Planning Commission
Regular MeetingTumwater, WA · June 27, 2023
Minutes
TUMWATER PLANNING COMMISSION
MINUTES OF HYBRID MEETING
June 27, 2023 Page 1
CONVENE: 7:00 p.m.
PRESENT: Planning Commission Chair Elizabeth Robbins and Commissioners
Grace Edwards, Meghan Sullivan, Michael Tobias, Anthony Varela,
and Kelly Von Holtz.
Excused: Commissioners Terry Kirkpatrick and Brian Schumacher.
Staff: Planning Manager Brad Medrud and Housing and Land Use
Planner Erika Smith-Erikson.
CHANGES TO There were no changes to the agenda.
AGENDA:
APPROVAL OF
MINUTES:
PLANNING
COMMISSION
FEBRUARY 28, 2023:
PLANNING
COMMISSION MARCH
14, 2023:
JOINT PLANNING
COMMISSION - TREE
BOARD MAY 9, 2023:
MOTION: Commissioner Tobias moved, seconded by Commissioner
Edwards, to approve the minutes of February 28, 2023, March
14, 2023, and May 9, 2023 as published. A voice vote approved
the motion unanimously.
COMMISSIONER’S Commissioner Tobias said he is unable to attend the July 25, 2023
REPORTS: meeting because he will be on vacation.
Chair Robbins commented positively on the City’s new logo.
Manager Medrud said the new logo was approved several months
ago. The City is transitioning to the logo. The City is also scheduled
to publish its new website within the next month.
Commissioner Edwards referred to upcoming 4th of July City
activities and fireworks show.
MANAGER’S Manager Medrud shared that the City is working on some internal
REPORT: matters that will affect the work of the Commission. He anticipates
TUMWATER PLANNING COMMISSION
MINUTES OF HYBRID MEETING
June 27, 2023 Page 2
sharing some updates with the Commission in the next several days.
New City Administrator Lisa Parks recently joined the City.
PUBLIC There were no public comments
COMMENT:
PRELIMINARY Planner Smith-Erikson reported City staff and the community
DOCKET FOR 2023 provided feedback on proposed minor housekeeping amendments to
ANNUAL the Tumwater Municipal Code (TMC). The proposed amendments
HOUSEKEEPING are minor corrections to the City’s development regulations and do
AMENDMENTS: not require individual ordinances.
TMC 18.60.025(A) establishes a process for the amendments similar
to process for annual Comprehensive Plan amendments. The
Commission reviews the preliminary docket of proposed
amendments and forwards a recommendation to the City Council on
amendments to include within the final docket. Following the
Council’s approval of the final docket, staff prepares an ordinance
for consideration by the Commission and the City Council later in
the fall.
The four proposed amendments include:
A. Manufactured Home Parks Required Open Space: The
amendment clarifies open space requirements for mobile
home parks that are exempt from divisions of land. The
proposed language is not included in current park and open
space areas standards for development without divisions of
land.
B. Undergrounding Utilities Requirements: The amendment
clarifies that new and existing utilities shall be installed
underground and establishes an appeal process through the
Engineering Services Manager
C. Town Center Mixed Use Subdistrict First Floor Uses:
The amendment clarifies uses allowed on the first floor of
commercial and residential development along main streets
in the Town Center Mixed Use Subdistrict. The current code
is unclear as to the allowed uses.
D. Building Heights Over Sixty-Five Feet for Specific
Industrial Uses: The amendment establishes a conditional
use permit process in the Light Industrial and Heavy
Industrial zoning districts for certain uses exceeding 65 feet
in height.
Commissioner Tobias asked whether Tumwater has a maximum
building height limit in the City. Manager Medrud said the
TUMWATER PLANNING COMMISSION
MINUTES OF HYBRID MEETING
June 27, 2023 Page 3
maximum building height allowed in the City is in the Brewery
District of 85 feet. The airport has imposed height limits in some
areas; however, the City has not exceeded the height of 85 feet.
Building height will likely be a discussion topic as part of the
Comprehensive Plan Update.
Planner Smith-Erikson reported next steps in the process include a
worksession on July 25, 2023. The General Government Committee
is scheduled to receive a briefing on the preliminary docket on
August 9, 2023. The City Council will consider the preliminary
docket at its September 5, 2023 meeting.
Manager Medrud added that the Commission has the option of
cancelling the worksession and forwarding a recommendation to the
General Government Committee on the preliminary docket. Code
language for each amendment will be included in the final docket.
Dependent upon the timing for determining the final docket, the
schedule includes a briefing to the Commission on October 24, 2023
followed by a worksession on November 14, 2023 and a public
hearing on November 28, 2023. The Council is scheduled to
consider the final docket at its February 6, 2024 meeting.
Commissioners and staff discussed changing the timing of the
review process for the proposed amendments.
MOTION: Commissioner Tobias moved, seconded by Commissioner
Varela, to defer a recommendation (worksession) to the General
Government Committee on the Preliminary Docket for 2023
Annual Housekeeping Amendments to the July 11, 2023 meeting
to enable all Commissioners to have an opportunity to review
the docket. A voice vote approved the motion unanimously.
2025 COMPREHENSIVE Planner Smith-Erickson reported that following meetings with staff,
PLAN PERIODIC staff selected a slogan for the Comprehensive Plan Update of
UPDATE PROCESS – Balancing Nature and Community: Tumwater's Path to Sustainable
COMMUNITY Growth.
ENGAGEMENT PLAN:
The City is required to conduct a periodic update of its
Comprehensive Plan and development regulations to ensure it
complies with the Growth Management Act (GMA). The last
update was completed in 2016. The Plan and development
regulations will be updated to reflect the community’s vision and the
state’s requirements for the Comprehensive Plan and related
development regulations. The Legislature passed a new law
changing the periodic update from eight years to ten years following
this update cycle. The next update is scheduled in 2035 with a
progress report required in 2030. The updated Comprehensive Plan
TUMWATER PLANNING COMMISSION
MINUTES OF HYBRID MEETING
June 27, 2023 Page 4
will address diversity, equity, and inclusion throughout the plan and
incorporate climate mitigation, adaptation, and sustainability goals.
The GMA requires jurisdictions to use a 20-year population
projection provided by the Washington State Office of Financial
Management (OFM). The projections are developed every five
years.
Chair Robbins asked about the requirements for submittal of the
progress report in 2030. Manager Medrud said staff is reviewing the
new requirements; however, staff believes the report will be
forwarded to the Department of Commerce, which will likely
provide information on the report format and required content.
Planner Smith-Erickson reported state law requires each city and
county to establish a public participation program for revisions to
comprehensive plans and development regulations. The engagement
plan assists the City in establishing efforts to engage the community
and stakeholders throughout the update using the IAP2 (International
Association for Public Participation) process. The process uses a
spectrum of public participation and five levels of engagement of
inform, consult, involve, collaborate, and empower. Based on a
preliminary meeting with Communications staff, the public
engagement plan will focus on involvement and collaboration
through workshops, polling, citizen advisory committees, focus
groups, surveys, and public meetings. Community engagement
practices create a means for participatory local democracy by giving
members of the public an opportunity to become directly involved in
guiding policy decisions that will shape the future of their
community.
The City’s ten Community Engagement Goals are:
1. Provide information to enhance community understanding of
issues.
2. Seek early and continuous involvement from people who
care about the Plan and the community.
3. Offer opportunities for the community to provide feedback to
staff and to appointed and elected officials.
4. Develop an accessible, equitable, and engaging Plan.
5. Make community‐driven planning the priority.
6. Highlight projects implemented since the last Comprehensive
Plan periodic update.
7. Use a flexible, phased approach.
8. Integrate and consolidate goals from all Elements of the Plan
and resource Plans.
9. Develop a Comprehensive Plan that is in an easy to read and
in an understandable format.
TUMWATER PLANNING COMMISSION
MINUTES OF HYBRID MEETING
June 27, 2023 Page 5
10. Rely on multiple communications strategies, tactics, and
platforms to share information.
Commissioner Varela asked whether staff has identified specific
metrics tied to the engagement goals. Manager Medrud said that
primarily, staff will rely on opportunities. Unless the City sponsors a
scientific survey that is time-consuming and expensive, it is very
difficult to measure outreach efforts. Much of the participation can
be contributed to specific topics. Topics can generate both positive
and negative responses for participating especially if the issue is
sensitive versus topics that typically would be perceived as not
affecting the community. The important factor is ensuring the City
provides opportunities to ensure the community is aware of the
update and the issues.
Planner Smith-Erickson added that the Comprehensive Plan includes
11 different elements and staff will review each element to help
inform the public on how each element may affect the community
and why the public should become involved.
Chair Robbins asked about the possibility of considering a
continuous outreach process because of the lag in time between the
periodic updates by utilizing different communication vehicles such
as the City’s webpage or social media presence. Manager Medrud
commented on the importance of tying the update into all other work
products completed over the last 10 years. It will be important that
the public process incorporates other projects and plans. He agreed
to incorporate more frequent contact points or other outreach efforts.
The process could also consider the possibility of an annual reporting
process recognizing that it would not be a legal requirement.
Planner Smith-Erickson reported the community engagement process
will be flexible and may be altered to take advantage of events and
opportunities that could arise. Public hearings, worksessions, and
briefings will follow state law and Tumwater Municipal Code
requirements for public notification. A list of initial proposed
stakeholders and stakeholder groups are identified in Appendix A
within the staff report. The Commission previously offered
suggestions on stakeholders. Staff worked with Communications
staff to update the list. Throughout the public process, staff will use
the IAP2 process to identify target audiences and stakeholders. Staff
will also utilize an email contact list, a personalized Update webpage,
social media, surveys, news releases, and open houses.
Planner Smith-Erickson identified the 11 Elements of the
Comprehensive Plan:
TUMWATER PLANNING COMMISSION
MINUTES OF HYBRID MEETING
June 27, 2023 Page 6
Capital Facilities Plan
Conservation Plan
Economic Development Plan
Housing
Tumwater-Thurston County Joint Plan
Land Use
Lands for Public Purposes
Parks, Recreation and Open Space
Shoreline Master Program
Transportation
Utilities
Each element might require different levels of public participation
based on state law and feedback from the community.
Manager Medrud added that the Housing, Transportation, and Land
Use Elements would likely receive the most attention as they serve as
the core of the update. The Parks, Recreation and Open Space
Element will likely be deferred for a future update. Staff plans to
update the Economic Development Plan. It is likely the Shoreline
Master Program will not be updated as the Program was recently
updated.
Planner Smith-Erickson reviewed public outreach tools:
Staff will maintain an email contact list of interested members
of the community and stakeholders to receive notification of
key meetings and other information related to the update
process. The City’s established email list will also be used to
communicate with stakeholders. Staff is working with
Communications staff to develop a QR code for easy access
to the Comprehensive Plan Update webpage.
Staff will present information on the update process and
community engagement effort during City Council and
Planning Commission meetings throughout the periodic
update. The community will be notified of key meetings and
open houses via the periodic update webpage, social media,
Tumwater On-Tap e-newsletter, and City email contact list.
Online surveys will be available on the periodic update
webpage during 2023 to assess community priorities. The
visions, goals, and policies in the existing Comprehensive
Plan will serve as a starting point when developing survey
questions. Staff will recreate a survey that was mailed out in
2017. The “Share your vision for Tumwater” will be an
online platform with a selective mailing list. City staff will
take the lead in its development. Community members will
TUMWATER PLANNING COMMISSION
MINUTES OF HYBRID MEETING
June 27, 2023 Page 7
be notified of surveys via email, the periodic update webpage,
the City’s social media platforms, and other means.
Commissioner Edwards asked about other methods of outreach rather
than only through electronic venues. Manager Medrud advised that
staff is exploring options for those in the community lacking
electronic access, such as scheduling some informal meetings
throughout the community.
All materials associated with the periodic update will be
posted on the periodic update webpage located on the City’s
website. The webpage will include a list of frequently asked
questions, Comprehensive Plan Update background and
summary, and meeting information. New proposals to the
update webpage include a staff introduction section, an
interactive map of meeting location and times, and visuals.
Updates and notice of community meetings will be posted on
the City social media platforms. Staff will work with
community partners to share updates and surveys. The City
will issue news releases to advertise surveys, key open
houses, and other important information.
Open houses enable staff to discuss the periodic update with
the community prior to the start of and during the legislative
process. The goal of the presentations is to meet people
where they are, ensuring equity and diversity. Information
about open house dates and other key meeting dates will be
widely distributed through news releases, social network blog,
the periodic update webpage, the City’s social media
platforms, and the email contact lists. Staff will create
interactive tools to engage involvement and interest such as
charades, pamphlets, displays, and comment forms.
Commissioner Varela asked about options to interact with other
public and private agencies that community members frequently
contact, such as for renewing licenses, car rental agencies, moving
companies, or the Post Office to identify new residents through
change of address requests. In those instances, staff could provide
information to community members about the update process.
Planner Smith-Erickson said the original draft plan included
contacting real estate agents to create an informational pamphlet for
distribution to people who are buying or selling homes in the City.
Manager Medrud recommended reviewing the suggestions with
Communications staff to ensure consolidation of all efforts.
TUMWATER PLANNING COMMISSION
MINUTES OF HYBRID MEETING
June 27, 2023 Page 8
Planner Smith-Erickson shared information on public participation
methods utilized during the 2016 Comprehensive Plan update
process. Staff utilized the utility bill insert questionnaire in winter
2016. In January and February 2017, telephone surveys were
completed along with school board coffee talks. Staff plans to
document and track public engagement efforts throughout the update
process.
Chair Robbins recommended using the Manager’s Report during
meetings to provide updates on public engagement outcomes.
Planner Smith-Erickson said the timeline for Community
Engagement Phase I is from summer 2023 through winter 2024.
During Phase I, staff will review visions, goals, and policies in the
existing Comprehensive Plan and prepare gap analyses of all
Comprehensive Plan Elements and Plans. The Department of
Commerce continues to work on updated guidance to jurisdictions.
The community and stakeholders will be introduced to the periodic
update process through a series of communications and asked to
prioritize the Comprehensive Plan’s vision, goals, and policies
through a variety of media engagement methods, including surveys,
open houses, informal meetings, presentations, the City periodic
update webpage, social media platforms, and email contact list. The
Update website will be launched by the end of July. The first public
outreach meeting is tentatively scheduled in August 2023.
During Phase II from winter 2024 through spring 2024, focus groups
of technical experts will review Comprehensive Plan Elements and
Plans that are not represented through the City’s boards or
commissions. The focus groups will review and provide input into
relevant draft Comprehensive Plan Elements and Plans. Feedback
gathered through the community engagement process will also be
shared with these groups. Contact with the community will continue
through a variety of media engagement methods.
Commissioner Tobias asked about the source of focus group
technical experts. Manager Medrud said members will be
professionals within their respective fields, such as transportation
consultants to assist in the development of the Transportation Plan,
as well as stakeholders with transportation experience to provide
input. For the update of the Economic Development Plan, staff will
contact the technical consultant who assisted in identifying and
including initial data in the plan.
Planner Smith-Erickson reported Phase III is the legislative process
beginning in summer 2024 through June 30, 2025. Staff will
complete draft versions of the Comprehensive Plan Elements and
TUMWATER PLANNING COMMISSION
MINUTES OF HYBRID MEETING
June 27, 2023 Page 9
Plans during Phase III. Access to drafts of the Plan will be available
to the community through the City’s periodic update webpage, social
media platforms, and email contact list. Relevant City advisory
boards and commissions will develop recommendations and
forwarded to the Planning Commission. All focus group members
will have an opportunity to review the work. The Planning
Commission will hold a number of worksessions to review
Comprehensive Plan Elements and Plans. Opportunities for a joint
worksessions will be considered. The Planning Commission will
conduct a public hearing to receive community comment on the draft
Comprehensive Plan before developing findings of fact, conclusions,
and recommendations that will be forwarded to City Council. Public
notice of the hearing will be published in accordance with state law
and the TMC at least 30 days prior to the date of the hearing. In
addition to the required noticing procedures, notice will also be
provided through the City’s periodic update webpage, social media
platforms, and email contact list.
Manager Medrud reported the periodic update email is
compplan@ci.tumwater.wa.us. At the Commission’s July 25, 2023
meeting, information on the schedule will be shared. The proposed
public outreach plan is scheduled for review by the City Council in
July for approval.
The Commission supported moving the proposed public outreach
plan to the City Council for consideration.
NEXT MEETING: The next meeting is scheduled as a joint meeting with the Tree
Board on July 11, 2023.
ADJOURNMENT: Commissioner Varela moved, seconded by Commissioner
Sullivan, to adjourn the meeting at 8:00 p.m. A voice vote
approved the motion unanimously.
Prepared by Valerie Gow, Recording Secretary/President
Puget Sound Meeting Services, psmsoly@earthlink.net
Agenda
PLANNING COMMISSION
MEETING AGENDA
Online via Zoom and In Person at
Tumwater Fire Department
Headquarters, Training Room, 311 Israel
Rd. SW, Tumwater, WA 98501
Tuesday, June 27, 2023
7:00 PM
1. Call to Order
2. Roll Call
3. Changes to Agenda
4. Approval of Minutes
a. Planning Commission February 28, 2023 Minutes
b. Planning Commission Minutes March 14, 2023
c. Joint Planning Commission - Tree Board May 9, 2023 Minutes
5. Commissioner's Reports
6. Manager's Report
7. Public Comment
8. Preliminary Docket for 2023 Annual Housekeeping Amendments
9. 2025 Comprehensive Plan Periodic Update Process – Community Engagement Plan
10. Next Meeting Date - 07/11/2023 Joint Worksession with Tree Board
11. Adjourn
Meeting Information
The public are welcome to attend in person, by telephone or online via Zoom.
Watch Online
https://us02web.zoom.us/webinar/register/WN_LItJrr3aRsOh7D5LxUlUsQ
Listen by Telephone
Call (253) 215-8782, listen for the prompts, and enter the Webinar ID 859 0123 7372 and Passcode
614484.
Public Comment
The public is invited to attend the meeting and offer comment. The public may register in advance for
this webinar to provide comment:
https://us02web.zoom.us/webinar/register/WN_LItJrr3aRsOh7D5LxUlUsQ
After registering, you will receive a confirmation email containing information about joining the webinar.
The public may also submit comments prior to the meeting by sending an email to:
cdd@ci.tumwater.wa.us. Please send the comments by 1:00 p.m. on the date of the meeting.
Comments are submitted directly to the Commission Members and will not be read individually into the
record of the meeting.
If you have any questions, please contact Planning Manager, Brad Medrud at (360) 754-4180 or
bmedrud@ci.tumwater.wa.us.
Post Meeting
Audio of the meeting will be recorded and later available by request, please email
CityClerk@ci.tumwater.wa.us.
Accommodations
The City of Tumwater takes pride in ensuring that people with disabilities are able to take part in, and
benefit from, the range of public programs, services, and activities offered by the City. To request an
accommodation or alternate format of communication, please contact the City Clerk by calling (360)
252-5488 or email CityClerk@ci.tumwater.wa.us. For vision or hearing impaired services, please
contact the Washington State Relay Services at 7-1-1 or 1-(800)-833-6384. To contact the City’s ADA
Coordinator directly, call (360) 754-4128 or email ADACoordinator@ci.tumwater.wa.us.
What is the Planning Commission?
The Tumwater Planning Commission is a citizen advisory commission that is appointed by and
advisory to the City Council on the preparation and amendment of land use plans and implementing
ordinances such as zoning. Actions by the Planning Commission are not final decisions; they are
Commission recommendations to the City Council who must ultimately make the final decision. If
you have any questions or suggestions on ways the Commission can serve you better, please
contact the Community Development Department at (360) 754-4180.
Decorum Statement
Welcome to the Planning Commission meeting. We thank you for attending.
The City Council encourages community engagement in local government and provides a variety of
ways to participate.
The Chair of the Planning Commission will be responsible for conducting orderly and efficient meetings
within the scheduled time. To accomplish that, the Chair will maintain order and decorum and can
regulate inappropriate debate, repetitious discussion, and disruptive behavior when needed.
The Chair will recognize those that wish to speak and may limit the time allowed for individual
comments. City staff will record questions and comments during the meeting. If an issue or question
cannot be addressed during the meeting, City staff will address the issue or respond to the question by
following up with the individual.
We respectfully request that attendees refrain from disruptions during the meeting and comply with
decorum rules.
Thank you for participating.