Muyni
← Back to Vienna

Board of Architectural Review

Regular Meeting

Vienna, VA · November 19, 2020

AgendaMinutes

Minutes

Town of Vienna 127 Center Street South Vienna, Virginia 22180 p: 703.255.6341 TTY 7111 Meeting Minutes Board of Architectural Review Thursday, November 19, 2020 7:30 PM COUNCIL CHAMBERS-VIENNA TOWN HALL Online Meeting To participate via zoom, please register here: https://us02web.zoom.us/webinar/register/WN_dr8vcIVYRTeuNRVw-lA8mg The Board of Architectural Review met in regular session at 7:30 PM on Thursday, November 19, 2020 in the Vienna Town Hall at 127 Center St S. and Via Zoom Webinar to discuss six agenda items. Chairman Roy Baldwin, Vice-Chair Michael Cheselka, Patty Hanley, Paul Layer, and Linda van Doorn were present participating via Zoom. Planner Andrea West and Principal Planner Kelly O’Brien participated via Zoom and Board Clerk Sharmaine Abaied was present in Town Hall. BAR - Resolution -Continuity of Government Resolution for Continuity of Government Motion to approve: Mr. Cheselka Second: Mr. Layer Roll call vote: 5-0 Ayes: Ms. van Doorn, Mr. Layer, Mr. Baldwin, Mr. Cheselka, and Ms. Hanley Roll Call Roll Call: Ms. van Doorn, Mr. Layer, Mr. Baldwin, Mr. Cheselka, and Ms. Hanley were present, Approval of Minutes Mr. Baldwin asked for corrections, there was one edit by Ms. van Doorn. The minutes for the October 2020 BAR meeting, with the edit, were accepted. Old Business 159 Maple Ave W - Cruz ‘n’ Shine Car Wash - Sign and Exterior Modification Request for approval of exterior modifications, landscaping, and new signage for the Cruz-n-Shine Car Wash located at 159 Maple Avenue W, Docket No. PF-54-20-BAR, in the C-2 General Commercial zoning district; filed by Matthew Hawkins, Helbing Lipp Recny Architects, Inc., project architect. Mr. John Recny was present to represent the application. Mr. Recny stated they were back to address the three items the Board deferred at a previous meeting. The first item: the lumens for the sign were recalculated and the sign is now at 94 lumens. The second item, new samples of the carbine red and zinc yellow that will be on the façade were brought to town hall for the Board to view. The third item, the acrylic pole sign, will be Town of Vienna Page 1 Printed on 12/29/2020 Board of Architectural Review Meeting Minutes November 19, 2020 white acrylic with a translucent red and yellow acrylic for the red and yellow parts of the sign. Mr. Cheselka asked what the lumen and kelvins were for the pole sign. Mr. Recny stated they were the same as what they had been previously as they are not changing the lights in the sign. The recessed lights were also inquired about as well in reference to the light spread. Mr. Layer stated the pewter color was more brown, than gray, but felt it would go better with the scheme. Mr. Layer asked about the yellow color on the sign and building as they seem to differ. Mr. Recny stated they were trying to get them to as close as possible in color. Mr. Layer made a motion the application be approved as submitted. Ms. Hanley asked for discussion as a portion of the application had been approved at a prior meeting and wanted to know if the motion should encapsulate what had been approved previously. Mr. Cheselka stated he understood that it was the new items from the original that they were reviewing. Ms. Hanley wanted to make sure all items were being presented and approved. Ms. West stated that the whole package was presented and could be approved as the complete package that evening. Motion to approve: Mr. Layer Second: Mr. Cheselka Approved: 5-0 Ayes: Ms. van Doorn, Mr. Layer, Mr. Baldwin, Mr. Chesleka, and Ms. Hanley New Business 120 Cherry St SE - Caffi Field - VPAC Mural Request for approval of a mural on the Caffi Field softball shed, located at 120 Cherry St SE, Docket No. PF-45-20-BAR, in the PR Park and Recreational zoning district; filed by Michael Cheselka, VPAC member. Mr. Baldwin stated the samples had not been submitted in time for Board members to review so the item would need to be deferred until a time which the Board can review the samples Motion to Defer: Mr. Layer Second: Ms. Hanley Approved: 5-0 Ayes: Ms. van Doorn, Mr. Layer, Mr. Baldwin, Mr. Cheselka, and Ms. Hanley Midge Biles asked to speak briefly regarding item 2. Mr. Baldwin mentioned that motion that was passed was to defer the item as the material samples had not been received in time. Ms. Biles gave a statement regarding the samples. 256 Maple Ave E - T-Mobile - Sign Request for approval of new signage for the T-Mobile located at 256 Maple Ave E Docket No. PF-53-20-BAR, in the C-1A Special Commercial zoning district; filed by Valeria Nitzey, Shane’s Signs, project agent. Town of Vienna Page 2 Printed on 12/29/2020 Board of Architectural Review Meeting Minutes November 19, 2020 Ms. Valeria Nitzey and Shane Nitzey were present to represent the application. Ms. West told the Board members the lumens for the sign had been clarified would be 69 total lumens. Mr. Layer if the channel letters were considered slim line, Mr. Nitzey asked for clarification. Mr. Layer stated the lighting and box used when originally approved was a slim box with a small projection beyond the surface of the building. Mr. Layer stated, he wanted to confirm that it was similar to the other signage. Mr. Nitzey stated it was a slim / shallow depth letter. Ms. Hanley asked if color of the letter would be the same as the current sign. Mr. Nitzey stated only 2 acrylic whites are used in signs, 2447: one is milky and slightly darker, and the other. 7328: is a lighter color. The 2447 was created to work with LED’s and is more translucent than the 7328. Mr. Nitzey stated that the use of white faces with LED’s it should be made out of 2447 industry wide. Motion to approve with the change in lumens from 6500 to 69.1 lumens: Mr. Cheselka Second: Mr. Layer Approved: 5-0 Ayes: Ms. van Doorn, Mr. Layer, Mr. Baldwin, Mr. Cheselka, and Ms. Hanley 515 Maple Ave E - SunTrust/BB&T Bank - Sign Request for approval of signage for the SunTrust/BB&T Bank located at 515 Maple Ave E Docket No. PF-55-20-BAR in the C-1 Local Commercial zoning district; filed by Gary Brent, MG Permits LLC, project agent. Mr. Gary Brent was present to represent the application. Mr. Brent stated that the application mentioned the existing pylon was to be removed or replaced which was incorrect. The pylon sign was only to be refaced. The existing sign is to just be refaced with the aluminum face with push through acrylic letters. No internal lighting, structure, or cabinet changes will be made, jut the panel. The window signage will be the same, reface of digitally printed, white graphic. applied vinyl. Ms. Hanley asked Ms. West if the completed application had all the correct information and if the discrepancies were only in the supporting documentation. Ms. West stated that was correct and mentioned that the Board could require updated documents. Ms. Hanley stated the Board could defer to the application. Mr. Layer asked for confirmation that the pylon sign was aluminum with punch letters, Mr. Brent stated that was correct. Ms. Hanley asked if there was a wrap around the pylon sign. Mr. Brent stated that the existing sign size will remain including the face of the sign. Mr. Cheselka asked if the lighting would remain the same for the pylon sign. Mr. Brent stated it would remain the same. Mr. Brent mentioned to the Board that these signs, although permanent signs would be temporary in nature as Suntrust/BB&T would change to their new name over the next year or so. There was additional conversation regarding the possibilities for signs in the future. Town of Vienna Page 3 Printed on 12/29/2020 Board of Architectural Review Meeting Minutes November 19, 2020 Motion to approve with the proviso that the approval is for the written application and not the supporting documentation: Ms. Hanley Second: Mr. Layer Approved: 5-0 Ayes: Ms. van Doorn, Mr. Layer, Mr. Baldwin, Mr. Cheselka, and Ms. Hanley 800 Maple Ave E - Westwood Country Club - Exterior Modifications Request for approval of exterior modifications for Westwood Country Club, located at 800 Maple Ave E, Docket No. PF-58-20-BAR in the RS-16 Single-Family Detached Residential zoning district; filed by Braden Field, MTFA Architecture, project architect. Mr. Braden Field was present to represent the application of the 1 story addition, to the main clubhouse, of a fitness area and cart maintenance/storage facility. The cart maintenance / storage facility is partially built into grade making it partially concealed from the upper level of the parking lot. It is primarily visible from the lower level. There will also be an accessible roof terrace area as extension of the second level of the clubhouse. There is finished paver material, railing, trellis, stand-alone open air roof to provide shading and architectural character. Mr. Cheselka asked about why there were three scuppers on the right side, but not all the way across. Mr. Field stated they did not want scuppers over the paved area as they are for over flow drainage. There will be secondary over flow drains below the pavers. Motion to approve: Mr. Cheselka Second: Ms. Layer Approved: 5-0 Ayes: Ms. van Doorn, Mr. Layer, Mr. Baldwin, Mr. Cheselka, and Ms. Hanley 413 Tapawingo Rd SW - Vienna Water Tank - Telecommunication Antennas Request for approval of replacement of telecommunication antennas at the Vienna Water Tank, located at 413 Tapawingo Rd SW, Docket No. PF-62-20-BAR, in the RS-10 Single-Family Detached Residential zoning district; filed by Astrid Payne, Network Building + Consulting, project agent. Ms. Astrid Payne was present to represent the application. She stated they would remove 9 antennas, and an equipment cabinet. They are proposing to install 9 new antennas and 2 new equipment cabinets. Mr. Baldwin asked if there would be any difference in the looks of the new antennas. Ms. Payne stated there would be no significant difference in the street view. Motion to approve: Mr. Layer Second: Mr. Cheselka Approved: 5-0 Ayes: Ms. van Doorn, Mr. Layer, Mr. Baldwin, Mr. Cheselka, and Ms. Hanley 198 Park Terrace Ct SE - Park Terrace Condominiums - Fence Request for approval of a replacement fence at Park Terrace Condominiums, located 198 Park Terrace Court SE, Docket No. PF-63-20-BAR, in the RM-2 Multifamily, Low Density zoning district; filed by Mariyan Kafadarov, director at Park Condominiums. Town of Vienna Page 4 Printed on 12/29/2020 Board of Architectural Review Meeting Minutes November 19, 2020 Mr. Mariyan Kafadarov was present to represent the application. Mr. Kafadarov stated they want to replace the surrounding two wood fences with aluminum metal fence. The reason for the change is due to privacy and safety for the pool area. Ms. van Doorn asked if the fence would be the sufficient height. Mr. Kafadarov stated it would be 6 feet in height. Ms. Hanley asked if the shared fence was in better condition on the front side. Mr. Kafadarov said it was in slightly better condition. They have replaced some planks to be safe, but depending on the budget and neighbor communication they will propose to replace the other fence which would be a separate application. Mr. Cheselka asked if it would be a powder coated black paint, Mr. Kafadarov stated that was correct. Motion to approve: Mr. Cheselka Second: Ms. Hanley Approved: 5-0 Ayes: Ms. van Doorn, Mr. Layer, Mr. Baldwin, Mr. Cheselka, and Ms. Hanley 100 East St SE - Repair and Replacement of Retaining Wall Request for approval of a repair and replacement of a retaining wall at 100 East Street SE, Docket No. PF-64-20-BAR, in the C-1/T Local Commercial / Transitional zoning districts; filed by Stephen Kenney, RV Architects, project architect. Mr. Stephen Kenney was present to represent the application. Mr. Kenney stated this was an emergency repair to the retaining wall on the east side of the property. There fallen portion is between the office building and the town homes which is about 900-100 feet long. Mr. Kenney explained what they believed caused the collapse and then stated they proposed quick brick which is a concrete brick with coloring to give the look of brick. They will be able to install two courses of quick brick versus the 3 courses of regular nominal brick. There will be a transition back to real brick at the cap and the proffers require a 6 foot masonry wall. Some of the grading will be fixed to include adding a swale which will handle the drainage better. Mr. Kenney stated they are also proposing shrubs rather than trees to allow sun in the rear yards of the town homes. Mr. Layer asked if there would be a pattern in the new brick, Mr. Kenney stated there would be a running bond. Mr. Layer asked if there would be two different colors. Mr. Kenney stated there would be a built in flashing and it would mimic the existing brick. Mr. Layer asked about the landscape, Mr. Kenney stated the new planting was on the far left side and what was “X” out on the right was cut down for safety purposes. Mr. Layer stated the legend showed proposed trees and proposed shrubs. Mr. Kenney stated that the legend was created before the HOA stated they did not want trees. Ms. Hanley asked if there would be weep holes in the new wall, Mr. Kenney stated they would be adding weep holes to relieve the water pressure. They would install 2 inch diameter pipe at the low side and backed up with gravel and filter fabric. Ms. Hanley asked if any drainage tile would be added. Mr. Kenney stated they would put in drain tile as well as tap into what was already there. Ms. Hanley asked if the walls would be joined with mortar. Mr. Kenney stated that was correct unless the structural engineer encouraged and expansion joint. Town of Vienna Page 5 Printed on 12/29/2020 Board of Architectural Review Meeting Minutes November 19, 2020 Mr. Cheselka asked if the cap would run with single brick perpendicular across the top. Mr. Kenney stated it would be a soldier course and header course to mimic what was already there. Ms. van Doorn asked the reason for using quick brick rather than regular nominal brick. Mr. Kenney stated it was a cost issue, but also that structurally, 2 bricks with rebar in between does not allow enough space for the right amount of mortar. With the quick brick the rebar can be run down the core and get good bonding with the mortar. Mr. Baldwin asked about the Home Owners Association, Mr. Kenney stated they had a letter stating the HOA is in agreeance with the changes. Mr. Baldwin asked what the difference would be between the new and existing brick. Mr. Kenney pointed out the photo that would show the difference. He continued stating most people will not be able to notice the difference between the new and old brick. Ms. Susan Forbes, of 113 Follin Ln SE, spoke stating she and three other neighbors back to the wall and stated that the neighbor on the Maple St. side may not want trees, but the other neighbors would like them for privacy. Mr. Kenney stated they would be open to adding trees. There was continued discussion between the applicant and the resident regarding the trees and shrubs. Mr. Cheselka asked if the HOA Board was in agreeance with the trees. Ms. Forbes stated it was an informal discussion in their yards. Mr. Baldwin asked why Ms. Forbes could not plant trees on her side of the wall. Ms. Forbes said she would have some trees, but they wouldn’t be as high or give as much privacy. Ms. Forbes stated that they would like to see the quick brick approved and thought that all the neighbors would want a mix of the shrubs and trees. Ms. Hanley asked which lot Ms. Forbes home was located; Ms. Forbes said she was on lot 8. Ms. Hanley stated she asked to see what trees could possibly be planted although the owner of the commercial building was well with in their required tree canopy coverage. There was continued discussion regarding trees. Mr. Baldwin asked Mr. Kenney his thoughts of approving the wall and deferring the landscaping. Mr. Kenney asked if there was a way to have a chairman’s review for the landscaping. Ms. West stated it would have to come back for a full meeting. Ms. Hanley suggested the Board approve three understory trees at 20-30 feet high at maturity. Mr. Kenney stated Mr. Meruvia would be willing to work with homeowners regarding the trees. Ms. West recommended the approval be conditioned with the trees are from the official town list. Ms. van Doorn inquired who would absorb the cost of the wall, Mr. Kenney stated it would be the property owner. Ms. van Doorn asked if trees on the Town of Vienna approved list would not be suitable, would the owner be required to choose those trees. Ms. West stated that through site work if it is discovered that a tree is not appropriate the applicant can come back and ask for a revision. Mr. Layer stated they could move forward if a decision / agreement could be made regarding the allowable appropriate trees by the town and number of trees. Mr. Baldwin stated the Board may need to defer the landscaping portion of the application. Ms. Hanley stated she didn’t want to defer as what was presented is acceptable and any changes would need to come from the applicant. Mr. Kenney stated they could put in three trees with smaller root bases around lots 7 and 8. Mr. Layer stated he was okay with either direction. There was continued discussion regarding the trees. Mr. Baldwin asked for a motion. Town of Vienna Page 6 Printed on 12/29/2020 Board of Architectural Review Meeting Minutes November 19, 2020 Mr. Layer split the motion in to two. The first motion was to approve the repair and replacement of the retaining wall as submitted. Ms. Hanley seconded. Motion to approve the retaining wall as submitted: Mr. Layer Second: Ms. Hanley Approved: 5-0 Ayes: Ms. van Doorn, Mr. Layer, Mr. Baldwin, Mr. Cheselka, and Ms. Hanley Mr. Layer made a motion to approve the landscaping with the condition that the trees are from a selection of the Town of Vienna approved tree list and found appropriate for that installation. There will need to be three trees planted in addition to the shrubs already shown on the plan and coordinated with the adjacent property owners. If the number or conditions stated change, it will require a separate motion at a different time. Ms. van Doorn asked if there would be adequate space for the trees replacing the shrubs. Mr. Kenney stated they would need to reduce the amount of shrubs. Mr. Layer asked about amending the motion to include that information. Motion to approve the landscaping with the following conditions: Mr. Layer -trees are from an appropriate selection from the Town of Vienna tree list -trees are appropriate for that type of installation -the trees planted in addition to the shrubs shown in the plan -coordination with the adjacent property owners regarding the trees -shrubs will be altered to accommodate additional trees -if the number or conditions stated change, it will require a separate motion at a different time. Second: Ms. Hanley Approved: 5-0 Ayes: Ms. van Doorn, Mr. Layer, Mr. Baldwin, Mr. Cheselka, and Ms. Hanley Meeting Adjournment Motion to adjourn: Mr. Cheselka Second: Ms. Hanley Approved: 5-0 Ayes: Ms. van Doorn, Mr. Layer, Mr. Baldwin, Mr. Cheselka, and Ms. Hanley The meeting adjourned at 9:08 pm. Respectfully submitted, Sharmaine Abaied Board Clerk THE TOWN OF VIENNA IS COMMITTED TO FULL COMPLIANCE WITH THE AMERICANS WITH DISABILITIES ACT STANDARDS. TRANSLATION SERVICES, ASSISTANCE OR ACCOMMODATION REQUESTS FROM PERSONS WITH DISABILITIES ARE TO BE REQUESTED NOT LESS THAN 3 WORKING DAYS BEFORE THE DAY OF THE EVENT. PLEASE CALL (703) 255-6304, OR 711 VIRGINIA RELAY SERVICE FOR THE HEARING IMPAIRED. Town of Vienna Page 7 Printed on 12/29/2020

Agenda

Town of Vienna 127 Center Street South Vienna, Virginia 22180 p: 703.255.6341 TTY 7111 Meeting Agenda Board of Architectural Review Thursday, November 19, 2020 7:30 PM COUNCIL CHAMBERS-VIENNA TOWN HALL Online Meeting To participate via zoom, please register here: https://us02web.zoom.us/webinar/register/WN_dr8vcIVYRTeuNRVw-lA8mg BAR20-192 BAR - Resolution -Continuity of Government Attachments: BAR - Resolution -Continuity of Government November 19, 2020 Roll Call Approval of Minutes Old Business BAR20-193 159 Maple Ave W - Cruz ‘n’ Shine Car Wash - Sign and Exterior Modification Attachments: 01- sr_PF-54-20-BAR_Cruz-n-Shine Car Wash_159 Maple Ave W - Nov 2020 02 - Application_PF-54-20-BAR_Cruz-n-Shine Car Wash_159 Maple Ave W - Nov 2020 03 - Material Cut Sheets_PF-54-20-BAR_Cruz-n-Shine Car Wash_159 Maple Ave W - Nov 2020 04 - Contextual Photos_PF-54-20-BAR_Cruz-n-Shine Car Wash_159 Maple Ave W - Nov 2020 05 - 008_A1 Site Plan_PF-54-20-BAR_Cruz-n-Shine Car Wash_159 Maple Ave W - Nov 2020 06 - A002_A2 Exisitng Elevations_PF-54-20-BAR_Cruz-n-Shine Car Wash_159 Maple Ave W - Nov 2020 07 - A003_A3 Existing Elevations_PF-54-20-BAR_Cruz-n-Shine Car Wash_159 Maple Ave W - Nov 2020 08 - A004_A4 Reflected Ceiling Plan_PF-54-20-BAR_Cruz-n-Shine Car Wash_159 Maple Ave W - Nov 2020 09 - A005_A5 Elevations (New Work)_PF-54-20-BAR_Cruz-n-Shine Car Wash_159 Maple Ave W - Nov 2020 10 - A006_A6 Elevations (New Work)_PF-54-20-BAR_Cruz-n-Shine Car Wash_159 Maple Ave W - Nov 2020 11 - A007_A7 Signage_PF-54-20-BAR_Cruz-n-Shine Car Wash_159 Maple Ave W - Nov 2020 12 - A008_A8 Rendering_PF-54-20-BAR_Cruz-n-Shine Car Wash_159 Maple Ave W - Nov 2020 New Business Page 1 Printed on 11/13/2020 Board of Architectural Review Meeting Agenda November 19, 2020 BAR20-194 120 Cherry St SE - Caffi Field - VPAC Mural Attachments: 01 - sr_PF-45-20-BAR_VPAC Mural_120 Cherry St SE 02 - Application_PF-45-20-BAR_VPAC Mural_120 Cherry St SE 03 - A001 Shed artwork_PF-45-20-BAR_VPAC Mural_120 Cherry St SE 04 - A002 Caffi Field shed_PF-45-20-BAR_VPAC Mural_120 Cherry St SE 05 - A003 Arial view of shed_PF-45-20-BAR_VPAC Mural_120 Cherry St SE 06 - A004 another aeriel view of shed_PF-45-20-BAR_VPAC Mural_120 Cherry St SE 07 - A005 paint can_PF-45-20-BAR_VPAC Mural_120 Cherry St SE 08 - A006 paint color swatches_PF-45-20-BAR_VPAC Mural_120 Cherry St SE 09 - A007 site map of shed_PF-45-20-BAR_VPAC Mural_120 Cherry St SE BAR20-195 256 Maple Ave E - T-Mobile - Sign Attachments: 01- sr_PF-53-20-BAR_T-Mobile_256 Maple Ave E_sign 02 - Application_PF-53-20-BAR_T-Mobile_256 Maple Ave E_sign 03 - T-Mobile Vienna Storefront_PF-53-20-BAR_T-Mobile_256 Maple Ave E_sign 04 - T-Mobile Vienna section view_PF-53-20-BAR_T-Mobile_256 Maple Ave E_sign 05 - T-Mobile Vienna color scheme_PF-53-20-BAR_T-Mobile_256 Maple Ave E_sign BAR20-196 515 Maple Ave E - SunTrust/BB&T Bank - Sign Attachments: 01 - sr_PF-55-20-BAR_Suntrust BB&T_515 Maple Ave E_Signs 02 - Application_PF-55-20-BAR_Suntrust BB&T_515 Maple Ave E_Signs 03 - A001_Freestanding Sign reface details_PF-55-20-BAR_Suntrust BB&T_515 Maple Ave E_Signs 04 - A002_Coversheet Site Plan_PF-55-20-BAR_Suntrust BB&T_515 Maple Ave E_Signs 05 - A003_Window Sign layout_PF-55-20-BAR_Suntrust BB&T_515 Maple Ave E_Signs 06 - A004_Storefront window sign rendering_PF-55-20-BAR_Suntrust BB&T_515 Maple Ave E_Signs 07 - A005_Existing storefront rendering_PF-55-20-BAR_Suntrust BB&T_515 Maple Ave E_Signs Page 2 Printed on 11/13/2020 Board of Architectural Review Meeting Agenda November 19, 2020 BAR20-197 800 Maple Ave E - Westwood Country Club - Exterior Modifications Attachments: 01 - sr_PF-56-20-BAR_Westwood Country Club_800 Maple Ave E 02 - Application_PF-56-20-BAR_Westwood Country Club_800 Maple Ave E 03 - BAR CS COVER SHEET 04 - BAR-00 - PROPOSED ARCHITECTURAL SITE PLAN 05 - BAR-01 EXISTING CONDITIONS 06 - BAR-02 - PROPOSED LEVEL 1 FLOOR PLAN 07 - BAR-03 - PROPOSED LEVEL 2 FLOOR PLAN 08 - BAR-04 - PROPOSED ROOF PLAN 09 - BAR-05 - EXISTING BUILDING ELEVATIONS 10 - BAR-06 - PROPOSED BUILDING ELEVATIONS 11 - BAR-07 - EXTERIOR BUILDING MATERIALS 12 - BAR-08 BUILDING SECTIONS 13 - C301 EXISTING CONDITIONS 14 - C302 EXISTING CONDITIONS & DEMOLITION PLAN 15 - C401 SITE PLAN 16 - C402 SITE PLAN 17 - C403 GRADING PLAN 18 - C404 GRADING PLAN 19 - L100 MATERIALS PLAN 20 - L102 PLANTING PLAN 21 - L103 PLANTING DETAILS 22 - L104 PLANT IMAGES 23 - L105 PLANT IMAGES 24 - L106 PLANT IMAGES 25 - L107 PRODUCT INFORMATION Page 3 Printed on 11/13/2020 Board of Architectural Review Meeting Agenda November 19, 2020 BAR20-198 413 Tapawingo Rd SW - Vienna Water Tank - Telecommunication Antennas Attachments: 01 - sr_PF-62-20-BAR_telecommunication antennas_413 Tapawingo Road SW 02 - Application_PF-62-20-BAR_telecommunication antennas_413 Tapawingo Road SW 03 - Site Photos- 413 Tapawingo Road SW- Vienna Water Tank 04 - Water Tower Analysis (S&S) -413 Tapawingo Road SW-Vienna Water Tank 10-28-2020 05 - Catwalk & Handrail Analysis -413 Tapawingo Road SW- Vienna Water Tank 06 - 000_Cover sheet 07 - 001_General Structural Notes 08 - 002_Site Plan 09 - 003_Enlarged Plan 10 -004_Water Tower Elevation 11 - 005_Antenna Sector Plans 12 - 006_Anenna Schedule & Equipment Plans 13 - 007_Structural Details 14 - 008_Part Site Plan, Antenna Sector Plan, Equipment Plan and Notes 15 - 009_Part Plan, Power Riser, Schedule ,and Notes 16 - 010_Schematic Drawings 17 - 011_Symbols List, Notes, and Detail BAR20-199 198 Park Terrace Ct SE - Park Terrace Condominiums - Fence Attachments: 01 - sr_PF-63-20-BAR_Park Terrance Condo_198 Park Terrace Ct SE 02 - Application_PF-63-20-BAR_Park Terrance Condo_198 Park Terrace Ct SE 03 - Plat_PF-63-20-BAR_Park Terrance Condo_198 Park Terrace Ct SE 04 - Park_Terrace_Pool_exist_fence_1_PF-63-20-BAR_Park Terrance Condo_198 Park Terrace 05 - Park_Terrace_Pool_exist_fence_2_PF-63-20-BAR_Park Terrance Condo_198 Park Terrace 06 - Park_Terrace_Pool_new_fence_design_NOVA_061_PF-63-20-BAR_Park Terrance Condo_198 P 07 - Park_Terrace_Pool_fence_mesurments_PF-63-20-BAR_Park Terrance Condo_198 Park Terra Page 4 Printed on 11/13/2020 Board of Architectural Review Meeting Agenda November 19, 2020 BAR20-200 100 East St SE - Repair and Replacement of Retaining Wall Attachments: 01 - sr_PF-64-20-BAR_100 East Street SE_Retaining Wall 02 - Application_PF-64-20-BAR_100 East Street SE_Retaining Wall 03 - Landscape Exhibit_PF-64-20-BAR_100 East Street SE_Retaining Wall 04 - 100-EAST-ST_A2-1_PF-64-20-BAR_100 East Street SE_Retaining Wall 05 - 100-EAST-ST_A2-2_PF-64-20-BAR_100 East Street SE_Retaining Wall 06 - 100-EAST-ST_A2-3_PF-64-20-BAR_100 East Street SE_Retaining Wall 07 - 100-EAST-ST_A2-4_PF-64-20-BAR_100 East Street SE_Retaining Wall 08 - 100-East-St-Site-plan_PF-64-20-BAR_100 East Street SE_Retaining Wall 09 - Neighbor Letter_PF-64-20-BAR_100 East Street SE_Retaining Wall Meeting Adjournment THE TOWN OF VIENNA IS COMMITTED TO FULL COMPLIANCE WITH THE AMERICANS WITH DISABILITIES ACT STANDARDS. TRANSLATION SERVICES, ASSISTANCE OR ACCOMMODATION REQUESTS FROM PERSONS WITH DISABILITIES ARE TO BE REQUESTED NOT LESS THAN 3 WORKING DAYS BEFORE THE DAY OF THE EVENT. PLEASE CALL (703) 255-6304, OR 711 VIRGINIA RELAY SERVICE FOR THE HEARING IMPAIRED. Page 5 Printed on 11/13/2020

Get email alerts for Vienna

A daily email when new agendas and minutes are posted.

Report an issue with this meeting