Board of Architectural Review
Regular MeetingVienna, VA · July 21, 2022
Minutes
Town of Vienna 127 Center Street South
Vienna, Virginia 22180
p: 703.255.6341
TTY 7111
Meeting Minutes
Board of Architectural Review
Thursday, July 21, 2022 7:30 PM COUNCIL CHAMBERS-VIENNA TOWN
HALL
Roll Call
The Board of Architectural Review met in a regular session on Thursday, July 21, 2022,
at 7:30 pm in the Vienna Town Hall at 127 Center St. S Council Chambers.
Vice-Chair Mr. Cheselka called the meeting to order at 7:30 pm.
Roll Call: Ms. van Doorn, Ms. Hanley, Mr. Layer, Mr.Cheselka were present
Member Absent: Mr. Baldwin
Staff present: Planner Sharmaine Abaied and Board Clerk Yaska Camacho Castillo
Approval of the Minutes
Meeting minutes for June 16, 2022, were accepted as submitted.
Old Business
Yellow Diner- 501 Maple Ave W- Exterior Modification
Item No. 1: Request for approval of exterior modifications for The Yellow Diner, located at
501 Maple Ave W, Docket No. PF-795690-BAR, in the C-1, Local Commercial zoning
district, filed by Benjamin Webne, BWA, project contact.
Benjamin Webne & Nicholas Melisiotis. – 501 Maple Ave W Vienna, VA 22180 – were
present for the application.
Mr. Webne provided a rundown of the request for the exterior modifications. He said they
would like to paint the brick and the cornice. They are enclosing the existing drive-thru,
installing a new window wall, and adding a new entry vestibule. Mr. Webne stated they do
not have the signage at the moment, but it will be submitted through a revision along with
the mural. The applicant said they will have a covered patio screening in the new outdoor
dining area and are replacing all the windows with energy-efficient ones.
Ms. van Doorn asked what material will be used for the outdoor seating cover. The
applicant stated it would be white oak wood. Ms. van Doorn inquired about the brick color.
As the samples were being passed around for the board members to review Mr, Webne
confirmed which colors would be used for the brick and the cornice.
Mr. Layer asked for clarification on the painted brick color shown on the image labeled
PT-1 on the PowerPoint presentation. He stated it looked like wood (wood grain) on the
image. The applicant clarified that the wood was labeled as WD-1 below PT-1. Ms. Hanley
asked if the wood would only be on the vestibule. Mr. Webne said it would be on the
vestibule and the canopy over the private dining. Mr. Layer asked if the image labeled
Town of Vienna Page 1 Printed on 8/29/2022
Board of Architectural Review Meeting Minutes July 21, 2022
MT-1 was the window frame, to which the applicant replied yes. He then asked if the color
would be as shown on the rendering, not the elevation. The applicant replied the color
would be copper cladding. Mr. Layer asked if he provided a sample, to which the applicant
answered he could not get it before the meeting but could provide one if required. Mr.
Layer said the one way they can tell the actual color accurately is with the sample. He
asked the applicant to submit a sample. Mr. Melisiotis commented that the paint is
supposed to look like copper but does not shine or patina like cooper. Mr. Layer referred
to the color of the rendering. They continued to discuss the paint.
Ms. Hanley told the staff if the materials were not available, the brochures that the
manufacturer prints would give the board a better understanding of the actual color. She
asked the applicant what the material for the placeholder was as of today -was it a CMU
wall? How is it going to be treated before the mural gets put up? The applicant stated they
would collaborate with an artist and submit it as a revision. Ms. Hanley then clarified her
question. She asked what brick or product they were planning on using. Mr. Nicholas
stated one wall would be solid concrete with a smooth finish. Ms. Hanley asked if it was
going to be painted. The applicant replied yes, the same color as the brick. They discussed
having the paint identified as an exterior base paint, temporarily finished products, and the
addition to the existing building.
Mr. Layer voiced his concern with the paint. He said the applicant is to commit to the
mural tonight with a motion to leave it blank concrete. He stated the importance of leaving
the mural as blank concrete is to allow the artist to apply a primer specific to how they
approach their mural for longevity. They discussed what would be placed as conditions to
the motion.
Ms. Hanley asked Ms. Abaied if they approved the application with the placeholder before
occupancy; does the mural need to be resolved/installed? Ms. Abaied stated multiple things
would need to come back to the board for revision, such as the mural, outdoor seating, and
signage. She said the applicant would not receive occupancy until all items were reviewed
and approved by the board. The applicant had some questions about the process for
revisions and moving forward with the commercial building permit. They discussed the
procedures.
Mr. Cheselka commented the paint and concrete should be left to the artist. He inquired
about the lumen levels, to which the applicant responded 1200 lumens. They reviewed the
lumen levels and the purpose of the lights. Mr. Cheselka said he noticed the applicant
replaced the bollards with planters. He asked if they were wooden planters. The applicant
replied they are fiberglass planters that can be filled with center blocks or concrete. Mr.
Cheselka said he would feel more comfortable if the planters were filled with something.
The board discussed gravel as a good option to fill the planters.
Ms. Hanley made a motion to approve the request for exterior modifications for The Yellow
Diner, located at 501 Maple Ave W, Docket No. PF-795690-BAR, in the C-1, Local
Commercial zoning district with the following specifications:
• The placeholder for the mural is to be smooth unfinished concrete.
• The mural is to be approved later and finished before occupancy.
• The Planters, alongside the outdoor seating, must be filled up to 1/3 with gravel to keep
it heavy and protect pedestrians and diners.
Motion: Ms. Hanley
Second: Mr. Layer
Ayes: 4
Town of Vienna Page 2 Printed on 8/29/2022
Board of Architectural Review Meeting Minutes July 21, 2022
Nays: 0
Absent: Mr. Baldwin
Motion Carried
Nozzo Pazzo - 122 Branch Rd SE - Signs
Item No. 2: Request for approval of a new storefront sign and window signs for Nozzo
Pazzo, located at 122 Branch Rd SE, Docket No. PF-752028-BAR, in the C-2, General
Commercial zoning district, filed by James Audia, business owner.
Marc Murphy – 307 Maple Ave W suite K, Vienna, VA 22180 – was present for the
application.
Mr. Murphy gave a brief description of the application. He stated they wanted to replicate
what was there previously. He mentioned that the previous submittal did not include
measurements of what would be included, and he hoped they did so with the current
submittal for tonight’s meeting. Mr. Layer inquired for clarification on what was being
approved on this application. Mr. Murphy stated the window sign and the panel sign. Mr.
Layer said he had no comment on the panel sign. However, he asked the applicant what he
was trying to achieve for the window sign. The applicant stated he was trying to replicate
what was previously there using a different color. Mr. Layer said the way it shows it
doesn’t seem to have any space between where the verticals are and the sign. The applicant
confirmed that it would step off the edge of the verticals. Ms. Hanley concurs with Mr.
Layer's comment. They discuss what conditions to add to the motion.
Mr. Cheselka stated he prefers the red lettering to be green. The applicant said they were
referencing the Italian flag. Ms. Hanley suggested adding a green stripe on the top and
the bottom to give it a flag look. Ms. Hanley and Mr. Layer noted they were okay with the
applicant’s request. The board continued to discuss the colors and options.
Mr. Layer made a motion to approve the request for a new storefront sign and window sign
for Nozzo Pazzo, located at 122 Branch Rd SE, Docket No. PF-752028-BAR, in the C-2,
General Commercial zoning district, as fellow:
• The storefront sign is to be approved as submitted.
• The window sign letters to stop within 3 inches of any vertical they are adjacent to.
Motion: Mr. Layer
Second: Ms. Hanley
Ayes: 4
Nays: 0
Absent: Mr. Baldwin
Motion Carried
Long & Foster - 438 Maple Ave E - Signs
Item No. 3: Request for approval of new sign, located at 438 Maple Ave E, Docket No.
PF-758995-BAR, in the C-1, Local Commercial zoning district, filed by Gary Brent, MG
Permit LLC., project contact.
Gary Brent – 19187 Foggy Bottom Rd Bluemont, VA 20135 – was the representative for
the application.
Mr. Brent described the request for the new sign. He provided the correct color sample,
white 7005, which was misrepresented on the plans at the last meeting. He also submitted
Town of Vienna Page 3 Printed on 8/29/2022
Board of Architectural Review Meeting Minutes July 21, 2022
the color 7004 above 7005 and the color 7006 below 7005, as requested by the board. Mr.
Brent confirmed where each color would be applied. Mr. Cheselka wanted confirmation on
the kelvins and lumens levels, and Mr. Brent confirmed the kelvins level is 3500 and the
lumen level is 150. With the color clarifications and the sign that was presented, a motion
was made.
Ms. van Doorn made a motion to approve the request of the new sign located at 438 Maple
Ave E, Docket No. PF-758995-BAR, in the C-1, Local Commercial zoning district, filed by
Gary Brent, MG Permit LLC., project contact with the sign specification shown on
drawing 1 of 1.
Motion: Ms. van Doorn
Second: Ms. Hanley
Ayes: 4
Nays: 0
Absent: Mr. Baldwin
Motion Carried
Diane T. Salon - 434 Maple Ave E - Signs
Item No. 4: Request for approval of new sign, located at 434 Maple Ave E, Docket No.
PF-759099-BAR, in the C-1, Local Commercial zoning district, filed by Gary Brent, MG
Permit LLC., project contact.
Gary Brent – 19187 Foggy Bottom Rd Bluemont, VA 20135 – was the representative for
the application.
Item No. 4 was part of item No.3
Ms. van Doorn made a motion to approve the new sign located at 434 Maple Ave E, Docket
No. PF-759099-BAR, in the C-1, Local Commercial zoning district, filed by Gary Brent,
MG Permit LLC., project contact as depicted on the sign drawing.
Motion: van Doorn
Second: Ms. Hanley
Ayes: 4
Nays: 0
Absent: Mr. Baldwin
Motion Carried
New Business
Truist - 440 Maple Ave E - Signs
Item No. 5: Request for approval of new signs, located at 440 Maple Ave E, Docket No.
PF-803362-BAR, in the C-1, Local Commercial zoning district, filed by Gary Brent, MG
Permit LLC., project contact.
Gary Brent – 19187 Foggy Bottom Rd Bluemont, VA 20135 – was the representative for
the application.
Mr. Brent stated the application is for Truist bank. He provided a summary of the signs.
Sign (No2) has a 12.99 sq ft internally illuminated white face channel letter with 150
lumen level and 3500 K temperature that will be located on the storefront. The ATM sign
Town of Vienna Page 4 Printed on 8/29/2022
Board of Architectural Review Meeting Minutes July 21, 2022
(No3) will be attached to the surround of the ATM once the ATM gets approved for the
exterior modification. Additionally, there are two directional signs that are not
illuminated. Sign (N10) is 2 sq ft; that will lead people around the bank to the Drive-Thru,
and sign (N11), which is single-sided, will turn the corner of the Drive-Thru. The
Drive-Thru canopy are open/closed signs (standard Drive-Thru signs) and a clearance bar
for big trucks. Mr. Brent and Mr. Layer discussed the color samples to clarify which
colors belonged to each sign. Mr. Layer stated the presentation was well put together and
that the colors work well.
Ms. Hanley noted she didn’t see a rendering or a picture of the existing building on the
documents provided. Mr. Brent stated they did not provide a photo.
Mr. Layer made a motion to approve the new sign located at 440 Maple Ave E, Docket No.
PF-803362-BAR, in the C-1, Local Commercial zoning district, filed by Gary Brent, MG
Permit LLC, be approved as submitted.
Motion: Mr. Layer
Second: Ms. Hanley
Ayes: 4
Nays: 0
Absent: Mr. Baldwin
Motion Carried
Eastern Business Machines - 226 Dominion Rd NE - Exterior Modification
Item No. 6: Request for approval of a wall located at 226 Dominion Rd NE, Docket No.
PF-758229-BAR, in the CM, Limited Industrial zoning district, filed by Bryan Park,
Eastern Business Machines, project contact.
Yong Park – 226 Dominion Rd NE Vienna, VA 22180 – was present for the application.
Mr. Park stated the wall was originally 6ft. It was damaged 10 years ago and is currently
3ft. He is requesting approval to add 3 ft to the existing 3 ft to make it a total of 6 ft in
height. Mr. Cheselka and Mr. Layer asked for confirmation that he would not add another
new wall to the existing wall and would only add 3ft to the current 3 ft, and Mr. Park
confirmed. Mr. Layer asked if he would face it with a cement system and paint it. Mr. Park
replied correct. He asked the applicant if he had a color, to which the applicant responded
gray
Moreover, he asked what type of system he would use on the wall, such as the materials
and how it is applied. Ms. Hanley noted that the information Mr. Layer was looking for was
on one of the documents provided. She read what the document stated “Bare concrete
blocks will be encased in a layer of high strength concrete to create a smooth prepped
surface. (High Strength cement REF IMG B) . Enclosed and prepped wall surface will be
painted using tinted exterior paint and primer. The color will be light grey”. They
specified Everlast Satin Base 4 Enamel Tintable Latex Exterior Paint + Primer.
Ms. Hanley asked Ms. Abaied for clarification on the submitted site plan. She wondered if
there was an existing easement. The applicant confirmed the wall sits in the easement. The
discussion on the easement continued. Mr. Layer asked the applicant if the sack creek
was being used to finish the block wall. He asked Mr. Park what product he was referring
to. He stated he was asking because, in many cases, if you barge a wall, you put expanded
mesh, and he wondered how it would bond in this case. He explained that a barge wall
usually uses subgrade, stucco could be above grade and have various systems in how they
attach. He stated that he didn’t understand the applicant’s form of attachment. Mr. Park
Town of Vienna Page 5 Printed on 8/29/2022
Board of Architectural Review Meeting Minutes July 21, 2022
said they would use stucco directly on the stone and then paint it. The board discussed the
treatment difference between the existing wall and the new addition to the wall, along with
some concerns.
Ms. Hanley asked what was on the other side of the wall. Ms. Abaied stated she believes it
was residences, which is why there is a requirement for the 6ft wall due to the two
different zones. Ms. Hanley then asked if the finish would be on both sides of the wall. The
applicant said yes. She asked how the top of the wall was going to be capped. Mr. Layer
clarified no cap; it will be all monolithic. The board continued the discussion.
Mr. Layer made a motion to approve the request for a wall located at 226 Dominion Rd NE,
Docket No. PF-758229-BAR, in the CM, Limited Industrial zoning district, filed by Bryan
Park, Eastern Business Machines with the following stipulation:
• The material covering the new and existing wall portion be monolithic on all vertical and
horizontal surfaces.
• The face of the existing wall will be sanded and finished to match the new product, so the
bonding is consistent.
• Masonry primer is put on before the finished coats.
Motion: Mr. Layer
Second: Ms. Hanley
Ayes: 4
Nays: 0
Absent: Mr. Baldwin
Motion Carried
Glyndon Park - 300 Glyndon St NE - Exterior Modification
Item No. 7: Request for approval of exterior modifications for Glyndon Park Bathrooms,
located at 300 Glyndon St NE, Docket No. PF-804263-BAR, in the RS-16/PR, Residential
and Park and Recreational zoning district, filed by Leslie Herman, Director of Parks and
Recreation, project contact.
Leslie Herman & Tommy Staats – 320 Glyndon St NE Vienna, VA – were present for the
application.
Ms. Herman stated Mr. Staats approached the Parks Recreation Department a while ago
wanting to make exterior modifications to the bathroom located at Glyndon park. The
modifications will include replacing the roof with a hip roof, exterior modifications to the
walls, the exterior brick will consist of field stone veneer and stucco, and replacing the
asphalt and cement around the perimeter of the building with a wide cement and flagstone
walkway. She noted it would compliment the dugouts on the baseball fields. Ms. Herman
said that Mr. Staats was doing this at no cost to the town.
Ms. Van Doorn stated she believes it will look great. She asked Mr. Staats if he was also
working on the interior of the bathrooms. He replied he wanted to work on the exterior
modification first and see how it looked. Ms. Herman commented she placed a request
through the Capital Improvement Project with the town for interior improvements, and
they will see how Council approves those requests as they work through that process with
them.
Ms. Hanley voiced her concern about any adjustments required on the width of the
doorways due to future interior changes. She stated now would be a good time to widen the
door. She also noted that the ADA code is required for any modification. She believes the
Town of Vienna Page 6 Printed on 8/29/2022
Board of Architectural Review Meeting Minutes July 21, 2022
ADA code has changed since the building was built. She mentioned it would be good if they
encompass all the design changes to avoid redoing the work that Mr. Staats generously
offered to the town. Ms. Herman replied, saying she measured the bathroom doorways and
what looks like a handicap stall, which are 34 inches in width. Ms. Hanley said she was
unsure what the requirements were, and Ms. Herman stated she believed they were 28- 34
inches in width. Ms. Hanley pointed out that she wasn’t sure if the ADA was making
service bars have a requirement. Mr. Staats stated that was a good question. He said they
still have many details they have to review. They want to ensure the board is okay with the
roof line, the stone, stucco, etc. He provided some examples of what they would need to
adjust later on. Lastly, Ms. Hanley asked if he was completely removing the old roof, to
which Mr. Staats replied yes. Ms.Hanley asked if he would be providing structures and
plans. Mr. Staats stated they have the trusses' drawings, and it would be a slate roof. Ms.
Hanley replied the engineering trusses were fine. She wanted to ensure they weren’t
missing any details since this project would be approved on a county level.
Mr. Layer stated the stucco system was clear. He asked about the paint for the stone. Mr.
Staats said the stucco is made in a factory and the substance of the stucco is the color.
There is no paint on it; it will not peel, and it will last a long time. Mr. Layer pointed out
the board was provided with two choices, and Mr. Staats suggested they go with the
factory-made stucco with the color the board recommends. The board continued to discuss
the Benjamin Moore colors Bleeker Beige HC-80 and Tapestry Beige with the applicant.
After the discussion, the applicant decided to move forward with the color Bleeker Beige.
Mr. Layer inquired for information about the stone. Mr. Staats stated it is a local stone, the
same stone they used for the dugouts. Mr. Layer asked if it was a greyish or warm tone.
Mr. Staats replied they have different colors. They reviewed the various options. The
applicant later stated that he preferred the blue/mixed option. Ms. Herman said if they
decide to blend the stones, they will go with blue. Mr. Layer commented that the cooler
colors would match better if they went with the blue. Ms. Herman asked Mr. Layer if the
stones favored the cooler colors more than the warm ones; could she go directly to him, or
would she have to come to the board for approval? Mr. Layer replied she would have to
return to the board if they change their minds. The board explained to the applicants that
they could request any changes with a revision to the project. They continued the
discussion with some examples of how it can be submitted.
Furthermore, Mr. Layer pointed out that the truss and roof diagrams were different. He
explained the discrepancy he noticed between the two diagrams. Mr. Staats recommended
using the engineering drawing. They discussed the roof flair and slate. The applicant
decided to move forward with the slate option shown on the truss drawings. Mr. Layer
noted the drawing would have to be revised for clarification.
Lastly, Mr. Layer asked about the roofing system. He requested information on the
materials that will be used. Mr. Staats stated he would be using bituthene on the roof. He
then asked about the sheating, and the applicant said 5/4 x 8 was adequate. Additionally, he
asked about the fascia board. Mr. Staats replied it would be plastic. They discussed the
system for the soffit returning to the board for review since there was no written
information on it and the way the stone would be attached. Mr. Cheselka commented he
likes the blend with the stone. He asked about the recessed lighting having 950 lumens.
He asked the applicant if the lumen level was a total amount for the entire project or per
light. Mr. Staats clarified it is per light. He stated that it has five different levels it can
switch to. The board discussed the recessed lighting and the color black on the door.
Mr. Layer made a motion to approve the request for exterior modifications for Glyndon
Park, located at 300 Glyndon St NE, Docket No. PF-804263-BAR, in the RS-16/PR,
Town of Vienna Page 7 Printed on 8/29/2022
Board of Architectural Review Meeting Minutes July 21, 2022
Residential and Park and Recreational zoning district, filed by Leslie Herman, Director of
Parks and Recreation, Bathrooms as follows:
• The roof shape will not have the flair and will follow what has been identified on the truss
drawings.
• The color approved for the stucco is the Bleecker Beige HC-80.
• The stone color will be a field stone blend color with a dry lay look to the exterior.
• The roof material will be 5/8 sheathing OSB with a bithuthene layer over the entire roof
and shingle with the slate roof.
• The fascia board will be 5/4 x 8 PVC all the way around.
• The doors are to be painted black.
• The system for the soffit was not approved and will require a follow-up.
• A revised set of drawings to illustrate the roof's design change.
Motion: Mr. Layer
Second: Ms. van Doorn
Ayes: 4
Nays: 0
Absent: Mr. Baldwin
Motion Carried
Ms. Hanley commented to Ms. Herman that work sessions are very informative and it
helps the applicants and their working partners to grasp an idea of what the board looks
for when reviewing the applications.
Brusters Real Ice Cream - 237 Maple Ave E - Exterior Modification
Item No. 8: Request for approval of exterior modifications for Bruster's Real Ice Cream,
located at 237 Maple Ave E, Docket No. PF-760418-BAR, in the C-2, General Commercial
zoning district, filed by Michael Wood, Clay Construction, project contact.
Michael Wood – 1632 Wainwright Dr. Reston, VA 20190 – was the representative for the
application.
Mr. Wood said they are modifying the existing storefront with a new clear anodized
storefront that will include three sliding walk-up windows. Each window will have a red
counter. The bottom panels for the storefront will be a clear glass spandrel panel with a
ceramic coating on the interior face. The front door will be moved to the right-hand side
away from the angle portion, which will be a walk-up window. Mr. Wood commented the
signage would be submitted separately by a sign company next month.
Ms. van Doorn stated she is familiar with the Red Corian material and believes it will be a
nice accent piece. Ms. Hanley asked how they would be serving the customers and will the
customers be coming into the store. Mr. Wood replied the customers would not be coming
into the store, and the business model was “to go.” Ms. Hanley inquired for clarification
on the three-to-go windows. She wanted to know what services each window would provide.
Mr. Wood stated every franchise runs its business differently. He provided different
scenarios on how the windows can be used. He said he wasn’t sure how this business would
operate with the order windows and pick-up windows. He mentioned the possibility of
having two windows as an order window and pick up and the third window as pick up only.
Ms. Hanley asked about the counter – she wanted to make sure the intent for the counter
was only for walk-up and not for seating since the board would have to review the chairs,
colors, etc. Mr.Wood confirmed the counter would only be used for walk-up services. Ms.
Hanley then mentioned she wasn’t aware if the ADA required a lower counter. She asked
the applicant if they had a lower counter in the plans or if all the counters were already at a
Town of Vienna Page 8 Printed on 8/29/2022
Board of Architectural Review Meeting Minutes July 21, 2022
low height. Mr. Wood replied that elevation 2 (shown on the PowerPoint) shows an ADA
counter at a lower level by the door. Lastly, they discussed how the shop would operate on
sweltering days.
Mr. Layer stated the concept was interesting. He commented on the possibility of someone
wanting to sit down. He asked if they had any thoughts on placing chairs outside. The
applicant replied not at the moment. The business wants to figure out how the business
operations work. Mr. Layer recommended looking into providing benches and using the
space they have available by the wall. Ms. Abaied clarified to the applicant that he would
only need to revise this application for the benches. Mr. Cheselka asked for clarification
on the sign. He said it was showing on the front elevation but was not on the agenda for
approval. Mr. Wood confirmed that was correct.
Ms. Hanley made a motion to approve the request for exterior modifications for Bruster's
Real Ice Cream, located at 237 Maple Ave E, Docket No. PF-760418-BAR, in the C-2,
General Commercial zoning district as presented.
Motion: Ms. Hanley
Second: Ms. van Doorn
Ayes: 4
Nays: 0
Absent: Mr. Baldwin
Motion Carried
Restore Hyper Wellness and Cryotherapy - 214 Maple Ave W - Exterior
Modification
Item No. 9: Request for approval of exterior modifications for Restore Hyper Wellness and
Cryotherapy, located at 214 Maple Ave W, Docket No. PF-780749-BAR, in the C-1A,
Special Commercial zoning district, filed by Dan Kiser, X-Pediters Plus Inc., project
contact
Irfan Aly – 112 Krog Street NE Atlanta, GA 30307 – was the representative for the
application.
Mr. Aly described the request. He stated that they are modifying what used to be HSBC
bank into restore cryotherapy. He said they would change the storefront; the single door
will be going to the ATM area, and they’re getting rid of the double door and shifting over
to a new single door. The storefront will match the existing storefront. Mr. Aly commented
the signage permit would be submitted separately.
Mr. Layer did not have any questions, but he did comment that the colors matched very
well.
Mr. Aly stated he forgot to mention that they would place a window film on the last window.
Mr. Cheselka asked if there would be writing on the film, and the applicant replied no. Ms.
van Doorn wondered whether the film would make the window opaque, and the applicant
stated yes, you would not be able to see inside.
Ms. van Doorn made a motion to approve the request for exterior modifications for Restore
Hyper Wellness and Cryotherapy, located at 214 Maple Ave W, Docket No.
PF-780749-BAR, in the C-1A, Special Commercial zoning district.
Motion: Ms. van Doorn
Second: Ms. Hanley
Town of Vienna Page 9 Printed on 8/29/2022
Board of Architectural Review Meeting Minutes July 21, 2022
Ayes: 4
Nays: 0
Absent: Mr. Baldwin
Motion Carried
Smoothie King - 258 Maple Ave E - Signs
Item No.10: Request for approval of signs for Smoothie King, located at 258 Maple Ave E,
Docket No. PF-781767-BAR, in the C-2, General Commercial zoning district, filed by
William Rosenberg, Econo Sign Inc., project contact
William Rosenberg – 21097 Mossy Glen Terrace Ashburn, VA 20147 – was representing
the application.
Mr. Rosenberg stated the proposed sign would consist of new illuminated channel letters
saying “SMOOTHIE KING” on the top. They would also have an illuminated hanging
window sign. He then confirmed the lumen levels. The channel letters are 136.7 lumens,
and the hanging window sign is 47.2 lumens. He asked for clarification on what is allowed
for lumen levels, and Ms. Abaied confirmed that the board like to see 150 lumens per sign.
Mr. Layer commented on how well the sign coincides with the other signs. He stated he
likes the low-profile light as an individual channel letter. He said he thinks his logo is
intriguing – he asked if it was people, and the applicant stated it was a crown. Mr. Layer
had no further comments or questions.
Mr. Cheselka commented on the hanging window sign color. The board discussed the
signs and colors. The applicant confirmed the channel letters are white and metallic; the
hanging sign is white plex red translucent with dark paint to match PMS Cool Grey and
metallic silver. He said the crown would be red, and the channel sign would be all white.
Mr. Layer made a motion to approve the request for signs for Smoothie King, located at
258 Maple Ave E, Docket No. PF-781767-BAR, in the C-2, General Commercial zoning
district, filed by William Rosenberg, Econo Sign Inc as submitted.
Motion: Mr. Layer
Second: Ms. Hanley
Ayes: 4
Nays: 0
Absent: Mr. Baldwin
Motion Carried
Veterinary Surgical Center - 124 Park St SE - Exterior Modification
Item No 11: Request for approval of exterior modifications for Veterinary Surgical
Centers Rehabilitation, LLC, located at 124 Park St SE, Docket No. PF-803371-BAR, in
the C-1Local Commercial zoning district, filed by Sergio Sur, The Princeton Companies,
project contact.
Sergio Daniel Sur & Dr. Taylor – 2 Cardinal Park Drive SE Leesburg, VA – were the
representatives for the application.
Mr. Sur gave an overall review of the proposed changes, which consist of the following: an
electrical upgrade, new transformer enclosure, temporary demolition and rebuilding of
the left side exterior wall to fit an MRI, installation of a louver for the new mechanical unit,
and lastly the demolition of an existing rear store window and door for a new CT cabinet
Town of Vienna Page 10 Printed on 8/29/2022
Board of Architectural Review Meeting Minutes July 21, 2022
and meter. Mr. Sur stated the change was due to the notification from the Town of Vienna
saying they were not allowed to place a new power pole in front of the building. He noted
Dominion Energy could not supply the electrical power needed to support the new MRI due
to all existing poles being maxed out and not having space available to support the project
from the existing poles. He said Dominion’s direction was to install a new pole at the front
of the building. Mr. Sur said that after the meetings with the Town of Vienna, the only
alternative was to place a new transformer on the rear of the building. He stated the
enclosure would be bigger and nicer. He noted the gate would be metal and the color of the
canopy and that they would use the same veneer brick.
Ms. Hanley voiced her concern about the dumpster. She wanted confirmation that the
dumpster would never hit the transformer or the generator. Mr. Sur stated they plan to
place bollards. He further explained that they would have a bollard on the back to protect
the wall and one on the side to protect the generator. Ms. Hanley asked about the
transformer. The applicant replied a bollard wouldn’t be needed for the transformer due to
the distance. Ms. Hanley then commented she wanted the applicant to understand that the
use of the dumpster needs to be confined to the dumpster. They discussed the issues
caused by piled trash and opened dumpsters. Ms. Hanley asked for clarification on the
additional alterations. Mr. Sur explained the proposed changes to the board. Mr. Layer
stated the project's main focus was the transformer enclosure, which appeared to be
in-scale. He provided his understating of what was being proposed. He noted his preference
for having three bollards vs. two.
Ms. Hanley made a motion to approve the request for exterior modifications for Veterinary
Surgical Centers Rehabilitation, LLC, located at 124 Park St SE, Docket No.
PF-803371-BAR, in the C-1Local Commercial zoning district with the addition of a 3rd
bollard inside the dumpster enclosure.
Motion: Ms. Hanley
Second: Ms. van Doorn
Ayes: 4
Nays: 0
Absent: Mr. Baldwin
Motion Carried
Regular Meeting
The board discussed the following:
• Work session on July 27, 2022, at 8:00 am for Code Create Sign Regulations.
• Work session on August 5, 2022, at 8:00 am for Code Create Church Street Vision.
• Board discussed changes to the agenda format.
Meeting Adjournment
Mr. Layer made a motion to adjourn. The meeting adjourned at 9:52 pm.
Respectfully Submitted,
Yaska Camacho Castillo
Board Clerk
THE TOWN OF VIENNA IS COMMITTED TO FULL COMPLIANCE WITH THE AMERICANS WITH DISABILITIES ACT
STANDARDS. TRANSLATION SERVICES, ASSISTANCE OR ACCOMMODATION REQUESTS FROM PERSONS WITH DISABILITIES
ARE TO BE REQUESTED NOT LESS THAN 3 WORKING DAYS BEFORE THE DAY OF THE EVENT. PLEASE CALL (703) 255-6304,
OR 711 VIRGINIA RELAY SERVICE FOR THE HEARING IMPAIRED.
Town of Vienna Page 11 Printed on 8/29/2022
Board of Architectural Review Meeting Minutes July 21, 2022
Town of Vienna Page 12 Printed on 8/29/2022
Agenda
Town of Vienna 127 Center Street South
Vienna, Virginia 22180
p: 703.255.6341
TTY 7111
Meeting Agenda
Board of Architectural Review
Thursday, July 21, 2022 7:30 PM COUNCIL CHAMBERS-VIENNA TOWN HALL
Roll Call
Approval of the Minutes
Old Business
BAR22-338 Yellow Diner- 501 Maple Ave W- Exterior Modification
Attachments: 01 - sr_PF-795690-BAR - 501 Maple Ave W - The Yellow Diner
02 - 501 Maple Ave W - The Yellow Diner - Application and Authorization
03 - 501 Maple Ave W - The Yellow Diner - Rendering, Site, Landscape, Materials
BAR22-337 Nozzo Pazzo - 122 Branch Rd SE - Signs
Attachments: 01 - sr_PF-752028-BAR - 122 Branch Rd SE - Nozzo Pazzo
02 - 122 Branch Rd SE - Nozzo Pazzo - Application and Authorization
03 - 122 Branch Rd, SE - Nozzo Pazzo - New Exterior Sign with Scaled Dimensions
04 - 122 Branch Rd, SE - Nozzo Pazzo - New Exterior Sign
05 - 122 Branch Rd, SE - Nozzo Pazzo - Window Sign Before & After
BAR22-335 Long & Foster - 438 Maple Ave E - Signs
Attachments: 01 - sr_PF-758995-BAR - 438 Maple Ave E - Long and Foster - Sign
02 - 438 Maple Ave E - Long & Foster - Sign Application & Authorization
03 - 438 Maple Ave E - Long and Foster - Storefront Rendering
04 - 438 Maple Ave E - Long & Foster - Sign Plan
BAR22-336 Diane T. Salon - 434 Maple Ave E - Signs
Attachments: 01 - sr_PF-75099-BAR - 434 Maple Ave E - Diane T. Salon - Sign
02 - 434 Maple Ave E - Diane T. Salon - Application & Authorization
03 - 434 Maple Ave E - Diane T. Salon - Storefront
04 - 434 Maple Ave E - Diane T Salon - Sign Plan
New Business
Page 1 Printed on 7/18/2022
Board of Architectural Review Meeting Agenda July 21, 2022
BAR22-342 Truist - 440 Maple Ave E - Signs
Attachments: 01 - sr_PF-803362-BAR - 440 Maple Ave E - Truist - Signs
02 - 440 Maple Ave E - Truist - Application and Owner Approval
04 - 440 Maple Ave E - Truist - Site and Elevations - Signs
05 - 440 Maple Ave E - Truist - Front sign specs
06 - 440 Maple Ave E - Truist - Code Analysis
BAR22-339 Eastern Business Machines - 226 Dominion Rd NE - Exterior Modification
Attachments: 01 - sr_PF-758229-BAR - 226 Dominion Rd NE - Eastern Business Machines - Wall
02 - 226 Dominion Rd NE - Eastern Business Machines - Application & Authorization
03 - 226 Dominion Rd NE - Eastern Business Machines - Wall Rendeirng and Spec sheets
04 - 226 Dominio Rd NE - Eastern Business Machines - current wall height
05 - 226 Dominion Rd NE - Eastern Business Machines - originall wall
06 - 226 Dominion Rd NE - Eastern Business Machines - Site Plan
BAR22-340 Glyndon Park - 300 Glyndon St NE - Exterior Modification
Attachments: 01 - sr_PF-80426-BAR - 300 Glyndon St NE - Glyndon Park
02 - 300 Glydnon St NE - Glyndon Park - Application and Authroization
03 - 300 Glyndon St NE - Glyndon Park - Existing Conditions
04 - 300 Glyndon St NE - Glyndon Park - Site Plan
05 - 300 Glyndon St NE - Glyndon Park - Elevations with materials & Rendering
06 - 300 Glyndon St NE - Glyndon Park - Materials
07 - 300 Glyndon St NE - Glyndon Park - Lighting layout
08 - 300 Glyndon St NE - Glyndon Park - Engineered Roof Drawings
BAR22-341 Brusters Real Ice Cream - 237 Maple Ave E - Exterior Modification
Attachments: 01 - sr_PF-760418-BAR - 237 Maple Ave E - Brusters Real Ice Cream
02 - 237 Maple Ave E - Brusters Real Ice Cream - Applicaiton & Authorization
03 - 237 Maple Ave E - Brusters Real Ice Cream - Floorplan and Elevations
04 - 237 Maple Ave E - Brusters Real Ice Cream - Material Samples
05 - 237 Maple Ave E - Brusters Real Ice Cream - Site Photos
Page 2 Printed on 7/18/2022
Board of Architectural Review Meeting Agenda July 21, 2022
BAR22-343 Restore Hyper Wellness and Cryotherapy - 214 Maple Ave W - Exterior
Modification
Attachments: 01 - sr_PF-780749-BAR - 214 Maple Ave W - Restoer Hyper Wellness and Cryotherapy
02 - 214 Maple Ave W - Restore Hyper Wellness and Cryotherapy - Applicaiton and Authorization
03 - 214 Maple Ave W - Restore Hyper Wellness and Cryotherapy - Elevations
04 - 214 Maple Ave W - Restore Hyper Wellness and Cryotherapy - Storefront Manufacture Specs
05 - 214 Maple Ave W - REstore Hyper Wellness and Cryotherapy - Door Manufacturer Specs
06 - 214 Maple Ave W - Restore Hyper Wellness and Cryotherapy - Glass finish Manufacturer Specs
BAR22-345 Smoothie King - 258 Maple Ave E - Signs
Attachments: 01 - sr_PF-781767-BAR - 258 Maple Ave E - Smoothie King
02 - 258 Maple Ave E - Smoothie King - Application and Authorization
03 - 258 Maple Ave E - Smoothie King - Elevation and Sign Details
BAR22-344 Veterinary Surgical Center - 124 Park St SE - Exterior Modification
Attachments: 01 - sr_PF-803371-BAR - 124 Park St SE - Veterinary Surgical Centers
02 - 124 Park St SE - Veterinary Surgical Centers - Application and Authorization
03 - 124 Park St SE - Veterinary Surgical Centers - Memo Scope of Work
04 - 124 Park St SE - Veterinary Surgical Centers - Civil, Electrical, and Tree Preservation Plans
05 - 124 Park St SE - Veterinary Surgical Centers - Elevations
06 - 124 Park St SE - Veterinary Surgical Centers - Rendering - Proposed
07 - 124 Park St SE - Veterinary Surgical Centers - Rendering - Current Conditions
08 - 124 Park St SE - Veterinary Surgical Center - Dumpster Enclosure
Regular Meeting
Meeting Adjournment
THE TOWN OF VIENNA IS COMMITTED TO FULL COMPLIANCE WITH THE AMERICANS WITH DISABILITIES ACT
STANDARDS. TRANSLATION SERVICES, ASSISTANCE OR ACCOMMODATION REQUESTS FROM PERSONS WITH
DISABILITIES ARE TO BE REQUESTED NOT LESS THAN 3 WORKING DAYS BEFORE THE DAY OF THE EVENT.
PLEASE CALL (703) 255-6304, OR 711 VIRGINIA RELAY SERVICE FOR THE HEARING IMPAIRED.
Page 3 Printed on 7/18/2022
Get email alerts for Vienna
A daily email when new agendas and minutes are posted.