Public Works Committee
Regular MeetingTumwater, WA · February 23, 2023
Minutes
TUMWATER PUBLIC WORKS COMMITTEE
MINUTES OF VIRTUAL MEETING
February 23, 2023 Page 1
CONVENE: 8:00 a.m.
PRESENT: Chair Eileen Swarthout and Councilmembers Michael Althauser and Charlie
Schneider.
Staff: Water Resources and Sustainability Director Dan Smith, Engineering
Services Manager Bill Lindauer, and Administrative Assistant Cathy
Nielsen.
Others: Meridith Greer, Greer Environmental Consulting.
APPROVAL OF
MINUTES: PUBLIC
WORKS
COMMITTEE,
JANUARY 5 &
JANUARY 19, 2023:
MOTION: Councilmember Schneider moved, seconded by Councilmember
Althauser, to approve the minutes of January 5, 2023 and January 19,
2023 as published. Motion carried unanimously.
SERVICE PROVIDER Consultant Meridith Greer with Greer Environmental Consulting, briefed the
AGREEMENT WITH committee on the proposed amendment with PBS for the Percival Creek Fish
PBS FOR THE Passage Barrier Removal project.
PERCIVAL CREEK
FISH PASSAGE Ms. Greer reviewed the status of the project. The culvert is 1 of 7 full fish
BARRIER REMOVAL passage barriers within the Deschutes WRIA 13 watershed. The culvert was
PROJECT identified as a priority to repair by 2032, as it blocks one-third of Percival
AMENDMENT 3: Creek for fish access because of the slope within the culvert. The culvert is
1 of 10 main stem barriers on Percival Creek and the only full culvert.
The culvert blocks a significant reach for several different salmon species in
the watershed to include Chung, Coho, Chinook, steelhead, and residential
trout. The project is replacement and installations of a 19-foot four-sided
box culvert with 135 feet of stream regrade to enable the stream to move
naturally. The project includes the addition of large woody material near the
Sapp Road park to improve habitat and slow stream flow as it flows through
the culvert. The project is also a transportation improvement project to
expand the narrow road and add bike lanes and sidewalks on both sides of
the road to improve safety for bicyclists and pedestrians. The project
increases the size of both travel lanes to meet street standards.
The third amendment is required because of new construction funding the
City received. Originally, staff was seeking construction funding of
approximately $1.5 million from a funding source specific to salmon
recovery. The program was willing to fund those parts of the project related
TUMWATER PUBLIC WORKS COMMITTEE
MINUTES OF VIRTUAL MEETING
February 23, 2023 Page 2
to fish passage with the remaining half of the project unfunded. In
December, staff learned the project was one of six projects in the state that
qualified for PROTECT (Promoting Resilient Operations for
Transformative, Effective, and Cost Saving Transportation) funding
available through the new bipartisan infrastructure bill administered by
Washington State Department of Transportation (WSDOT). The funding
enables consolidation of both fish and transportation elements into one
project. The City received a funding award of $2.1 million to complete the
project. As the funding source is a new program, the City must meet new
requirements by June 2023 to include ensuring the project is shovel ready,
applying for a National Environmental Policy Act permit (in process),
securing necessary right-of-way for the project area certified to WSDOT
standards, and adding the project to the State Transportation Improvement
Program (STIP). The City Council will consider scheduling a public hearing
to receive testimony on the proposal to add the project to the City’s
Transportation Improvement Plan at its March 7, 2023 meeting.
The third amendment speaks to the need for the project to meet the shovel-
ready. requirement. The proposed amendment would advance the project to
100% design and construction documents to meet the June 2023 deadline.
The proposed amendment increases the contract by $27,000 for a total
design budget of $250,000 for the project. PROJECT funding requires no
local match.
Currently, the project is on track to complete PS&E deliverables by May
2023 to enable bidding of the project in October 2023 with construction
beginning in summer 2024. A shovel ready project is defined as a project
that has completed design and engineering and is ready to construct.
MOTION: Chair Swarthout moved, seconded by Councilmember Schneider, to
recommended the City Council approve and authorize the Mayor to
sign the Service Provider Agreement with PBS for the Percival Creek
Fish Passage Barrier Removal Project Amendment 3. Motion carried
unanimously.
I-5 / TROSPER ROAD/ Manager Lindauer briefed the committee on potential road closures during
CAPITOL the construction of the I-5/Trosper Road/Capitol Boulevard Reconfiguration
BOULEVARD project.
RECONFIGURATION
PROJECT, The project includes installation of three roundabouts at the Trosper Road
CONSTRUCTION interchange, construction of new 6th Avenue from Lee Street to Trosper
ROAD CLOSURES: Road, and an extension of Capitol Boulevard to Linda Street. Construction
began on January 17, 2023 to install the sanitary sewer line within the
project boundary.
The request is to recommend the City Council authorize closure of City
streets as needed for construction of the I-5/Trosper Road/Capitol Boulevard
TUMWATER PUBLIC WORKS COMMITTEE
MINUTES OF VIRTUAL MEETING
February 23, 2023 Page 3
Reconfiguration project.
The contractor recently completed the 18-month construction schedule. In
some specific instances, road closures facilitate completion of the project
when applied strategically during the project. Road closures are an excellent
tool for construction management as long as used sparingly. When used
appropriately, closures enhance public safety especially during complex
utility installations. Road closures also increase safety for both construction
workers and City staff in work zones, as well as maximizing workspace
during construction increasing work productivity, reducing project delays,
and reducing project costs. However, staff would only consider road
closures when there is a significant need and if the road closure is fully
vetted by the Transportation and Engineering Director. All road closures
have an approved detour plan and a specific length applicable to the time
necessary to complete the construction task. Staff also ensures adequate
public noticing so the public is aware of any pending road closure. The City
is regulated by RCW 47.48.010 for roadway closures. Road closures for
significant restrictions or risk associated with capital projects require
authorization from the City Council. Additionally, due the complexity of the
project and the fast-paced nature of the work, staff is concerned with the
time required to brief the committee and the Council on a proposed road
closure as the time factor could directly affect the ability for the contractor to
complete work.
Providing the Transportation and Engineering Director with the authority to
move forward with needed roadway closures reduces the approval time and
assists City staff and the contractor in maintaining the project schedule.
Councilmember Schneider asked whether the public has access to the project
schedule and road closures through the QR code for the project. Manager
Lindauer advised that it was the intent to produce the business cards with the
QR code to enable the public to access information about the project.
Manager Lindauer addressed questions about the project components. Sewer
installation is the first component followed by installation of water lines,
stormwater, and the underground utility trench. The underground work will
require several months and is the most difficult part of the project.
Councilmember Althauser said he appreciates the public noticing efforts to
ensure the community is aware of the project, as some motorists have no
other option for traveling to their destination.
Manager Lindauer commented that the City’s project coordination is very
effective. Staff is also collaborating with WSDOT staff on the ramp
closures. Ramp closures will be publicized on WSDOT’s website as well.
MOTION: Councilmember Schneider moved, seconded by Councilmember
TUMWATER PUBLIC WORKS COMMITTEE
MINUTES OF VIRTUAL MEETING
February 23, 2023 Page 4
Althauser, to recommend the City Council authorize the Transportation
and Engineering Director to approve closure of City streets as needed
for the construction of the I-5/Trosper Road/Capitol Boulevard
Reconfiguration project. Motion carried unanimously.
ADJOURNMENT: With there being no further business, Chair Swarthout adjourned the
meeting at 8:20 a.m.
Prepared by Valerie L. Gow, Recording Secretary/President
Puget Sound Meeting Services, psmsoly@earthlink.net
Agenda
PUBLIC WORKS COMMITTEE
AGENDA
Online via Zoom and In Person at
Tumwater City Hall, Council Conference
Room, 555 Israel Rd. SW, Tumwater, WA
98501
Thursday, February 23, 2023
8:00 AM
1. Call to Order
2. Roll Call
3. Approval of Minutes: Public Works Committee, January 5, 2023 & January 19, 2023
4. Service Provider Agreement with PBS for the Percival Creek Fish Passage Barrier Removal Project
Amendment 3 (Dan Smith)
5. I-5 / Trosper Rd / Capitol Boulevard Reconfiguration Project, Construction Road Closures
6. Additional Items
7. Adjourn
Meeting Information
All committee members will be attending remotely. The public are welcome to attend in person, by
telephone or online via Zoom.
Watch Online
https://us02web.zoom.us/j/87406161460?pwd=cklIZGJVNWJ0QmpRZWk5djh2d0wrdz09
Listen by Telephone
Call (253) 215-8782, listen for the prompts and enter the Webinar ID 874 0616 1460 and Passcode
602224.
Public Comment
The public may submit comments by sending an email to council@ci.tumwater.wa.us, no later than
5:00 p.m. the day before the meeting. Comments are submitted directly to the Committee members
and will not be read individually into the record of the meeting.
Post Meeting
Audio of the meeting will be recorded and later available by request, please email
CityClerk@ci.tumwater.wa.us
Accommodations
The City of Tumwater takes pride in ensuring that people with disabilities are able to take part in, and
benefit from, the range of public programs, services, and activities offered by the City. To request an
accommodation or alternate format of communication, please contact the City Clerk by calling (360)
252-5488 or email CityClerk@ci.tumwater.wa.us. For vision or hearing impaired services, please
contact the Washington State Relay Services at 7-1-1 or 1-(800)-833-6384. To contact the City’s ADA