2 pcs. LED-strip, L/H and R/H side
1 CM91XE0228 Surrounding field illumination, deactivated at speed limit
1 CM91XE0229 Surrounding field illumination, activated via reverse gear engaged
1 CM91XE0233 Rear with rear area lighting local; w/ 1 pc. LED-strip; version RTX
1 CM91XE0234 Rear with rear area lighting long-range; w/ additional 2 pcs. LED-strip; version RTX
1 CM91XE0345 Rooftop lighting mounted on the hosebed cover plate, short, right
1 CM91XE0348 Rooftop lighting mounted on the roof front storage bay cover plate, long, right
1 CM91XE0391 Rooftop lighting, switched via parking brake
1 CM91XE0423 Ground access lighting, integrated into crew door handles
1 CM91XE0424 Ground access lighting, in the area of crew compartment doors
1 CM91XE0513 Ground contour lighting, in the area of body compartments; american rear end ETO: PARKING BRAKE ACTIVATION REGARDLESS OF OTHER INPUTS
157 Light Tower
203 Remote control in cab
309 Remote control in body
227 Warning Devices
230 Warning lights all optional lights chosen and to be red
1 CM91XE1411 Warning lights Whelen front upper level; 1x [1202], in front roof center, centered, RED
1
CM91XE1422 Warning lights Whelen front upper level; 2x [1201+1203], in front roof center, off-center, WHITE
1 CM91XE1431 Warning lights Whelen front upper level; 2x [1103], on front roof corner cover, inner, left, RED
1 CM91XE1441 Warning lights Whelen front upper level; 2x [1107], on front roof corner cover, inner, right, RED
1 CM91XE1471 Warning lights Whelen front upper level; 2x [1101+1102], in front roof corner cover, left, RED
1 CM91XE1481 Warning lights Whelen front upper level; 2x [1108+1109], in front roof corner cover, right, RED
1 CM91XE1511 Warning lights Whelen front lower level; 1x [1501], above bezel, left Pos.A, RED
1 CM91XE1521 Warning lights Whelen front lower level; 1x [1509], above bezel, right Pos.B, RED
1 CM91XE1531 Warning lights Whelen front lower level; 1x [1701], below bezel, left Pos.1, RED
1 CM91XE1542 Warning lights Whelen front lower level; 1x [1702], below bezel, left Pos.2, WHITE
1 CM91XE1551 Warning lights Whelen front lower level; 1x [1703], below bezel, left Pos.3, RED
1 CM91XE1562 Warning lights Whelen front lower level; 1x [1704], below bezel, center Pos.4, WHITE
1 CM91XE1571 Warning lights Whelen front lower level; 1x [1705], below bezel, right Pos.5, RED
1 CM91XE1582 Warning lights Whelen front lower level; 1x [1706], below bezel, right Pos.6, WHITE
1 CM91XE1591 Warning lights Whelen front lower level; 1x [1707], below bezel, right Pos.7, RED
1 CM91XE1631 Warning lights Whelen side upper level; 1x [2102], in front roof corner cover, rear, left, RED
1 CM91XE1641 Warning lights Whelen side upper level; 1x [4102], in front roof corner cover, rear, right, RED
1 CN742-Z501 Warning lights Whelen side upper level 1x each side [2103/4103], at roof gallery profile, RED
Warning light strip in roof gallery 1x each side [2201/4201], LED strip, RED / RED (Left / Right)
1
CN742-S502
1 CN742-R501 Warning lights Whelen side upper level 2x [2108+2109], in roof rear corner cover, left, RED
1 CN742-R504 Warning lights Whelen side upper level 2x [4108+4109], in roof rear corner cover, right, RED
1 CM91XE1711 Warning lights Whelen side lower level; 1x each side [2901/4901], front bumper side, top, RED
1 CM91XE1721 Warning lights Whelen side lower level; 1x each side [2903/4903], behind front axle, RED
1 CM91XE1731 Warning lights Whelen side lower level; 1x each side [2904/4904], behind crew door, RED
1 CM91XE1741 Warning lights Whelen side lower level; 1x each side [2907/4907], in front of rear axle, RED
1
CM91XE1751 Warning lights Whelen side lower level; 1x each side [2909/4909], at rear light console side, RED
1 CN742-R507 Warning lights Whelen rear upper level 1x [3101], in roof rear corner cover, left, RED
1 CN742-R510 Warning lights Whelen rear upper level 1x [3109], in roof rear corner cover, right, RED
1 CM91XE1831 Warning lights Whelen rear upper level; 1x [3501], below hose bed, left, RED
1 CM91XE1841 Warning lights Whelen rear upper level; 1x [3509], below hose bed, right, RED
1 CM91XE1911 Warning lights Whelen rear lower level; 1x each side [3801+3809], above tailboard rear, RED
1 CN742-M001 All warning lights in the RTX roof gallery flash standard pattern 1
228 Acoustic warning
1 CM91XE2611 Acoustic warning device; airhorn Hadley e-Tone 24.5" (2x)
1 CM91XE2619 Air tank for acoustic alarm system airhorn
ETO: Federal Signal Pathfinder PF400Q /EQ2B. Preferabbly with (1) BP200Q Speaker
1
CM91XE2714 Acoustic warning device; WHELEN Sirene Amplifier 295SL + Speaker (2x)
2 CM91XE2811 Foot switch for acoustic warning device, LINEMASTER
216 Traffic guiding lights
1 CM91XE3121 Traffic Control System at vehicle rear side; version RTX
229 Additional warning device
1 CM91XE4111 AVAS (Acoustic vehicle alerting system)
1 CM91XE4122 Warning buzzer when reverse gear is engaged; ECCO
1 CM91XE4151 Traffic emitter light; FEDERAL Opticom ETO: Prewire only.
73 Communication
--- Radio
1 CM91XE5312 Radio basic preparation; for USA Install customer supplied readio
2 CM91XE5391 Radio antenna installation; provided
1 CM91XE5431 Loud speaker for radio, in cab interior headliner
--- Intercom
1 CM91XE5651 Intercom system preparation Install customre provided setcom wireless 4-pos (ea seat)
--- Music Radio
1 CM91XE5671 Music radio preparation (speakers)
1 CM91XE5682 Music radio FM/CD/USB/Bluetooth 24V
1 CM91XE5691 Music radio muting; by incoming radio message
68 Camera(s)
1 CM91XE6011 Rear View Camera
1 CM91XE6021 Birdview System 360°-camera
127 External Power Supplies
215 Telematics
1 CT200-6000 RDS Connected Fleet telematic module
1 CM91XE7222 Telematic add-on module 5G
--- Incident Management System
ETO: USB/C Powerpoint located at officer dash for installation of department supplied
1
CM91XE7291 Installation of a provided emergency data system, incl. antenna iPad.
--- Navigation
--- Vehicle Data Recorder
1 CM91XE7621 Vehicle data recorder (VDR); Hale Class 1
1 CM91XE7631 Seat monitoring Class1, display small (rocker) ETO: Integrate into central display. See Clemens.
120 Electrical Installations
2 CM91XE7711 12V charging socket, in drivers cab dashboard
3 CM91XE7713 USB double charging socket, in drivers cab dashboard Powerwerx USB/C (1 located in co-driver dash for iPad mount)
2 CM91XE7715 USB double charging socket, in crew cab Powerwerx USB/C - 1 ea action tower
pwr / gnd 4 - rear wall for future install of customer equipment,1 - officer dash for future
5
CM91XE7735 Mounting 12V-charger for other devices; Charger pocket provided equipment
--- Power Supply
1 CM91XE7112 Mounting of power supply unit 6kW
1 CM91XE7131 Power supply unit via HV system with inverter; 6kW US inverter, right
1 CM91XE7132 Power supply unit via HV system with inverter; 6kW US switch box, right
85 Compressed Air Supply and Connections
1 CM91XE7834 Compressed air outlet in GR 2
210 SERVICE
--- Service Package
294 Training
--- Special Requirements