Zoning Board of Appeals
Regular MeetingTroy, NY · October 2, 2024
Minutes
City of Troy Agenda
Zoning Board of Appeals October 2nd, 2024
Administrative Item
The adoption of the September 4th meeting minutes was postponed until November 6th meeting
due to a lack of a quorum of board members present.
New Business.
PLZBA 2024 0045 3075 Sixth Ave (90.70-3-1.4| 0.19 ac. | Two Family Residential |N -III
Use Variance - SEQR (Unlisted).
The applicant, David Downer, is proposing to use the above property, which previously received a
use variance for 14 apartments, as a homeless shelter for women, requiring a use variance.
• Applicant presentation. David Downer & Demeria Canty
• Board members deliberation and questions to applicant.
• Applicant response.
• Request for public comment: No public comment.
• LZ motioned for a Negative Declaration (SEQR) of this type II action, ZC seconded.
Absent Yes No Abstain Recused
Lindsay Zefting Yes
Stephen Miner Yes
Zachary Carhide Yes
Tamara Demartino Yes
Yvie Dondes X
• Motion for a Negative Declaration (SEQR) of this type II action passed 4-0.
• Findings of fact. LZ moved to approve the variance base on the following findings of facts:
o This is a reasonable and historic use of the property as a shelter.
o The property is uniquely positioned to be used as a shelter.
o The variance will not alter the character of the neighborhood.
o The alleged hardship is not self-created.
• LZ motioned to approve the use variance, SM seconded.
Absent Yes No Abstain Recused
Lindsay Zefting X
Stephen Miner X
Zachary Carhide X
Tamara Demartino X
Yvie Dondes X
• Motioned to approve the use variance passed 4-0.
Written by Angie Apindem Executive Secretary. For additional information, visit: https://www.troyny.gov/government/boards-
commissions/zoning-board-of-appeals/agenda-minutes/. As required by the Americans with Disabilities Act, auxiliary aids and services are
available upon request. Please give one-week advance notice for services needed.
Page 2 of 5
City of Troy Agenda
Zoning Board of Appeals October 2nd, 2024
New Business
PLZBA 2024 0037 75-81 Vandenburgh Ave (123.21-1-23.11|15.39ac |CC| N-3)
Area Variance – SEQRA (Type II).
The applicant, Ben Gingrich, on behalf of KeyBank, is proposing a new freestanding bank branch
adjacent to Market 32 in Troy. The project will have a lobby with banking services and a drive through
ATM with autoteller lane. The following variances are requested:
o The required maximum front setback is 10 ft; 124.6 ft is requested; relief of 114.6 ft is sought.
o The required maximum side back is 10 ft; 170.3 ft is proposed; relief of 160.3 ft is requested.
o A minimum of two stories is allowed; one story is proposed; relief of one story is requested.
o the code requires buildings to front the street directly; relief is sought to face the building entrance
south.
• Applicant presentation. Ben Gingrich
• Board members deliberation and questions to applicant.
• Applicant response:
• Public comment: Comment from Ms Philips: How will sewage and runoff from digging
be managed?
LZ responded that the zoning variances are not related to site plan review. The question
would be best answered during site plan review by the planning board.
The applicant responded that they plan to address potential runoff with a storm water
management plan.
• Findings of fact. LZ moved to approve the variance base on the following findings of facts:
o The variances will not create an undesirable change in the character of the
neighborhood, rather, it will fit the design of the neighborhood.
o The benefit cannot be achieved by some other feasible methods because of the
site and grades of the roadway
o The requested variance is not substantial while the numbers are large, it’s not
substantial relative to the site.
o The variance if granted will not have an adverse effect on the environmental
conditions of the neighborhood.
o The alleged difficulty is not self-created because its an existing shopping
plaza.
• Conditions: The variance granted to construct a single story is specifically for this
building’s footprints only.
Written by Angie Apindem Executive Secretary. For additional information, visit: https://www.troyny.gov/government/boards-
commissions/zoning-board-of-appeals/agenda-minutes/. As required by the Americans with Disabilities Act, auxiliary aids and services are
available upon request. Please give one-week advance notice for services needed.
Page 3 of 5
City of Troy Agenda
Zoning Board of Appeals October 2nd, 2024
• LZ Motion to approve area variance; TD seconded
Absent Yes No Abstain Recused
Lindsay Zefting Yes
Yvie Dondes Yes
Stehen Miner Yes
Zachary Carhide Yes
Tamara Demartino Yes
• Motion to approve area variance passed 4:0.
Old Business
PLZBA 2024 0022 125 River St (100.68-1-1. /1|3.23ac| DMU| Downtown II)
Area Variance -SEQRA (Type I).
The applicant, Taylor II LLC, is proposing to construct two new mixed-use buildings consisting of 308
residential units and 2,135 sf of ground-floor retail space. Each building will consist of a six-story building
built on top of a one-story parking structure. The following variances are requested for the project:
o Front side setback required is 0 ft min. – 10 ft max, 11.5 ft and 13.2 ft are proposed for building
2 and 3 respectively. Seeking relief of 1.5 ft and 3.2 ft for building 2 and 3 respectively.
o Side setback required is 0 ft min. – 10 ft max, 24.6 ft and 35 ft are proposed for building 2 and 3
respectively. Seeking relief of 14.6 ft and 25 ft for building 2 and 3 respectively.
o The applicant is seeking relief from ‘freestanding parking structures and surface parking lots
shall not be built adjacent to the river or any public pathway easement to provide parking
adjacent to the Hudson River. ‘
o The applicant is seeking relief from ‘buildings with four or more floors shall have a step back of
at least 10 feet on each floor above the third floor on the riverside to mitigate the visual impact
of buildings from the river.’
o The required building frontage is 80% min-100% max, 44.8% is proposed for building 3, relief of
35.2% is requested.
• Applicant presentation: Taylor II LLC
• Board members deliberation and questions to applicant.
• Applicant response:
• Public comment-
o Public comment from Russel Brookes was in opposition to the variances requested. He
stated that Pennrose could request the Department of Transportation (DOT) to waive
their easements, allowing them to construct the project as per their original proposal.
Public comment will be attached to meeting minutes.
Written by Angie Apindem Executive Secretary. For additional information, visit: https://www.troyny.gov/government/boards-
commissions/zoning-board-of-appeals/agenda-minutes/. As required by the Americans with Disabilities Act, auxiliary aids and services are
available upon request. Please give one-week advance notice for services needed.
Page 4 of 5
City of Troy Agenda
Zoning Board of Appeals October 2nd, 2024
• LZ motioned to table proposal to next month for more documentation and to allow new
members review project, SM seconded.
Absent Yes No Abstain Recused
Lindsay Zefting Yes
Yvie Dondes Yes
Stehen Miner Yes
Zachary Carhide Yes
Tamara Demartino Yes
• Motion to table passed, 4-0.
• SM motion to adjourn meeting at 8:25pm, ZC seconded.
Absent Yes No Abstain Recused
Lindsay Zefting Yes
Stephen Miner Yes
Yvie Dondes Yes
Tamara
Yes
Demartino
Zachary Carhide Yes
• Motion to adjourn meeting at 8:25pm passed, 4-0.
Written by Angie Apindem Executive Secretary. For additional information, visit: https://www.troyny.gov/government/boards-
commissions/zoning-board-of-appeals/agenda-minutes/. As required by the Americans with Disabilities Act, auxiliary aids and services are
available upon request. Please give one-week advance notice for services needed.
Page 5 of 5
Zoning Board of Appeals
433 River St., Ste. 5001
Troy, NY 12180
Public Mee ng - Wednesday, October 2, 2024
PLZBA 2024 0022 125 River St (100.68-1-1. /1|3.23ac| DMU| Downtown II)
Area Variance -SEQRA (Unlisted).
Why should Troy let Pennrose propose a project and then a er receiving community and
planning buy-in, change the project dras cally to make more money?
Brief Background of the Pennrose Taylor Apartments Reconstruc on Planning
A er the 2019 and 2020 community mee ngs and the ini al submission of their proposed plans
for all phases of the Taylor Apartments replacement, Pennrose showed up to the Planning
Commission in December of 2021 with a completely different proposal for Phase 1.
For a look at all the many community and resident mee ngs that took place in the development
of the ini al proposal for the redevelopment of the Taylor Apartments please follow the link
below and scroll to the end.
h ps://troyhousing.org/taylor-apartments-redevelopment/
At the Planning Commission mee ng Steve Strichman stated that Pennrose was not able to get
the alloca on of 9% LIHTCs that they applied for and would be looking to a different program
for government assistance. This new program requires that Phase 1 have 141 apartments (equal
in number to those being demolished for the new Phase 1 building) He went on to explain that
this would sa sfy the affordable housing requirements for the project and that Phase 2 would
be market rate housing.
Phase 1 is to be rented to tenants from the current Taylor 3 & 4 buildings. Phase 2 is now
proposed as a mix of affordable and “workforce housing”.
Please consider the following as they pertain to the five Variances requested:
The project is too large for the site especially given the Applicant is trying to design
around the ramps to the Congress Street bridge. The 1st, 2nd & 5th items dealing with
frontage and setbacks are a result of trying to fit the project between the ramps.
The project needs to slow down and go back to a design based upon the one developed
through many community and planning mee ngs. This plan was presented to the
Planning Commission in October 2020. A rendering from that applica on is a ached for
reference.
I have heard three reasons that the Applicant must design with the ramps remaining. All
are ques onable:
o The ramps are structural and can’t be removed.
Only a por on of the ramps are structural. The structural por on of the
ramps ends at the pylon where the structural steel ends. This needs to be
confirmed as part of the Congress Street Bridge Project. A Google Maps
photo of the site showing this is a ached.
o It is too costly to remove the ramps.
This can be incorporated into the Congress Street Bridge Project, which
now has funding and is going to final design. I assume that this is what
was planned in the October 2020 applica on.
o NYS DOT has a permanent easement on the ramps.
While this may be true, you can request the NYS DOT to declare the ramp
land surplus to their needs. This also can be done as part of the Congress
Street Bridge Project.
The Applicant is reques ng five variances. Gran ng any of these variances sets an
extremely bad precedent given the fact that the salt pile is finally being moved and
extensive development of the riverfront south of this site is in planning.
I request that the Zoning Board of Appeals recommend to the Applicant that they slow
down, and design based on the projected Congress Street Bridge Project.
With the ramps removed, the added land may allow the Project to be redesigned to be
in compliance with the Zoning Ordinance.
I do feel that the Project will s ll have too many units and will be difficult to meet the
Zoning/Parking requirements.
Building Step Back
The 4th Variance Request is for elimina on of the step back requirement for buildings on
the river of 4 or more stories in height.
This should not be granted as it sets a bad precedent for future development on the
river.
In a prior presenta on to the Planning Commission, they were asked why the needed
this variance and their reply was that they required the 308 apartments to make the
numbers work. This is a self-imposed hardship and not a valid reason for a variance.
Surface Parking Lots
The 3rd Variance Request is for relief from the requirement that surface parking lots can
not be built adjacent to the river or any public pathway easement
This should not be granted as it sets a bad precedent for future development on the
river.
Parking
Since this larger Taylor Phase 1 building le inadequate parking for Phase 1, Pennrose promised
to construct 40 parking spaces in Phase 2 for Phase 1 residents.
Phase 2 as now proposed has 308 apartments with 123 paved parking spaces and 27 banked
parking spaces (green space that will be paved if parking is required for the commercial spaces
on the first floor)
Of these 123 parking spaces, 40 are reserved for the Taylor Phase 1 building currently under
construc on. The remaining 83 spaces will be for the Phase 2 apartments.
To recap:
Taylor Phase 1:
o 141 apartments (244 bedrooms)
o 38 parking spaces plus 40 more when Taylor 2 is complete
.55 parking spaces per apt (.32 parking spaces per bedroom)
Taylor Phase 2 (proposed)
o 308 apartments (554 bedrooms)
o 83 parking spaces
o .27 parking spaces per apartment (.15 parking spaces per bedroom)
Taylor 3 & 4 (current buildings to be demolished for Taylor Phase 2)
o 125 apartments
o 88 parking spaces
.70 parking spaces per apartment
Workforce housing tenants, 183 of the proposed apartments in Taylor Phase 2, will mostly have
cars, so how can you jus fy only .27 parking spots per apartment?
In Conclusion
Why must Taylor Phase 2 be so big?
o It is proposed as 308 apartments replacing 125 apartments.
What is the rush to finalize a design when a major project going through the middle of
their site is about to be finalized?
If the reason is that there are financing deadlines to meet, then this is a self-imposed
hardship and not a valid reason for a zoning variance.
Respec ully submi ed
Russell Brooks
37 1st Street
Troy, NY 12180
(518) 421-8194
rbrooks5147@gmail.com
By access or receipt, the User acknowledges, covenants and agrees that the documents, provided by Dattner Architects D.P.C., including but not limited to plans and specifications, in any media (the "Documents"), are copyrighted instruments of professional service. The User agrees that the Documents may not be used for any other project or for any use not expressly authorized in writing by Dattner Architects. The User further agrees that Dattner Architects
shall have no responsibility or liability in connection with the unauthorized use, reuse, change or modification of the Documents in any manner by the User or any other party accessing the Documents. No representation is made by Dattner Architects as to the accuracy or scale of the Documents or that they reflect actual conditions. Use of the Documents is at the sole risk of the User or any other party accessing the Documents. The User and any other party
accessing the Documents shall, to the fullest extent permitted by law, defend, indemnify and hold harmless Dattner Architects, its principals, consultants, agents and/or employees from and against any and all claims, liabilities, damages, losses, judgments, costs and expenses, including attorney's fees and related expenses, that may be incurred by Dattner Architects, its principals, consultants, agents and/or employees as a result of any and all unauthorized
changes to or use of the Documents, including but not limited to any alteration to, modification of, deviation from, use as Shop Drawings, or additions to the Documents. Under no circumstances shall the transfer of the Documents and/or other instruments of service on or by electronic media be deemed a sale by Dattner Architects and Dattner Architects makes no warranties, either express or implied, as to their merchantability and fitness for any particular purpose.
Plotted: 10/8/2020 2:02:08 PM C B A
1 1
Revitalize Riverside: Phase 1
Phase 2 as originally planned and
presented during the community
2 2
forums
Phase 1 as originally proposed
before being changed to the 7-story
3 3
building currently under construction.
Phase 3 as originally planned
and presented during the
4 4
community forums
October 08, 2020 SD Submission
Date
I, I
Scale
547 River Street WRT 143 Main Street
Drawn By Key Plan 125 River Street
1 of
Sheet No.: Project No. Revisions: DR Pilla 1301 N 31st Street
Checked By 31-15 14th Street
Key Plan: Civil Engineers 1700 Market Street, Suite 2800
Troy, NY 12180
Taylor I, LLC
Nyack, NY 10960
-
Structural Engineers
Troy, NY 12180
Landscape Architects
-
Philadelphia, PA 19121
- Long Island City, NY 11106
Issue: SD Submission
-
Skyline Engineering Dattner Architects
Tax Map ID: 100.68-1-1./1 Revitalize Riverside:
Philadelphia, PA 19103
Cover Sheet
10/08/20
© 2020 Dattner Architects D.P.C.
2006 DA DA -
The Chazen Companies
-
-
RIVER STREET
Seal
Mechanical/Electrical/Plumbing Engineers
FIRST STREET ALLEY
- tel 212 247 2660
1385 Broadway, 15th Floor
- www.dattner.com
-
I
I 7
_ _ _ _ _ _ _ _ _ __J
,·1·-
._v I
New York, NY 10018
N µ, '1
T-001.00 Phase 1
This portion of
North ramp up to
structural point can Structural portion
be removed of ramps end here This portion of South ramp up
to structural point can be
removed
Revitalize Riverside
Taylor I & II Update
1. How We Got Here – Community Engagement Process
2. Overall Schedule Update
3. Taylor I Updates
4. RFP Design Assumptions & Updates
5. Taylor II Conceptual Design
6. Taylor II – Project & Unit Amenities
7. Taylor II – Zoning Variances
8. Future Resident Income Restrictions
1
How We Got Here: Engagement Process Recap
May 2019
Nov. 2019 – June 2024
Release of Request for Qualifications (RFQ)
seeking qualified developers to partner with
11 THA + Taylor Resident
them in the redevelopment of the Taylor Engagement Meetings
Apartments.
Feb. 2020 – October 2021
October 2019 4 Community Engagement Meetings
THA+TLDC selected the Pennrose-led to arrive at Master Plan
development team as their partner to
redevelop the Taylor Apartments.
June 2024: 4th Community Meeting
Phase 1 update, Phase 2
presentation
2
WHAT WE HEARD FROM YOU - WORKSHOPS
3
TAYLOR APARTMENTS – PROJECT SCHEDULE
Construction Fully Leased
We are Complete Spring ‘25
here Fall ’24
Taylor I
HUD Conditional Construction Construction
Approval Entitlements Completion
1Q’24 – 3Q’24 Start
1Q‘24 Q2 ’25 Q2 ’27
DESIGN
Taylor II
HFA HUD Final Relocation Financial Fully Leased
Applications Approval Taylor 3 + 4 Closing Q4 ’27
3Q’24 3Q ‘24 Fall - Winter ‘24 Q2 ’25
4
Taylor I – Project Overview
• 141 Units.
• 2,500 SF of ground floor Retail
• Full Amenity Package: Fitness,
Community Room, Playground,
Storage, Roof Terrace.
• First Priority to the 103 residents
of Taylor 3 and 4.
• Even if all Taylor tenants move in,
there are still 38 units available
for tenant earning up to 50% of
the area median income.
5
Taylor I – Status Update
• 65% Construction Completion.
• Substantial Completion by Fall
2024.
• 100% Occupancy by Spring
2025.
• Proposed Commercial Tenants:
• Troy Housing Authority
Office: Housing services.
• UPS Store: parcel
assistance, printing,
consulting.
6
RFP PLAN - DESIGN & KEY ASSUMPTIONS
• Larger Site, resulting from
the demolition of bridge
infrastructure and retaining
walls and reconfiguration of
the intersection.
• Leveled grade along River
Street enabling a
continuous retail profile
through Division Street.
• Taylor 3 and 4 replacement
units less that the existing
amount.
7
NO RAMP DEMOLITION – DESIGN & KEY ASSUMPTIONS
• Bridge infrastructure and retaining walls will not be demolished. This infrastructure reduces
the buildable area of the site constraining the future building footprint (i.e., smaller footprint
than RFP ).
• HUD requires the 1:1 replacement the existing 125 THA units.
8
TAYLOR APARTMENTS – MASTER PLAN
Taylor I 141 Units 150k SF
Taylor II 308 Units 385k SF
Taylor I v
Taylor II Taylor II
9
Taylor II Aerial Rendering – Updated Conceptual Design
10
Taylor II – Project Overview
Congress Street
River Street
Division Street
Front Street
11
Taylor II – Project Overview
River Street
Congress Street
New
Playground
Resident Courtyard -
Streetscape
Interior Amenity Space
Off-Street Parking
Units 143
Retail 2,100
12
13
Taylor II – Project Overview
New
Playground
Division Street
Resident Courtyard
Streetscape
Interior Amenity
Space
Off-Street Parking
Units 165
Front Street
14
15
UNIT FEATURES
• Washer/dryers in all units
• Central air conditioning
• Open floor plans
• Efficient layouts
• Ample storage
• Accessibility features incorporated
• Thermostatic controls
• Dishwashers
*Example Pennrose Apartments
16
Taylor II – Entitlements
Zoning Variances
Setback Relief
• Proposed setbacks are a result of DOT
and sewer easements on the site.
Step-back Relief:
• Primary façade is setback from Front
Street maximizing viewshed protection
from Hudson.
• Proposed massing also protects
viewshed from the city out towards
Hudson.
• Setback / footprint provides riverfront-
view amenity for more residents of
Taylor II
Use Relief:
• Open Surface parking provided to satisfy
tenant demand aiming to prevent street
overflow with cars from residents.
• Green banked parking
17
Taylor II – Units and Tenant Income
Purpose: Accommodate a range of household income levels and match rents
Example: Veteran
Searching for a job
Salary: $10-15K annually
Rent: $194 per month
Units Income
Example: Couple with Child
125* 30% - 50% AMI $743 - $1,114 Part time Cashier ($15/hr) + Full Time
125 60-80% AMI $1,263 - $2,236 Service Tech.
58 90% - 110% AMI** $1,800 - $2,400
Salary: $75K annually
Rent: $1,910 per month (2 bedroom)
Example: Working Professional
*Amount required by HUD Emergency Room Registered Nurse
Salary: $84K annually
Rent: $1,800 per month (1 bedroom)
18
Q&A
19
Agenda
Carmella Mantello Randy Coburn
Mayor Commissioner of Planning
Phone: 518-279-7166
Seamus Donnelly Randy.Coburn@troyny.gov
Deputy Mayor
Zoning Board of Appeals
433 River St., Ste. 5001
Troy, New York 12180
NOTICE OF PUBLIC MEETING
Notice is hereby given that the Zoning Board of Appeals of the City of Troy, New York, will conduct a public
meeting at 6:00 P.M. on Wednesday October 2nd, 2024, in City Council Chambers, 5th Floor, City Hall,
433 River Street, to hear and decide on the proposals listed below.
The City of Troy Zoning Board of Appeals will be conducting in-person meetings, however members of the
public may attend and participate virtually.
Members of the public are encouraged to submit comments prior to the meeting via email or in-person
during the public comment period. All written public comment should be directed to
zoningboard@troyny.gov at least six (6) hours prior to the meeting. No other email address is monitored
for public comment.
Administrative Items
Adoption of Meeting Minutes from September 4th by Resolution
New Business
PLZBA 2024 0045 3075 Sixth Ave (90.70-3-1.4| 0.19 ac. | Two Family Residential |N -III
Use Variance - SEQR (Unlisted).
The applicant, David Downer, is proposing to use the above property, which previously received
a use variance for 14 apartments, as a homeless shelter for women, requiring a use variance.
Old Business
PLZBA 2024 0037 75-81 Vandenburgh Ave (123.21-1-23.11|15.39ac |CC| N-3)
Area Variance – SEQRA (Type II).
The applicant, Ben Gingrich, on behalf of KeyBank, is proposing a new freestanding bank branch
adjacent to Market 32 in Troy. The project will have a lobby with banking services and a drive through
ATM with autoteller lane. The following variances are requested:
o The required maximum front setback is 10 ft; 124.6 ft is requested; relief of 114.6 ft is sought.
o The required maximum side back is 10 ft; 170.3 ft is proposed; relief of 160.3 ft is requested.
o A minimum of two stories is allowed; one story is proposed; relief of one story is requested.
o The code requires buildings to front the street directly; relief is sought to face the building
entrance south.
Written by Angie Apindem Executive Secretary. For additional information, visit: https://www.troyny.gov/government/boards-
commissions/zoning-board-of-appeals/agenda-minutes/. As required by the Americans with Disabilities Act, auxiliary aids and services are
available upon request. Please give one-week advance notice for services needed.
Page 1 of 2
City of Troy Agenda, September 4th, 2024
Zoning Board of Appeals
PLZBA 2024 0022 125 River St (100.68-1-1. /1|3.23ac| DMU| Downtown II)
Area Variance -SEQRA (Type I).
The applicant, Taylor II LLC, is proposing to construct two new mixed-use buildings consisting of 308
residential units and 2,135 sf of ground-floor retail space. Each building will consist of a six-story building
built on top of a one-story parking structure. The following variances are requested for the project:
o Front side setback required is 0 ft min. – 10 ft max, 11.5 ft and 13.2 ft are proposed for building
2 and 3 respectively. Seeking relief of 1.5 ft and 3.2 ft for building 2 and 3 respectively.
o Side setback required is 0 ft min. – 10 ft max, 24.6 ft and 35 ft are proposed for building 2 and 3
respectively. Seeking relief of 14.6 ft and 25 ft for building 2 and 3 respectively.
o The applicant is seeking relief from ‘freestanding parking structures and surface parking lots
shall not be built adjacent to the river or any public pathway easement to provide parking
adjacent to the Hudson River. ‘
o The applicant is seeking relief from ‘buildings with four or more floors shall have a step back of
at least 10 feet on each floor above the third floor on the riverside to mitigate the visual impact
of buildings from the river.’
o The required building frontage is 80% min-100% max, 44.8% is proposed for building 3, relief of
35.2% is requested.
Zoning Terms
DMU=Downtown Mixed Use
DT = Downtown
MF = Multi-family
MU = Mixed Use
SF = Single Family
N = Neighborhood
C-I = Campus – Institutional
C/C = Civic/Campus
Written by Angie Apindem Executive Secretary. For additional information, visit: https://www.troyny.gov/government/boards-
commissions/zoning-board-of-appeals/agenda-minutes/. As required by the Americans with Disabilities Act, auxiliary aids and services are
available upon request. Please give one-week advance notice for services needed.
Page 2 of 2