May 11, 2022
1. CALL TO ORDER
Chairman Curry called the meeting to order at 6:00 p.m.
2. PLEDGE OF ALLEGIANCE AND ROLL CALL
Chairman Curry led in the Pledge of Allegiance.
Members present: Linda Palardy, Diana Adams, Jack Masson, Sandy Carbon,
Donald Curry, Linda Smura. Motion made by Chairman Curry to excuse Kimberly McGibany,
seconded by Member Adams, Motion carried 6-0.
Also present: Council Liaison Daniel McDow, Assistant City Manager Tom Bradford, Parks
& Recreation Director Richard Boprey, and Special Projects Coordinator Sandi Wood.
3. INTRODUCTION OF GUESTS
Chairman Curry acknowledged City Council Liaison Daniel McDow.
4. APPROVAL OF MINUTES FROM MAR 9, 2022
Chairman Curry advised that the meeting minutes from March 9, 2022 failed to include the
statement that Chairman Curry toured the parks and provided a list of park items that
needed attention to the Parks and Recreation Director Boprey. Member Masson made a
motion to accept the minutes of the March 9, 2022 meeting with corrections, seconded by
Member Palardy. Motion carried 6-0
5. NEW BUSINESS
A. Review and recommendation of playground for Clements Wood Park
Parks and Recreation Director Boprey provided 3 quotes from GameTime, Burke and Rep
Services. Parks & Recreation Director Boprey mentioned that none of the quotes included
mulch but advised the City would absorb the cost of that as we already have a good
relationship with mulch vendor. Director Boprey recommended the GameTime as they will
Parks and Recreation Advisory Board
Page 2
breakdown, haul away and replace swings, the other companies didn’t offer that service.
One company is over budget by 10k, and the third company wanted to include ropes in
components of the playground. Ropes are not recommended as they can be a safety and
liability issue.
A member asked about the border to playground, Director Boprey advised we would keep
current border. Leaving current borders in place will allow for growth and ramp access to a
future pavilion connected to the playground and restrooms via sidewalk. Chairman Curry
asked about permitting and plans. Director Boprey advised the City would take care of
those at no cost to the company. Also once the contract is signed, we should not be
charged extra for the rising price of gas. Member Masson asked about shade for the
playground. Director Boprey advised there are plenty of trees around. Also asked if mulch is
ADA compliant. It is compliant and will be measured on a regular basis and more added as
necessary. A member asked if all playground equipment was ADA compliant and still visible
for police to see through the playground area. A member asked how far the playground
equipment from the ramp to the edge of playground. Director Boprey advised there will be
sidewalks and they will come to the edge of the playground. Member Adams made a
motion to recommend GameTime for the purchase and installation of the playground at
Clements Wood Park. Member Carbon seconded. Motion passed 6-0.
B. Receive information provided for Comprehensive plan (walking/bike trails)
Assistant City Manager Bradford advised that the information is provided in the
Comprehensive Plan (undergoing revision) for the new Town Center. The planners
prepared a report referencing elements of the Comprehensive Plan that addresses
interconnectivity for sidewalks and trails. An attachment provided a diagram where
sidewalks/trails were indicated. This is a no action item and used for information only.
City Council Liaison McDow recommended that we address this in the future. Are the
outlines included in the package existing or proposed? They are both. Also indicated they
are not all owned by the City. A member suggested we could use mile markers for existing
paths that show an overall connectivity. Another member stated that it would be a good
idea to include water stations and a small shelter of some description along the path to offer
cover for walkers/bikers from the weather. A member asked Mr. Bradford about a
completion date and there is not one at this time. Chairman Curry advised that the Board
would accept the information provided.
C. Parks Master Plan
Assistant City Manager Bradford provided a hand out and advised one of the discussions in
City Council meetings is how to achieve “next level” for our parks. Staff recommended a
Parks Master Plan for our existing parks by reaching out to the community, current planners
and developers to get an idea of the improvements and following the developers 10 step
process. Assistant City Manager Bradford recommend the board move forward to approve
budgeting for master plan for next fiscal year and move forward with Master Plan for the
Parks. Included in the handout is a recommend dollar amount and timeline. A member
asked if Adkins was the recommended developer or if it needed to go out for RFQ.
It is recommended to stay with Adkins.
Parks and Recreation Advisory Board
Page 3
6. PARKS AND RECREATION UPDATES
A. Receive update on splash pad.
Director Boprey advised on the status of the splash pad. During the Building Department
inspection of the structure the required additional grounding to help prevent electrical shock.
There was a change order issued in the amount of $4,800.00 to dig trenches and install the
grounding wire and additional concrete. Director Boprey then advised the installation of the
electronics will be after the shade structure is up and then the flooring will be reinstalled.
After the construction of shades and flooring, the components will need to be cleaned and
installation/testing of the remainder of the components. A member asked if there was
anything we can do to prevent lightning from striking twice. Mr. Bradford advised that we
have added surge protectors on all equipment and there are lightning rods placed
strategically throughout the city, but no, there is nothing that can prevent another lightning
strike, but we are continually looking for improvements.
B. Receive updated I-95 status
Director Boprey advised that the company that took care of the mowing at I-95, DBI, went
bankrupt and a new company has been contracted by the FDOT. Director Boprey has a
FDOT approved contractor, Midwestern Construction to trim the palm trees on the slopes.
Midwestern have come out to spray herbicide on the trees and mulch the base of the trees.
The parks maintenance crew has cleaned and hauled several trailer loads of garbage in the
absence of the FDOT contractor. We are waiting on the new FDOT contractor to mow the
I-95 area.
C. Receive update of Board provided list of park Items
Director Boprey advised that the Parks and Recreation maintenance crew had completed
most items on the list and advised the Chairman to come to speak with him about any
additional items.
6. PUBLIC COMMENTS
There were no public comments.
7. ADJOURNMENT
There being no further business, Member Carbon made a motion to adjourn the meeting.
Seconded by Member Adams. Motion carried 6-0.
The meeting adjourned at 7:32 p.m.
The next scheduled meeting will be July 13, 2022 at 6 p.m.
Agenda
MAYOR
Hal J. Rose
Recreation Department
DEPUTY MAYOR Rich Boprey, Parks & Recreation
Andrea Young Director
Veterans Memorial Complex
COUNCIL MEMBERS 2285 Minton Road
Daniel Batcheldor West Melbourne, FL 32904
Pat Bentley Phone: (321) 837-7779
Daniel McDow Fax: (321) 768-2390
John Dittmore www.westmelbourne.org
Stephen Phrampus
PARKS AND RECREATION ADVISORY BOARD
AGENDA
May 11, 2022, at 6:00 p.m.
1. CALL TO ORDER
2. PLEDGE OF ALLEGIANCE AND ROLL CALL
3. APPROVAL OF MINUTES FROM MARCH 9, 2022
4. INTRODUCTION OF GUESTS
5. NEW BUSINESS
A. Review and recommendation of playground for Clements Wood playground
B. Receive information provided for Comprehensive plan (walking/bike trails)
C. Parks Master Plan
6. PARKS & RECREATION UPDATES
A. Receive update on splash pad
B. Receive updated I-95 status
C. Receive update of Board provided list of park items
7. PUBLIC COMMENTS
8. ADJOURNMENT
2022 scheduled meetings July 13, Sept 14, Nov 9
All persons wishing to be heard should appear in person at these hearings or send written comments to the City Clerk.
All persons and parties are hereby advised that if they should decide to appeal any decision made by the City with respect
to any matter considered at the public meeting or hearing described in this notice, they will need a record of the
proceedings, and for such purpose, said person or party may need to ensure that a verbatim record of the proceedings
is made, which record includes the testimony and evidence upon which the appeal is to be based (Chapter 286, Florida
Statutes). In compliance with American with Disabilities Act (ADA), anyone who needs a special accommodation for this
meeting should contact the City’s ADA coordinator at 837-7774 at least 48 hours in advance of this meeting.
MAYOR
Hal J. Rose
Recreation Department
DEPUTY MAYOR Rich Boprey, Parks & Recreation Director
Andrea Young Veterans Memorial Complex
2285 Minton Road
COUNCIL MEMBERS West Melbourne, FL 32904
Daniel Batcheldor Phone: (321) 837-7779
Pat Bentley Fax: (321) 768-2390
John Dittmore www.westmelbourne.gov
Daniel McDow
Stephen Phrampus
PARKS AND RECREATION ADVISORY BOARD
MINUTES
March 9, 2022
1. CALL TO ORDER
Chairman Curry called the meeting to order at 6:02 p.m.
2. PLEDGE OF ALLEGIANCE AND ROLL CALL
Chairman Curry led in the Pledge of Allegiance.
Members present: Linda Palardy, Diana Adams, Jack Masson, Sandy Carbon,
Donald Curry, Linda Smura and Kimberly McGibany.
Also present: Council Liaison Daniel McDow, Parks & Recreation Director Richard Boprey,
and Special Projects Coordinator Sandi Wood.
3. INTRODUCTION OF GUESTS
Chairman Curry introduced Council Members Andrea Young, Stephen Phrampus and
Assistant City Manager Tom Bradford.
4. APPROVAL OF MINUTES FROM JANUARY 12, 2022
Chairman Curry made a motion to accept the minutes of the January 12, 2022 meeting,
seconded by Member Carbon. Motion carried 7-0
5. NEW BUSINESS
A. Budget for 2022-2023 –Bleachers/Canopy cover at Skate Park
Parks and Recreation Director Boprey advised that citizens had asked for a raised canopy
and bleachers for the skate park and presented a concept of what bleachers and canopy
would look like. Member Palardy made a motion to accept the concept of bleachers and
canopy at the skate park, member McGibany seconded. Motion passed 7-0.
4-1
Parks and Recreation Advisory Board
Page 2
B. Budget for 2022-2023 – New pavilion at Clements Wood Park
Parks and Recreation Director Boprey presented the board with a concept of a pavilion with
water, grill and electric that is similar to the pavilions at the West Melbourne Community
Park. A motion was made by Member Masson to accept the concept of a new pavilion with
water, grill and electric, seconded by Member Adams. Motion passed 7-0
6. PARKS AND RECREATION UPDATES
A. Playground at Clements Wood Park.
Parks and Recreation Director Boprey advised the board that funding in the amount of
$80,000 for a new playground at Clements Wood Park has been approved by the City
Council. Chairman Curry asked if the Recreation Department has contacted the current
playground manufacturer to see if there are replacement parts available instead of replacing
the playground. Director Boprey advised that he had not contacted the manufacturer as the
age of the current playground would not have current parts in stock and any attempt to
repair the playground would create a liability to the City. A motion was made by member
Masson to replace the playground, seconded by member Smura. Motion passed 7-0.
Council Liaison McDow advised that the selected playground would need to come back the
Parks and Recreation Board for selection before presented to Council. Director Boprey
advised that he would be bringing 3 concepts and quotes for playgrounds to the next
meeting to ask for the Board’s recommendation before it is presented to Council for
approval. There was also discussion about a playground at Tallwood Park. Director Boprey
advised that he has future plans for Tallwood Park to expand it as an exercise park with a
walking track and additional workout stations.
B. Parks Maintenance Crew subsidence project at Skate Park
Director Boprey advised that the Parks and Recreation maintenance crew had replaced 15
thousand pounds of top soil and 2 thousand square feet of sod under the top rim of the
skate bowl due to erosion.
6. PUBLIC COMMENTS
Council Liaison Daniel McDow mentioned there is a Special Olympics Recognition that will
be held at the West Melbourne Community Park Amphitheater on March 12, 2022 at 1 p.m.
He also mention there will be a ribbon cutting ceremony at the Water Treatment Facility on
Tuesday March 15 at 10 am. There was a question presented to Council Member McDow
at the Business Advisory Board in reference to trails connected to the canal system. He
believes it is in the comprehensive plan for parks and it should be addressed in upcoming
meetings for a response to the Business Advisory Committee.
7. ADJOURNMENT
There being no further business, Member Masson made a motion to adjourn the meeting.
Seconded by Member Adams. Motion carried 7-0.
The meeting adjourned at 7:06 p.m.
4-2
Parks and Recreation Advisory Board
Page 3
The next scheduled meeting will be May 11, 2022 at 6 p.m.
__________________________ _______________________
Donald Curry, Chairman Richard Boprey, Director,
Parks & Recreation
4-3
AGENDA ITEM
May 11, 2022, Parks and Recreation Advisory
Board Meeting
Approved for Submittal By:
Rich Boprey
_______________________________________________________
Rich Boprey, Parks and Recreation Director
To Be Presented By:
Rich Boprey
_______________________________________________________
Rich Boprey, Parks & Recreation Director
To: Parks and Recreation Advisory Board Members
From: Rich Boprey, Parks & Recreation Director
Date: May 11, 2022
SUBJECT
Review and Recommendation of Playground for Clements Wood Park
RECOMMENDATION
Parks and Recreation Director recommends that the Parks and Recreation Advisory Board:
Review and recommend the preferred playground at Clements Wood Park.
FISCAL IMPACT
Funds were approved in the amount of $80,000 in the 2021-2022 Budget.
5A - 1 May 11, 2022
DISCUSSION
At the March 9, 2022 Parks and Recreation Advisory Board meeting, it was advised that Parks
and Recreation Director would present 3 options for the playground equipment for the Board
to review and recommend what playground they would like to present to the City Council for
approval.
ATTACHMENTS
Attachment 1 – Submission from Gametime
Attachment 2 – Submission from Rep Services
Attachment 3 – Submission from Top Line Recreation
5A - 2 May 11, 2022
ATTACHMENT 1
(GameTime�
GamaT,ma 04/01/2022
c/o Dominica Raa-aatlon Products, Inc. Quota#
P.O. Box 520700 103685-01-01
Longwood, Fl 32752-0700
800-432-0162 • 407-331-0101
Fax: 407-331-4720
www.playdrp.com
Clements Wood Park
City of West Melbourne Ship to Zip 32904
Attn: Rich Boprey
2285 Minton Road
Melboume, FL 32904-4928
Phone: 321-837-7779
rboprey@weatmelbouma.gov
Quantity Part# Dcscnption Unit Price Amount
Removal 5-Star Plus - Removal of Existing Playground Equipment in 5-12 area- $5,300.00 $5,300.00
5-12 System and swings - Includes disposal
RDU GameTtme - Lake TIINi PrimeTrne Package- $56,744.00 $56,744.00
Spring Promo Pricing valid for order received by May 31, 2022
2 12584 GameTnne -Ada Primetime SwingAab, 3 112" Od $876.00 $1,752.00
2 SSB910 GameTima - Belt Seat 3 112" � W/Clevis $325.00 $650.00
2 SSB696 GameTrme - Encl Tot Seat 3 1/2"� High W/Clavis $387.00 $774.00
Sealed 5-Ster Plus - Signed/Sealed FBC 2020 7th Ed Building Code Drawings $1,025.00 $1,025.00
INSTALL 5-Star Plus - Five Star Pus Playground lnstanauon Servicas- $18,550.00 $18,550.00
Performed by a Certified Installer, includes meeting and un/oading delivery truck, signed
comple#on forms, site welktt1rough, 90 day site revisit by installation foreman, and 3-Year Labor
Warranty!
Sub Total $84,795.00
Discount ($20,095.32)
Mllterllll Surcharge $8,410.88
Fnlght $3,722.03
Total $76.832.59
Comments
Top arr of existing EWF by owner. Exisffng 2-5 equipment to remain.
Sije access for construction equipment and staging area must be provided by owner.
T his quote was prepared by Gina Wison, Vice President I Senior Project Manager.
For questions or to order please can - 800-432-0162 ext. 101 giDBYL.@pametjme com
All prtctng In accordance with Omnia Partners I U.S. Communltle• Contract #2017001134.
All tenna in the Omnia Partners I U.S. Cornmunttiea Contracl take precedence over terms shown below.
For more information on the Omnia Partners I U.S. Commoolties contract please visit Omnia partners Public Sector GameTjme
Permits are not Included In cost, uni••• specfflcllly llsted In prtclng. If permits are required Signed/Sealed drawings are needed and are also
not included Wlless opecif1celly fisted in pricing. Any costs for muncipal pennita, paid by installer, will be chargad back to the owner. Adding permits
to any job will increase the length of completion, expect total tirne to be about .1B.uY.I, after receipt ofSite Plan from owner/customer (this is not
due to manufacturing but rather the permit process at the muneipality level). It is expected that the owner wm provide a pproved alte plan• of lhe
area for the permit office, and will help and assilt in the securing of an required approvals before assembly of equipment can begin. lnstaner cannot
provide site plans. lhl Dflllllt prpcfffGIQgotbegin WIii1RIX'CIIJrilSI ll)d cyrmrt •111PltDID� If there are no current
surveys or site plans available, the owner may be required to obtain a n- survey for the permit. This is the responsib�ity of the owner to obtain. If
addltional permitting requirements are needed during the process, those wift be added and bffled accordingly, i.e. soil denaity test, formed !ootera,
etc.
OMNIA
� •• 'I" •••
5A - 3 Page 1 of2
/�
SWEIM'.ZIP
ENCLOSED TOT l!AT
W/ SfMUSS "'='� o.o.
!TMUSS"'='rh¼2• 0.0.
ENCLOSED TOT l!EA1'
W/
-
HOIIZONTAL
LOOP UDDER
31/ro.o.
�/�SIEEL OWN
- PMIEl1IIE
SWING
�,�svro.o.
SIEELCIWN
SEN&ORl'WMIE
!IE'AT
5A - 4
(Game"Jime) Clements Wood Park
,flltAl'OORli�
www,gametim;,.com City of West Melbourne, FL www.playdrp.com
5A - 5
(GameT,me) Clements Wood Park
www.gametimo.com City of West Melbourne, FL www.playdrp.com
5A - 6
(GameT,me3 Clements Wood Park C•�p
I' I Dominica
_.., -
www.gametime.com City of West Melbourne, FL www.playdrp.com
5A - 7
�laypalette: Santa Elena
(Gama7ime) Clements Wood Park "4a:ip
Vl 1 Dominica
1
City of West Melbourne, FL
11oaaotionPnx1ucts
www.gamatimR.com www.playdrp.com
5A - 8
(Game7ime) Clements Wood Park
www.gametime.com City of West Melbourne, FL www.playdrp.oom
5A - 9
5A - 10
ATTACHMENT 2
!!JF. REP SERVICES, INC.
9 IC Experts at Play & Outdoor Spaces
Richard Bo 1
____.._..,._�• �
From:
Sent: Mary Langley
Sales Consultant
To:
165 W. Jessup Avenue
Subject: Longwood, Fl 32750-4146 Cell: 407.947.6318
www.repservices.com mary@repservices.com
Attachments:
CGC1508223
WARNING: Thi� email originated from outside the City of West Melbourne. Do not click links or open attachments unless you
recognize the sender and know the content is safe.
HI Rich,
Below is a picture of the playground I pointed out to you earlier. It is called The Venti. #7496. I have attached a line
drawing and color rendering for your review. It appears it will fit into the space available with no issues.
The estimated cost with freight, installation, engineering, and permitting - but you paying the permit fee directly to The
City is estimated at $80k.
The estimated cost for demo only, not including removal from the site is an additional $3200.00
The above estimates do not include mulch, or new border timbers. We will work within the existing border timbers, and
you will need to have additional mulch blown in once we are complete.
Let me know if you would like me to move forward with a formal proposal. I can add The Clay County Contract to the
proposal, so you can piggy back when ordering. It makes it easier for some Cities, and get you a 2% discount.
1
5A - 11
...
.2022
�...:.....,;,�.! �
7458. 03.31
..,,,,_ �HMrec,t:,R....-..c:!
5A - 12
-
1------------------45'-2·----------------�
TOTAL SQUARE FOOTAGE
1244 SQ.FT. rxm.E
PGlY
I !II.II[
\
;' ---- ----
I 1
..... ....__ ..J
I
// I
/
I
I
/
I
-- ....______
....... -.
I
I
/
/
/;"" __ ...1
\
I ....,..
,
...... ,... .......
LOIi' I
-------
I l'■'IIEMUICllmllCllll:a"IIIII
I
I
-AU.
-...--msCllltallD
-•---.r:...,.
mlllUY -
I
SIQ.E l'a.Y
!II.II[
I
(
I
I
I
I
l._
''
\
\
--::.==--=- __
•:.==:r='l":.•
-cma••
....
.-�
Sr,nrt PlnyfJ
(5-12 yeQrs) DE!DE) ll'r:
,.--... N,,--...
Mo.x f"o.ll Height, 87 Inches
,.....,....'1!1...-
-·
-
llJTAL ELE.YA'IQI PIAY COlll'ONENIS ll
TOTM. ELE.YAlED CllllP0NEIIIS N:CESSB.£ Ill' RAIi' 0 !E11!1Ki1 0
'ltlfAL ELE.YAlED CllllP!HIIIS loCaSSllE Ill' 1lWt5fBI 9 .IIEllllED 7
'ltlfAL ACCESSll!lf GIIOUIIO lE\IEI. C0IIPOIIOOS SHOWN 8 BEIIIIEII 4
TOTAi. lllmlENT ffl'ES or GIIDlJII 11\'El. COIIPCNOOS 5 .11111111112 5
ffllDI TYPE:
_,,
Princeton Elementary School Landscape Structures
;
Smart Pia:,
11CWl140-0l-Ol
5A - 13
ATTACHMENT 3
QUOTE
QUOTE# TLRQ4642-01
PROJECT NAME Clement's Wood
Bill to: Rich Boprey
West Melbourne Parks Dept
2285 Minton Road
West Melbourne, FL 32904
321-355-8876
RECREATION
rboprey@westmelbourne.org
Ship to: Rich Boprey
Top Line Recreation Inc. West Melbourne Parks Dept
2922 Howland Blvd, Suite 3, Deltona, FL 32725 Clement's Wood Park
700 Robert Norris Lane
West Melbourne, FL 32904
321-355-8876
rboprey@westmelbourne.org
SALESPERSON PAYMENT TERMS QUOTE CREATED QUOTE EXPIRES
Terry Perkins Purchase Order Apr18,2022 May 18, 2022
QTY jPART N UMBERj
Clement's Wood Park
DESCRIPTION
I UNIT PRICE I TOTAL PRICE
1 134·152177-1 BCI Burke Basics 134-152177·1, Nucleus, Intensity: NUIN 2959 $73,676.00 $73,676.00
Structure Size: 58' 4" x 97' 6" Resilient Area: 3,504 SF
Age Group: 5-12 User Capacity: 118
Swini1 sets included in oricin2
1 SPRINGINTOP SPRINGSALE Burke Spring Sales Flyer Discount Orders must be placed by -$25,787.00 -$25, 787.00
June 30th 2022 and shio bv Seotember 30th 2022. No exceotions.
1 134-152177-1 BCI Burke Basics, Stone Borders $2,756.00 $2,756.00
1 ENG1DM FL Professional Engineer Sealed Drawing and Calculations $1,031.25 $1,031.25
FL Professional En2ineer Sealed Drawin2s and Calculations
1 FREIGHT Shipping Charges to West Melbourne, FL $9,102.44 $9,102.44
1 BOSGRAAF Installation of Playground Equipment $23,501.54 $23,501.54
1 BOSGRAAF Remove and haul off existing equipment with footings $3,658.54 $3,658.54
1 BOSGRAAF Pull back/push existing EWF $487.80 $487.80
1 BOSGRAAF Haul off excavated material from footings $609.76 $609.76
1 BOSGRAAF Dumpster $609.76 $609.76
1 BOSGRAAF Pulling of permit $731.71 $731.71
SUBTOTAL $90,377.80
TAX RATE
SALES TAX $0.00
TOTAL $90,377.80
Please contact me if I can be of further assistance Terry Perkins407-466-2909
1 of 2
5A - 14
5A - 15
5A - 16
5A - 17
2922 Howland Blvd, Suite 3
Deltona, FL 32725
386-789-4508 / 888-909-0549 Fax
800-921-4509 Toll Free
info@toplinerec.com
Client:
General Terms:
Please note that this order is non-cancelable once placed, and deposit is non-refundable. If shipment is refused when delivery is attempted, carrier will return the shipment to the
manufacturer and all resulting charges will be applied to your account
Acceptance by either a signature or a purchase order based on this proposal indicates that you are in full agreement with all terms and conditions of this proposal including the
following:
Prices are valid for 30 days. After 30 days, prices are subject to change without notice. Sales tax will be charged unless a copy of a valid Sales tax exemption certificate is presented
with order. Specify all color selections in writing. Any discrepancies that arise due to oral color selections will be the responsibility of the customer. If customer is installing
equipment, all equipment is to be installed per manufacturer's instructions and appropriate guidelines such asASTM and CPSC.
Installation, site work, building permits, engineered drawings, etc. are not included unless noted.
Installation Terms:
Standard Services Include:
- Shipping Notification/Receiving Instructions - Layout of Equipment
- Pre-Installation On-Site Meeting • Installation of Equipment and Materials Per Manufacturer's Instructions
- Underground Utility Check (Sunshine State One Call) -Trash Clean Up (Dumpsters and Off-Site Trash Disposal not Standard)
-Accept Delivery and Unload Equipment -Post-Installation Walk Through
( If site is ready) - Maintenance Explanation
-Moving New Equipment to Job Site
customer Responsibilities (Applicable if Top Line Recreation, Inc is NOT installing):
- Trash Disposal - Dumpsters or Off Site Disposal.
-Accept Delivery and Unload Equipment (If site is not ready.) $500.00 Charge willApply if Customer Wants Installers to Unload.
- ProvideArea for Storage and Staging.
- Secure Site and Equipment.
- ProvideAccess as Outlined below.
Some Optional Responslbllitles (Must be clearly outlined in the applicable quotation/contract):
- Removal of Existing Equipment
• Site Preparation and Grading, Drainage Systems, etc.
- Engineered Drawings for Purchased Equipment
-Other Permits or Engineered Drawings (i.e. zoning permits, environmental permits, site surveys, etc.)
*Any other responsibilities must be clearly outlined in the applicable quotation/contract
Building permits
Building permits are the responsibility of the owner. If a building permit is required for your project, there will be an administrative, expeditor, and application fee included on project
quote. This fee does not include the cost of the actual permit. Customer will be charged "actual permit" cost on last invoice.
NOTE -All zoning, planning, environmental, etc. permits and approvals are the responsibility of others.
Other Notes:
Access/Utilities. Access must be provided to the installation area for heavy trucks and equipment Access of equipment and personnel is the obligation of the customer to provide
until the project is fully completed. We will take every precaution to avoid damage, however any damage caused by the normal installation of our product, such as sod, concrete
sidewalks, private underground utilities, etc., will be the responsibility of the customer, as will any additional costs associated with limiting damage such as providing
plywood over sod for access. If access is not reasonably close to the jobsite, any additional costs incurred due to having to transport materials and/or supplies will be the
responsibility of the customer.
Rock/Foreign Object Clause. Most installations require digging of holes and footing equipment in concrete below finished grade. Removal of existing ground covers such as asphalt,
concrete, tan bark, sand, pea gravel, wood fiber, rubber matting, poured-in-place rubber surfacing, or any other material that interferes or delays the digging of holes, is the
responsibility of others, unless otherwise noted. If excessive underground obstructions such as rock, coral, asphalt, concrete, pipes, drainage systems, root systems,
water, or any other unknown obstructions are discovered, charges will be added to the original proposal.
Playground Surfacing. All playground equipment is to be installed over safety surfacing per CPSC guidelines andASTM standards. If the customer contracts for something contrary
to the guidelines, they are accepting all responsibility for any liability and future litigation that may arise.
If a special inspection is required, an additional fee of $700.00 will be added to the final invoice.
Acceptance Signature __________________________ Date ___ _ ___ _ P.O.# _ _ _ _ _ _ _ _
Tax Exempt No.�-------------------
2 of 2
5A - 18
West Melbourne Parks and Recreation
Clement's Wood Park
Proposal# 134-152177-1
April 11, 2022
Presented by
Top Line Recreation, Inc.
;,j
5A - 19
April 11 , 2022
Rich Boprey
West Melbourne Parks and Recreation
2285 Minton Road
West Melbourne, FL 32904
Dear Rich Boprey:
Top Line Recreation, Inc. is delighted to provide West Melbourne Parks and Recreation
with this playground equipment proposal.
This design was developed with your specific needs in mind, and we look forward to
discussing this project further with you to ensure your complete satisfaction. Top Line
Recreation, Inc. is confident that this proposal will satisfy West Melbourne Parks and
Recreation's functional, environmental, and safety requirements -- and most importantly
-- bring joy and excitement to the children and families directly benefiting from your new
playground.
You have our personal commitment to support this project and your organization in
every manner possible, and we look forward to continue developing a long-standing
relationship with West Melbourne Parks and Recreation. We appreciate your
consideration and value this opportunity to earn your business.
Sincerely,
Terry Perkins
Top Line Recreation, Inc.
2922 Howland Blvd
Deltona, FL 32725
5A - 20
Design Summary
Top Line Recreation, Inc. is very pleased to present this Proposal for consideration for
the Clement's Wood Park located in West Melbourne. BCI Burke Company, LLC has
been providing recreational playground equipment for over 90 years and has developed
the right mix of world-class capabilities to meet the initial and continuing needs of West
Melbourne Parks and Recreation. We believe our proposal will meet or exceed your
project's requirements and will deliver the greatest value to you.
The following is a summary of some of the key elements of our Proposal:
• Project Name: Clement's Wood Park
• Project Number: 134-152177-1
• User Capacity: 118
• Age Groups: Ages 5-12 years
• Dimensions: 58' 4" X 97' 6"
• Designer Name: John Uelmen
Top Line Recreation, Inc. has developed a custom playground configuration based on
the requirements as they have been presented for the Clement's Wood Park playground
project. Our custom design will provide a safe and affordable playground environment
that is aesthetically pleasing, full of fun for all users and uniquely satisfies your specific
requirements. In addition, proposal# 134-152177-1 has been designed with a focus on
safety, and is fully compliant with ASTM F1487 and CPSC playground safety standards.
We invite you to review this proposal for the Clement's Wood Park playground project
and to contact us with any questions that you may have.
Thank you in advance for giving us the opportunity to make this project a success.
5A - 21
BURKE GJENERATIONS WARRANTY®
The Longest and Strongest warranty In the Industry
BCI BLrl:e Ccmportt, LLC ("Burke") v..ern,rts !mtoll stzmdlrd products ,re�ed to be free from derects in ma:e-ials and worlma1ship, l.flde-nonnol use and seivice,
lbra perod ofone(1))1ffl'lromthedoteofshipment.
We stand behind our products. In addition, the following products are warranted,
under normal use and service from the date of shipment as follows:
• One Hundred (100) Year Limited Wa1arty on olumirun and steel upris/'t po,ts (ndudire htmsitye, Synergy",Nucleuse, Voltogee, Little Buddi..-, EL�ATE•, ACTIVATE-,
INVIGORATE™) ag,inst structJ.el lailt.re dueto corrosion, det�ion or 'IIOrl<rrmship.
• One Hundred (100) Year Limled �on KoreKonnecte clamps against structual lailul: due to corrosion, detertootion or V><ll1<monship.
• One Hundred (100) Year Umted Wimrtyon 1-l«dv,a"e(ntts , bolts, v..eshfrs)
• One Hl.fldred (100) Year Limled Wa-rortyon bolt-tlro� fastenireond cl9rr1> syste-ns (S)lne-gy", lntEnStye, Nuciruse, Volti,ge", Little Buddie.-, EL�ATE-).
• Twenty-Five (25) Year Linited � on spmg asse-nblles md olumirun ccst mimols.
• Fifteen (15) Year Limited Wonarfy on structure plotfO!l11S and decks, rrn:tal roofs, table tops, b£nch tops, railings and ba1iers against s:ructual failire due to ma:erillls or
v.orkmonship.
• Fifteen (15) Yeor Linited \'«oinarty on oll plostic cornponerts i ncludhg StoneBC<de-s oga/nst structural fai kJre due to materials or \I\OlkJmnship.
• Tm (10) Yea- Lmlted \1'brr!nlyon Shadel'laf c«lopies fdxic,ttreacts,ond cables against deg-oclallon, crackng or ma:erilll breoi<down resulhg from ultra-violet e,q:x,si.re, nalural
detertootionor m,nufaclul1ng defects. This mmmty is limltedto the desig, loadsos stated nthesp,cificotions.
• Tm (10) Year Limited IXerra,ty on NatureP� Boulde-s ond GFRC pit>d,Jcts ogainst structt.ral lailt.re dueto r-.tural deterioration or 'IIOrlrnonship. Nltural WtB, "'11ch 1118)1 occurwi:h
"'¥ concrete product withoge, is excl.Jded fiom lhis 'Ml!aflly
• Ten (10) Yea- Limited � on Full Color Cus:orn Slgnage ogarnt monuladuing defects lh9t cwse delaminlltion or desradotion of the sign. fl.Ill Color Custom Signs al!D any a
two (2) year v..arrorfy agalns: premali.re fadhg of the prlrt and �ics on the s�
• F,ve(S) Year Limited Wa-rartyon rtensityeond �entiree cables and �ELX" flex bridge 093nst premature WtB dueto natural deterioration or marufactuire defects.
Determin,tbnof prernoture we,irwill beot the marufacturer's discretion.
• F,ve(5) Ye,ir Limited Wa-rarfy on movire pats, including swing cooponents, against structural failure dU& to rnotenals or'IIOfkrnanship.
• Five(S) Year Limilro W,rn.-tyon PloyEroe-nble" cables and mallets against defects n ma:e-iais and v,crlomnhip.
• lhree(3) Year Limi:ed W,rn.-tyon electronic ponel speakers, sol.fld chips ond cirrul boords ogains: electronic failure caused by manufactl.rng defects.
The -ly s:ltedobo� is -.elicl ont,, if lhe eQJipment is erected inconlo!mily wih lhe lo)out plan and/or installation instructions fi.Jmisihed by BCI Burke Complfl)', LLC us.ng
approved p,rls; haYe been mairlalned and inspected n accordance wih BCI Btm: Comp<ny, LLC mructions. Bllk£'s liability and)'OUJ' exclusive remed/ h<reunderwlll be limited
to repar or replace-nert of lhose pats lbuld n Bu1<£'s reasonable judgrnmt to be defective. Any claim modewithin the ebove stated v.erranty pe-iods rrust be modepromptt,, alter
discoveryoflhedefect A pert is roveredont,, for the Oligirel warr5ily p€riod of the ipplicoblepirt. R£place-nent perts any lheapplicable v,e-mty fiom lhe deteof shiprnert of lhe
replace-nent from Birk£. Afte-lhe explrmion ofthew,nmty period,you rrust poyfor all pats, bansportalionand servicecha-ges.
Burl<e reseiveslheright to occeptorrejectony claim in v.holeorin pert. Burke will notocceptthe retumofony product wi1tout ls prior written approval. Burl<ewill assume
tronsp,rmtlon ctwges forshiprnert of the retUTI:d p,odo.x:t if ii is relumed in strict compliance with Buke'swritten instJIJctions.
lHE FOREGOING WARRANTIES ARE EXCWSIVEAND IN LIW OF ANY OTHER WARRANlY. EXPRESS OR IMPUED, INCLUDING BUT NOT LIMITED
TOANY IMPLIED Wt.RIIANlYORMEIICHANTABILllYORFITNESS FORA PARTICUIAR PURPOSE. IF THE FOREGOING DISCIAIMEIIOFADDITIONAL 'lfARRANTIES ISNOTGIVEN
FULL FORCE AND EFFEC't ANY RESULTING ADDITIONAL WARRANlYSHALL BE LIMITED IN DURATION TO THE EXPRESS WARRANTIES AND BE OTHERWISE SUBJECT TOAND
LIMITED BY THE TERMS OF BURKE'S PRODUCT WARIIANlY. SOME STATES DO NOT ALLOW lHE EXCWSION OF CERTAIN IMPU ED Wlt.RRANTIES, SO THE ABCNE LIMITATION
MJ,/f NOTAPPIY TO W>U,
w.r-.rnv Exdutlons: Theabc,,,es:ited 'Mlfnrties do notoowr: ·cosmetic" defects, suchos sa81ches, dents,rna-mg,or lactira; d«nage due to incorrect ns:olhtlon,\endolism,
misuse, accident, """'ond tea- rrom noJIT191 use, exposureto �reme wm:her; il11Tl0"sion in soil or ctiome me-, UM.Jlh:>�zed repair or modiflation, obnormel use, ..:I< of
malntermce, or other cause not wllhln Btrte"s oortrol; and
Umlta1lon of Remedies: lu1<e is not I rolefor consequertiol or incidertol dernoges, ncluctire but not limited to labor costs or lost profits resulire lrom lheuseof or irebilily to use
the products or fiom lhe products beirs nccrporated in or becoming a o:mponert of IJl)I ether product. W, afte-a reasonable rumbe-of repeated efi:>rts, Birk£ is inable to repair
or replaceo defectiveornonconfoonins product, Bu1<e shallhaYe the optiontoaccept retumoflheproduct, orpe,ttherrof, if such doesnot subslartiolt,, impor ils-.elue,and retun
lhepirchose priceosthe bufer's entire and e;,o:lusivere-nedy. Wth:x.t limting lhegener!llllyoflheforegdre, Bllkewill not be responsible lor labor costs Involved n theremc-.el of
products or the inslllllotionof replace-nent products. Some s:ites do not Bllow lhee;,o:lusionof inclckrlal damages, so theooo,e exclusion maynotappt,,toyou.
The en;ronment nea- a saltv,ete- coast can be extremely conosive. Some corrosion and/or dete-ioration is conside-0d •normal werr' in lhis mvitlrYnert. Product ns:olled within
SOOya-ds of a sal'MiEr sroreline will ortybe covered for holfthe pe-iodofthestandard product V\erlllnly, up to" maximum of fiveYffl'S, for defects caus0d by corrosion. Products
installed in direct cortactwilh "'IIV\6:e-orlhat"re subjected to sat spmy,re nc:t cove-ed by lhest,nd,rd W81l!rty for IJl)I defeels cwsed by corrosion.
Cortoctyotx local Burke Representative forwmarfy lnformatbn res,rdlng Burke�ancl Burke lile produ:ts.
Tenns of Sale
Prtdng: Prices published in this cotalog ,reh USD,aretpproximlteand do not include shippire & hondlhg,sirfachg, installa:ionnor appliat>le ta<es. All prices ,re subjectto
CM:1Sewilhot.t notice. Cortactyoir Burkerepresentativefor currertpricng Paymertsareto be made;, USD.
Weights: Weigttsore approxmte and may vary with octull orders.
lnstaDatlon: All equipment Is shipped lll9SSe-nbled. For o list of factoly�eitified insll!llers n )<)Ur area, p leasecortactyoix Bu1<e represenlBtive.
Specifications: Product specifications in this catalog were correct at t he timeof pt.blia11:ion. Howevo:r; prodJCI: imp,owments a-eong:,ire It Burke,and we reseivethe rlgtt to
change or discortnue specWicaions wi:ha.t notice.
Lon or D amage In Transit A signed bill of ladhg is our receipt lrorn a canier that our shipmert to you v..es complete and in good condition upon an1-.el. Belbre )OU sig,, please
check theBill of ladi1g carefully l'>flell the shipment arrives to rnal<e sure nolhing is misshg and thereare no damages. Oncethe shipmert leaves oir plart, we are ro longe
responsible for arrt damage, loss or shortage.
For more lnfonnation regarding the warra,ty, call CUstomerServk:e at 920-91!1-9!!20 or 1-800-356-2070, 01A!Ol!5!
BCIBUl21(E.C.OM
B•rka
5A - 22
AGENDA ITEM
May 11, 2022, Parks and Recreation Advisory
Board Meeting
Approved for Submittal By:
Rich Boprey
________________________
Rich Boprey, Parks and Recreation Director
To Be Presented By:
Rich Boprey
________________________
Rich Boprey, Parks and Recreation Director
To: Parks and Recreation Advisory Board Members
From: Rich Boprey, Parks and Recreation Director
Date: May 11, 2022
SUBJECT
Comprehensive Plan elements related to trails and trail systems.
RECOMMENDATION
Parks and Recreation Director recommends that the Parks and Recreation Advisory Board:
Receive informational summary regarding elements of the City’s Comprehensive Plan
related to trails and trail systems.
FISCAL IMPACT
Not applicable.
5B - 1 May 11, 2022
DISCUSSION
At the Parks and Recreation Advisory Board meeting of March 9, 2022, Council Member Daniel
McDow spoke during the public comment portion of the meeting and inquired about portions of
the City’s Comprehensive Plan related to trails and trail systems. In response to this inquiry, city
staff offered to provide a summary of the comprehensive plan elements related to trails and trail
systems. This summary is provided below.
Purpose of the City’s Comprehensive Plan
The City’s Comprehensive Plan provides the direction and guidance which enables the City to
maintain and enhance those attributes that make the City a desirable place to live, work, learn
and play. The Comprehensive Plan is designed to preserve and enhance the public services and
the protection of natural resources. Simply put, the Comprehensive Plan includes:
• Goals for future development and provision of services;
• Objectives or benchmarks to meet in attaining our goals; and,
• Policies to be implemented to meet the slated benchmarks.
Comprehensive Plan elements related to trails and trail systems
Multi-Modal Transportation
1.7 Urban Trail Corridor - Enable walkers and bikers to access activity centers throughout the
Brevard County area by partnering with the regional transportation planning entities including
FDOT, Brevard County and the TPO as a long-term goal.
4.2 Regional Urban Trail System - Coordinate the development of a regional urban trail system
with Brevard County, TPO, and other regional transportation planning partners.
Conservation and Open Space
2.1 Open Space System - The City of West Melbourne shall utilize its site and development
process to expand its open space system. The features of the city’s open space system are:
a. Permanently set aside undeveloped land or common areas for public or private use.
b. Reserved for passive or active recreation parks, walking paths, or other passive natural
uses.
c. Accessible and interconnected pedestrian trails and bikeways.
5B - 2 May 11, 2022
Public Spaces, Parks, and Recreation
1.1 Community Character Resources - Utilize park and public space resources and facilities to
establish a unique community identity, create a unifying theme, and foster a distinct sense of
place. Such facilities may include:
a. Community and neighborhood center parks and civic areas.
b. Community gateways.
c. Parks and green space.
d. Sidewalks and trails that link neighborhoods to parks, shops, and schools.
e. Streetscape, landscaping, and trees, lighting and signs.
f. Walking and biking trails.
g. Sports and recreational facilities.
1.6 Park and Public Space Connectivity - Explore opportunities to connect parks and public
spaces through pedestrian/bike access ways including linear parks, sidewalks, trails, and
greenways. This connectivity should:
a. Integrate the city’s parks, public spaces, community neighborhoods, mixed-use areas, and
commercial centers.
b. Implement strategies established through the city’s Parks and Recreation Plan and
Sidewalk Master Plan.
3.5 Regional Linear Park System - Participate with local, regional, and state organizations in the
development of a regional linear park system that includes trails, bikeways, footpaths, and
sidewalks. Coordinate such efforts with the Brevard County master trail, parks, and recreation
efforts.
Data and Analysis
Greenways and Trails – Multi-Modal Transportation
In 2001, the TPO adopted the Brevard County Greenways and Trails Master Plan and oversees its
implementation. This multi-modal plan was written to develop a comprehensive system whereby
the County’s trail and greenway resources would be utilized to both improve resident’s quality of
life and provide alternative modes of transportation. According to the plan’s objectives, the plan
is to be utilized in two ways:
1. Provide direction about day-to-day management and development the greenway and trail
system.
2. Direct future development and construction of trail and greenway resources.
The 2009 EAR determined that in order for the City to have good connectivity, West Melbourne
will need to develop a local trail, bikeway, and pathway strategy which coordinates with the Space
Coast TPO to:
5B - 3 May 11, 2022
• Link current community assets (parks, recreational areas, neighborhoods, schools, and
commercial centers) to future activity centers.
• Define design guidelines to provide appropriate safety and aesthetics on all linkages.
• Integrate Brevard County efforts to promote a regional multi-modal transportation system.
There are two methods the City uses to coordinate its role in helping the TPO achieve its overall
vision of having a county-wide trail (non-vehicular) system including specific City and County
funded sidewalk projects and projects funded by FDOT. By programming the construction of
sidewalks with transportation impact fee funds along Doherty Drive, Fell Road and Henry Avenue
and by being awarded the “Safe Routes to School” grant from FDOT for construction of a sidewalk
along Hollywood Boulevard, the City has initiated coordination of sidewalk interconnectivity
between the City and County resources.
The lack of bicycling facilities is a concern to the residents of the City of West Melbourne. This
issue was raised in the Horizon 2030 visioning process in November 2007, and subsequently a
study of the current sidewalk gaps was conducted. The current TPO Bicycle Plan was adopted in
1988 and the TPO developed a comprehensive pedestrian plan in 1993. The TPO 2025 LRTP
includes goals, objectives, and policies that address pedestrian and bicyclist needs. A Brevard
County trail system was proposed and is being implemented. The TPO is currently conducting an
update to the Long-Range Plan, namely the TPO 2035 LRTP. This update also has a component
focused on nonvehicular modes of transportation.
Pathways and Trails - Public Spaces, Parks, and Recreation
Pathways and trails may be incorporated into park facilities, but may also be the sole purpose of a
facility. Communities provide urban paths and trails for their recreational value. Trails and paths
should be developed to provide linkages between schools, parks, neighborhoods, and the
community and should connect with regional trail systems. An example would be the trails and
paths that are in the Erna Nixon Park and the sidewalk that traverses the Westbrooke Park,
connecting the Saddlebrooke and Westbrooke neighborhoods along Wingate Boulevard. This
connection makes it possible for children to access school on foot or bicycle in relative safety.
Minton Road Town Center Mobility Plan
As part of a concept called the “Minton Road Town Center”, the East Central Florida Regional
Planning Council prepared a mobility plan that included consideration of potential pedestrian and
bicycle connections in the area. Pages from this report have been attached.
Attachments:
Pages from Minton Road Town Center Mobility Plan
5B - 4 May 11, 2022
Pages from Minton Road Town Center Mobility Plan
Executive Summary
The Final Minton Road Town Center Mobility Plan is a compilation of tasks to address how the City
of West Melbourne can develop an identifiable Town Center and gathering place for citizens to
work, play and live. This grant has been funded by the Florida Department of Economic
Opportunity and the work has been accomplished by the East Central Florida Regional Planning
Council. The plan is comprised of;
1. Inventory and Analysis Report that provides an inventory and analysis of factors influencing
bicycle and pedestrian mobility and interconnectivity in the Project Area.
2. Evaluation of Best Practices to shows examples and lessons learned from other communities
that could be applied within the City to improve bicycle and pedestrian mobility and
interconnectivity within and adjacent to the Project Area.
3. Stakeholders Recommendations Report is from workshops that obtained recommendations
regarding potential actions that the City could undertake to address the bicycle and pedestrian
mobility and interconnectivity issues and facility needs within and adjacent to the Project Area,
including strategies to encourage privately-funded mixed use development.
4. Identification of Provisions in the City’s Comprehensive Plan Affecting Bicycle and Pedestrian
Mobility.
5. Development of Strategies and Incentives & Develop a Banner to promote quality
development within the West Melbourne Town Center.
6. Preparation of three (3) design concepts for identified site(s) for the town center.
Together, these chapters will help guide the City of West Melbourne in the establishment and
promotion of a town center and gathering place that would act as a destination and be interconnected
to the pedestrian and bicycling systems that currently exist. This would make walking and bicycling to
the city center more comfortable and enticing.
The report advances the work done by the American Planning Association and is intended to specify
actions that City can pursue. The design concepts are to scale and intended to illustrate the
possibilities for West Melbourne. The marketing strategies have been successful in other cities in the
country and the examples provide real world experiences. The visual preference survey was taken by
over 600 participants, the vast majority of whom were West Melbourne residents and were
incorporated into the design. The stakeholders meeting was attended by over 25 professionals,
business owners and residents and their input were incorporated into the process.
Suggested Actions
The actions that the City of West Melbourne can take to address the bicycle and pedestrian mobility
and interconnectivity issues and facility needs within and adjacent to the Project Area include:
1. Promotion or establishment of a town center or gathering place that would act as a destination
for connectivity.
2. Providing shaded areas for bicycling and pedestrian activities to make the walk/ride more
enticing.
5B - 5
3. Including bike and pedestrian facilities when considering fair share contributions from
developers.
4. Allowing for a town center overlay area to facilitate the establishment of gathering places.
5. Including pedestrian and bicycle mobility in the public facility siting criteria
6. Redefine the transportation services element to include the provisions for safe transit, bicycle
and pedestrian facilities.
7. Connecting complementary land uses with bicycle and pedestrian facilities.
8. Ensuring that any roadway expansions include biking and walking facilities.
9. Monitoring the locations for bicycle and pedestrian altercations and strategize to ameliorate
problems.
10. Promoting the inclusion of bicycles when making transit related decisions.
11. Including complete street concepts in the planning and decision making process.
12. Including multi-modal considerations in the establishment of the town center area.
13. Suggesting reduced setbacks for buildings in the town center area so that buildings are located
adjacent to the sidewalks with parking in the back of buildings or at the curb.
14. Allowing smaller turning radii for cars at corners to lower the turning speeds in some areas that
experience high pedestrian activity.
Pedestrian and Bicycle Safety
Examples of enhanced bicycle and pedestrian street crossings that may be used to improve mobility
and interconnectivity within the Project Area and to adjacent destinations are contained in the
Inventory and Analysis Report and also shown below;
Traffic calming signage along with
obstacles to slow traffic indicates to
drivers that non-motorized modes are
present.
These crosswalks provide a refuge for
pedestrians. The angle ensures that
pedestrians will see oncoming traffic.
5B - 6
Raised pedestrian crossings warn
vehicles that people cross here
and slow traffic down.
Bulb-outs shorten pedestrian
crossing distances and provide a
safer environment.
Connections
In order to promote the movement of bicyclists and pedestrians to the proposed town center areas,
additional connections in the form or sidewalk additions or multi-use paths along existing canals were
identified. Sidewalk additions and paths along existing canals are suggested to better interconnect
neighborhoods with destinations. The Pedestrian & Bicycle Connections map below provides an
overview, and more detailed information may be found within this report.
5B - 7
5B - 8
AGENDA ITEM
May 11, 2022, Parks and Recreation Advisory
Board Meeting
Approved for Submittal By:
Rich Boprey
________________________
Rich Boprey, Parks and Recreation Director
To Be Presented By:
Rich Boprey
________________________
Rich Boprey, Parks and Recreation Director
To: Parks and Recreation Advisory Board Members
From: Rich Boprey, Parks and Recreation Director
Date: May 11, 2022
SUBJECT
Parks Master Planning.
RECOMMENDATION
Parks and Recreation Director recommends that the Parks and Recreation Advisory Board:
Recommend approval of master planning for future park enhancements.
5C - 1 May 11, 2022
FISCAL IMPACT
The cost estimate for master planning of future West Melbourne municipal park enhancements is
$105,000, however the recommendation is to budget up to $125,000 to include contingency funds
for additional work efforts that may be necessary as part of the master planning process.
DISCUSSION
During recent budget discussions, interest has been expressed in future municipal park
enhancements. To assist in determining the best use of the space available and types of
enhancements desired by the community, staff recommends conducting a formal study that
would identify the most suitable enhancements for the municipal park space available and allow
for the development of a master plan that will provide a roadmap for implementation of the
recommended enhancements.
A number of important community outreach, advisory board, City Council and staff meetings are
incorporated in the master planning process. An outline of anticipated steps and costs can be
found below.
Estimated Fee By Step HOURS FEE
Step 1: Kick-Off & Initial Site Visit 20 $3,000
Step 2: Meetings with Parks Department and/or Advisory Board 20 $3,000
Step 3: Participate in Community Focus Group Meetings/ Presentations 40 $6,000
Step 4: Support City Staff at City Council Meetings 20 $3,000
Step 5: Review Existing Relevant Information 20 $3,000
Step 6: Prepare Site Analysis & Preliminary Concepts (40 Hrs/ Site) 200 $30,000
Step 7: Refine Final Master Plan for Each Park Site (40 Hrs/ Site) 200 $30,000
Step 8: Prepare Engineering/ Permit Analysis (12 Hrs/ Site) 60 $9,000
Step 9: Prepare Conceptual Level Cost Estimates (16 Hrs/ Site) 80 $12,000
Step 10: Prepare Executive Summary Report of Findings 40 $6,000
Total Estimated Fee 700 $105,000
Attachments:
Parks Master Planning Proposal - Adkins
5C - 2 May 11, 2022
May 2, 2022
Mr. Scott Morgan
City of West Melbourne
RE: City of West Melbourne – Parks Master Planning Services
Request for Proposal FY 2023 Budget Allocation
Dear Scott,
Thank you for reaching out to Atkins regarding the Parks Master Planning scope of work you are
planning for in FY 2023. We enjoyed working with the City before and we are glad to hear our work
was well received. We understand your immediate need is not for a formal proposal but for some
supporting information from which you can establish the scope, schedule and budget. Sorry it has
taken a couple of weeks to respond to your request. Based upon what we know about the project our
recommendations are below and of course we are available to discuss it with you if we have
misinterpreted your expectations or the magnitude of the work.
PROJECT UNDERSTANDING
Our understanding of the project is that the City of West Melbourne has a total of approximately 53
acres of park broken into five distinct sites. Of that total area we understand that 19 acres have
previously been developed so the master planning services will focus on the remaining 34.
SCOPE OF WORK
Atkins proposes a work plan to organize the study in a manner intended to progressively inform the
City as the study evolves. The sequential steps of the study are anticipated to include:
Step 1: Kick-Off Meeting & Initial Site Visit
Step 2: Meetings with Parks Department and/or Advisory Board (Estimate monthly, total of 3)
Step 3: Participate in Community Focus Group Meetings/ Presentations. (Estimate total of 3)
Step 4: Support of City Staff at City Council Hearings. (Estimate monthly, total of 3)
Step 5: Review of existing relevant information to be provided by the City which may include:
• Inventory of park system assets and programs.
• Needs assessment survey data.
• Latest available demographic profile of service area.
• Specific Site Data
o Aerial Photos
o Topographic Survey
o Soils/ Geotech information
Step 6: Prepare site analysis and two (2) preliminary concept plan alternatives for each site.
Step 7: Refine preferred concept for each site into final illustrative master plan inclusive of diagrammatic
overlays for items such as phasing and utility service requirements.
5C - 3
Step 8: Prepare concise summary evaluation of Authorities Having Jurisdiction (AHJ) and anticipated permit
applications and durations required.
Step 9: Prepare conceptual level cost estimate for each site.
Step 10:Prepare executive summary report of findings.
PROJECT SCHEDULE
Based upon the scope of services outlined above Atkins is proposing the schedule for the Parks
Master Planning service project should be planned for a duration not less than 3 months but not to
exceed 4 months.
FEES & REIMBURABLES
Solely for budgeting purposed at this time, Atkins proposes establishing an allowance for each base
scope design service for the project breakout as follows:
Estimated Fee By Step HOURS FEE
Step 1: Kick-Off & Initial Site Visit 20 $3,000
Step 2: Meetings with Parks Department and/or Advisory Board 20 $3,000
Step 3: Participate in Community Focus Group Meetings/ Presentations 40 $6,000
Step 4: Support City Staff at City Council Meetings 20 $3,000
Step 5: Review Existing Relevant Information 20 $3,000
Step 6: Prepare Site Analysis & Preliminary Concepts (40 Hrs/ Site) 200 $30,000
Step 7: Refine Final Master Plan for Each Park Site (40 Hrs/ Site) 200 $30,000
Step 8: Prepare Engineering/ Permit Analysis (12 Hrs/ Site) 60 $9,000
Step 9: Prepare Conceptual Level Cost Estimates (16 Hrs/ Site) 80 $12,000
Step 10: Prepare Executive Summary Report of Findings 40 $6,000
Total Estimated Fee 700 $105,000*
*For budgeting we recommend a range of $105,000 to $125,000 to allow some contingencies for any additional
work efforts.
In addition to the fees shown above ATKINS recommends allocating an additional amount of $2,000
to be set aside for miscellaneous reimbursable expenses including mileage to and from the project
site.
PROJECT COMMITMENT
Thank you again for considering Atkins for this scope of services as we would welcome the opportunity
to engage with the City of West Melbourne to help them deliver the Parks Master Plan study. As a
firm, Atkins appreciates our history of working with City and is committed to continuing to provide a
high level of service.
Sincerely,
David Larsen, RLA
AVP, Principal Technical Professional
Cc: Mel Scott, Atkins
William Poulin, Atkins
Page 2|2
5C - 4
AGENDA ITEM
May 11, 2022, Parks and Recreation Advisory
Board Meeting
Approved for Submittal By:
Rich Boprey
_______________________________________________________
Rich Boprey, Parks and Recreation Director
To Be Presented By:
Rich Boprey
_______________________________________________________
Rich Boprey, Parks & Recreation Director
To: Parks and Recreation Advisory Board Members
From: Rich Boprey, Parks & Recreation Director
Date: May 11, 2022
SUBJECT
Review update of the Community Park Splash Pad Capitol Project
RECOMMENDATION
Parks and Recreation Director recommends that the Parks and Recreation Advisory Board:
Receive the update on the splash pad.
FISCAL IMPACT
None
6A - 1 May 11, 2022
DISCUSSION
Bliss Products contractor has dug the holes for poles and canopies. The West Melbourne
Building Department recommended that additional trenches be dug to cable and connect all
poles together. This request has resulted in a $4500 change order to the original contract. The
change order is with the City Attorney for final approval to be granted by the City Manager.
Once signed, the contractor will continue to work on the project again.
6A - 2 May 11, 2022
AGENDA ITEM
May 11, 2022, Parks and Recreation Advisory
Board Meeting
Approved for Submittal By:
Rich Boprey
_______________________________________________________
Rich Boprey, Parks and Recreation Director
To Be Presented By:
Rich Boprey
_______________________________________________________
Rich Boprey, Parks & Recreation Director
To: Parks and Recreation Advisory Board Members
From: Rich Boprey, Parks & Recreation Director
Date: May 11, 2022
SUBJECT
Review Update on the status of I-95 tree and landscaping maintenance.
RECOMMENDATION
Parks and Recreation Director recommends that the Parks and Recreation Advisory Board:
Receive the update on the status of I-95.
FISCAL IMPACT
None
6B - 1 May 11, 2022
DISCUSSION
Midwestern Construction (DOT approved contractor) will be onsite the week of May 9, 2022 to
spray herbicide (tree rings) and mulch 400 + palm trees on the entry and exit ramps for exit 180
on I-95.
6B - 2 May 11, 2022
AGENDA ITEM
May 11, 2022, Parks and Recreation Advisory
Board Meeting
Approved for Submittal By:
Rich Boprey
_______________________________________________________
Rich Boprey, Parks and Recreation Director
To Be Presented By:
Rich Boprey
_______________________________________________________
Rich Boprey, Parks & Recreation Director
To: Parks and Recreation Advisory Board Members
From: Rich Boprey, Parks & Recreation Director
Date: May 11, 2022
SUBJECT
Review items on Board provided maintenance list.
RECOMMENDATION
Parks and Recreation Director recommends that the Parks and Recreation Advisory Board:
Receive the update on the status of Board provided list of park maintenance items.
FISCAL IMPACT
None
6C - 1 May 11, 2022
DISCUSSION
At the March 9, 2022 Parks and Recreation Advisory Board meeting, the board presented a list
of items for the attention of the parks maintenance crew. The majority of these items have
been completed.
6C - 2 May 11, 2022
Get email alerts for West Melbourne
A daily email when new agendas and minutes are posted.