Planning Commission Meeting
Regular MeetingWest Valley City, UT · January 29, 2025
Minutes
MINUTES OF THE WEST VALLEY CITY PLANNING COMMISSION
PUBLIC HEARING JANUARY 29, 2025
THE PLANNING COMMISSION MEETING MET IN REGULAR SESSION ON WEDNESDAY,
JANUARY 29, 2025 AT 4:00 PM IN COUNCIL CHAMBERS WEST VALLEY CITY HALL, 3600
CONSTITUTION BOULEVARD, WEST VALLEY CITY, UTAH. THE MEETING WAS CALLED TO
ORDER AND CONDUCTED BY CHAIR MATTHEW LOVATO.
THE FOLLOWING MEMBERS WERE PRESENT:
Mathew Lovato, Chair
Martel Winters, Commissioner
Darrick Porter, Commissioner
Nancy Drozdek, Commissioner
Renee Layton, Commissioner
Rob Durfee, Commissioner
PLANNING DIVISION STAFF PRESENT:
Steve Pastorik, CED Director
Brock Anderson, P&Z Senior Planner
Jody Knapp, P&Z Zoning Administrator
Steve Lehman, P&Z Planning Manager
Julie Davis, P&Z Administrative Assistant
LEGAL DEPARTMENT:
Brandon Hill, Assistant City Attorney
PRESENTATIONS:
1) GPZ-8-2024 Petition by DAI requesting a General Plan change from
Commercial/Light Manufacturing to Medium Density Residential (7 to 12
units/acre) and a zone change from A (Agricultural, minimum lot size ½ acre) to
RM (Multiple Unit Dwelling Residential). The property is located at 2996 South
Redwood Road on 2.48 acres. Staff – Steve Pastorik at 801-963-3545 or
steve.pastorik@wvc-ut.gov.
This application was continued at the applicant’s request during the Planning Commission
meeting on January 15th.
Joe Salisbury and Krisel Travis with DAI have submitted a General Plan/zone change
application for a 2.48-acre parcel located at 2996 S Redwood Road. The property is currently
zoned A (Agriculture, minimum lot size ½ acre) with a General Plan designation of
Commercial/Light Manufacturing. The proposed zone is RM (Multiple Unit Dwelling
Residential) and the proposed General Plan designation is Medium Density Residential (7 to 12
units/acre).
Surrounding zones include A to the north and east, RMH (Residential Mobile Home) to the
south, and M (Manufacturing) to the west. Neighboring uses include a power transmission
Minutes of Planning Commission Public Hearing January 29, 2025
Page 1 of 15
corridor to the north, the County owned Redwood Recreation Center Park to the east, and the
American Heritage mobile home park to the south and west. The property includes two homes
that, according to the Salt Lake County Assessor, were built in 1937.
The applicant is proposing to demolish the two existing homes and construct a 49-unit, two-
story, rental townhome development. The applicant’s proposal includes the use of the 2.01-acre
Rocky Mountain Power owned parcel to the north for access, parking, and recreation space. The
proposed density of the project including the Rocky Mountain Power property is 10.9 units/acre.
The units within the building closest to Redwood Road face Redwood Road and include rear-
loaded garages. All other units have front-loaded garages. There are 31 3-bedroom units and 18
2-bedroom units. Each 3-bedroom unit includes a 2-car garage and each 2-bedroom unit includes
a 1-car garage. All garages have driveways that are deep enough to park in. The attached concept
plan and application materials from the applicant provide details on and support for the proposed
project.
By way of background, DAI developed the H2O Lofts project at 2864 S Decker Lake Dr. The
townhomes proposed on the subject property are similar to those at the H2O Lofts project.
In reviewing this application, staff suggests that there are two primary questions to answer:
1. Is this the right location for a townhome development?
2. Assuming the location is appropriate, does the quality of the project further City goals?
These two questions are explored below.
Is this the right location for a townhome development?
According to the City’s zoning ordinance, zone changes to the RM zone can only be considered
by the City if the following four conditions are met:
1. For properties without existing Structures which are proposed to be developed, the
property must be a minimum of one acre and the Density must not exceed 12 units per
acre. For properties with existing Structures proposed to be redeveloped, the property
must be a minimum of 20,000 square feet and the Density must not exceed 20 units per
acre. For properties that are west of Redwood Road and within one-half mile of the West
Valley Central light rail station, the Decker Lake light rail station or the Redwood
Junction light rail station, the Density may exceed 20 units per acre;
2. The property shall meet any one of the following four requirements: (i) have access and
Frontage on a Street with a planned Right-of-way width of at least 80 feet (for properties
under two acres) or 100 feet (for properties two acres or larger) as indicated on the Major
Street Plan; (ii) be adjacent to existing multifamily residential development on two sides;
or (iii) be located west of Redwood Road and within one-half mile of the West Valley
Central light rail station, the Decker Lake light rail station, or the Redwood Junction light
rail station; or (iv) if the property is vacant, was vacant as of January 19, 2021, will be an
exempt housing development under 24 CFR 100.304 or successor regulation with a
Minutes of Planning Commission Public Hearing January 29, 2025
Page 2 of 15
density no greater than seven units per acre, and have access and Frontage on a Street
with a planned Right-of-way width of at least 80 feet;
3. A Development Agreement must be proposed with the zone change application that
addresses Dwelling Unit sizes, exterior materials, architecture, Landscaping, and project
Amenities; and
4. A traffic impact study prepared by a registered traffic engineer is required for projects
with 100 or more Dwelling Units.
This application meets the first condition in that the property has existing structures, is over
20,000 square feet in area, and has a proposed density below 20 units/acre. For the second
condition, the subject property has access and frontage on Redwood Road, which has a planned
right-of-way width over 100’. On the third condition, the applicant has proposed development
agreement standards and those standards are addressed later in this report. The fourth condition
does not apply because the project is under 100 units.
While the property is eligible for RM zoning, the City may still deny requests for RM zoning.
The points below may help the Commission answer the first question.
• There are eight developed or approved townhome developments that front or have access
on Redwood Road.
• As part of the City’s General Plan update effort, staff discussed this property, along with
other properties along Redwood Road, with both the Planning Commission and City
Council. Both the Planning Commission and City Council indicated that they were
supportive of townhomes at this location.
• Redwood Road is currently a 7-lane arterial street that is serviced by UTA bus route 217.
• Average annual daily traffic (AADT) on this segment of Redwood Road was 26,000 in
2023. A 7-lane arterial can handle a traffic volume of 40,000 at a level of service (LOS)
C and 46,000 at a LOS D.
Does the quality of the project further City goals?
City Code requires requests for the RM zone to be accompanied by a development agreement
proposal that addresses dwelling unit sizes, exterior materials, architecture, landscaping and
project amenities. These items, along with other considerations, are addressed below.
Dwelling Unit Sizes
In the zoning ordinance, the minimum unit sizes for townhomes are 1,100 square feet for 2-
bedroom units and 1,400 square feet for 3-bedroom units. The front-loaded 3-bedroom units are
1,452 finished square feet with 544 square feet in an unfinished basement. The rear-loaded 3-
bedroom units are 1,486 square feet with 513 square feet in an unfinished basement. The front-
loaded 2-bedroom units are 1,021 finished square feet with 360 square feet in an unfinished
basement.
Exterior Materials
Minutes of Planning Commission Public Hearing January 29, 2025
Page 3 of 15
For materials, the City’s multi-unit residential design standards state: “All multi-unit residential
Building exteriors shall be brick, stucco, stone, tile, metal panels or fiber cement siding. With the
exception of brick or stone which may be used on the entire Building exterior, no single material
shall comprise more than 60 percent of a Building’s exterior. Where stucco, tile, metal panels or
fiber cement siding are used, at least 20 percent of the Building’s exterior shall be brick or stone.
Wood and vinyl may be used as trim, soffits and/or accent materials only.”
The applicant is proposing a combination of brick and fiber cement lap siding (horizontal) and
board and batten siding (vertical). The exterior of the front-load buildings are 23% brick and the
exteriors of the rear-load buildings are 27% brick. While the fiber cement siding exceeds the
60% rule, the applicant is asking for an exception here given the proposed variety in color and
mixture of horizontal and vertical application.
Architecture
Based on a preliminary review of the proposed building architecture by staff, the proposed units
appear to meet most of the architectural requirements in the City’s multi-unit residential design
standards. Exceptions include the following:
• The ordinance requires at least 25% of the front façade to be fenestration (i.e. windows).
The fenestration on the first submittal for the front-load units was 15.2% of the front. The
applicant has since added windows to increase the fenestration to 21.1%. In staff’s view,
adding additional windows beyond the latest proposal would not, in this case, enhance
the front and the latest front elevations meet the intent of the code.
• The ordinance requires the minimum roof pitch for main roofs to be 6:12 and subordinate
roofs, such as sheds and dormers, to be 4:12. The applicant is requesting an exception on
this requirement similar to what was approved in the H2O Lofts development agreement.
The roof pitch of the rear-load buildings with hipped roofs is 4:12. The roof pitch of the
front-load buildings varies from 6:12 for the main roof in the front to 3:12 for the main
roof in the back and on the sheds.
Landscaping
The ordinance requires a total of 50% landscaping and recreation space. The applicant’s concept
shows 50.9% with the Rocky Mountain Power property included.
Project Amenities
For a project of this size, the ordinance requires one amenity. The proposed project includes
three amenities from the ordinance – a walking/exercise trail, a tot/lot playground, and an
outdoor fire pit/fireplace. Interior finishes and amenities match those in the H2O Lofts project
and include garages wired for level 2 (240 volt) electric vehicle charging, 9’ ceilings, solid
surface countertops in all kitchens and bathrooms, smart home technology, minimum furnace
efficiency rating of 96%, and vinyl plank flooring.
Given the numerous amenities at H2O Lofts and the relatively small size of the proposed project
on the subject property, the applicant is proposing to grant residents of the proposed project
access to the amenities at H2O Lofts.
Garages/Parking
Minutes of Planning Commission Public Hearing January 29, 2025
Page 4 of 15
The ordinance requires all townhome units to include a 2-car garage. The overall parking
requirement for townhomes is 4.75 with 2 in a garage, 2 in a driveway, and an additional 0.75
within the project. All of the 3-bedroom units meet the 4.75 stall requirement. The 2-bedroom
units include 2.75 stalls/unit with one in the garage, 1 in the driveway, and 0.75 in surface
parking. The applicant is requesting an exception to the garage and parking requirements for the
2-bedroom units because the units are smaller (most of the new townhome units in the City are
3-bedroom units or larger) and the parking requirement for a 2-bedroom apartment is 1.75
stalls/unit.
Pedestrian Accommodations
The ordinance requires pedestrian walkways to and between:
• The primary entrance or entrances to each residential building, including clubhouses
where applicable;
• Any sidewalks or walkways on adjacent properties that extend to the boundaries shared
with the residential development;
• Any public sidewalk system along the perimeter streets adjacent to the residential
development;
• Where applicable, adjacent uses and developments, including but not limited to adjacent
residential developments, shopping centers, office buildings, or restaurants; and
• Where applicable, any adjacent public park, greenway, trail network, or other public or
civic use including but not limited to schools, places of worship, public recreational
facilities, or government offices.
The original concept did not include designated pedestrian connections between the front-loaded
buildings and the main roadway within the project. However, the latest concept plan has been
modified to include walkways along each of the private roads servicing the townhome buildings.
Rocky Mountain Power Property
The project, as proposed, is dependent upon the Rocky Mountain Power property to the north for
access to Redwood Road and to meet the parking, landscaping, and recreation space
requirements of the ordinance. The applicant is working with Rocky Mountain Power to secure a
perpetual easement on this parcel. Staff suggests that the development agreement include a
provision that does not allow the issuance of any building permits until the easement is secured.
Another issue related to the Rocky Mountain Power property is the potential for a new road that
would connect Decker Lake Drive with Redwood Road. As the Commission may be aware, the
City is currently working on station area plans for three of the four light rail stations within the
City. As part of this planning effort, the City is exploring the possibility of introducing a new
road that would connect Decker Lake Drive at the Big Wave Drive signal (the main entrance to
the H2O Lofts) to Redwood Road through the power corridor. Staff has discussed this possibility
with the applicant and would like their easement with Rocky Mountain Power to not preclude the
possibility of this new road.
Staff Alternatives:
1. Approval. This General Plan/zone change application should be approved subject to a
development agreement that incorporates the standards and exceptions proposed by the
Minutes of Planning Commission Public Hearing January 29, 2025
Page 5 of 15
applicant along with the following additions recommended by staff:
a. The developer shall acquire a perpetual easement on the Rocky Mountain Power
property at 2992 South Redwood Road (parcel #15-27-176-006). Building permits
for new structures shall not be issued until the property or easement is acquired by
the developer.
b. The easement on the Rocky Mountain Power property shall not preclude the
construction of a new road running east to west through the Rocky Mountain
Power property.
c. The Redwood Road streetscape improvements in Section 7-10-204 shall be
installed across the subject property as well as the Rocky Mountain Power
property.
d. All of the Rocky Mountain Power property shall be improved as a road, parking,
amenities, or landscaping. To count toward meeting the minimum landscaping
and recreation space requirements of the City’s ordinance, new landscaping must
be installed to replace whatever is currently on the site.
e. If the developer is unsuccessful in acquiring an easement from Rocky Mountain
Power, the project may proceed on the subject parcel subject to the following
conditions:
i. The maximum number of units shall be 27 (10.9 units/acre).
ii. The 2-bedroom units shall not exceed 40% of the total units.
iii. The minimum amount of parking for each unit shall be the same (4.75 for
3-bedroom units and 2.75 for 2-bedroom units).
iv. The number of amenities provided may be decreased from three to two.
2. Continuance. This application should be continued for reasons determined during the
public hearing.
3. Denial. This application should be denied.
Discussion: Steve Pastorik presented. The applicant, Joe Salisbury, was present. Commissioner
Durfee asked Steve if the easement isn’t granted by Rocky mountain Power would there be
enough parking to meet the Code. Steve replied that the developer would have to drop units to
meet the parking requirement. Whether they are granted the easement or not, they would have to
meet 4.75 stalls for the 3 bedrooms and 2.75 stalls for the 2 bedrooms.
Motion: Commissioner Winters motioned to approve GPZ-8-2024 subject to the 5 conditions in
the Staff Report. Commissioner Drozdek seconded. A voice vote was taken and all members
voted in favor of the motion.
2) PUD-1-2025 Petition by Brandon Parr with Edge Homes is requesting preliminary
approval for the Solari PUD Subdivision. The subdivision will consist of 245
townhome units, 40 condominium units and 11 single family lots. The property is
located at 3688 South Redwood Road is 26.1 acres in size and is zoned RM. Staff-
Steve Lehman at 801-963-3311 or steve.lehman@wvc-ut.gov.
BACKGROUND:
Minutes of Planning Commission Public Hearing January 29, 2025
Page 6 of 15
Brandon Parr, representing Edge Homes, is requesting preliminary approval for a new residential
development to be known as Solari PUD. The subject property is located on the old Redwood
Drive-in property at 3800 South Redwood Road. The property was recently rezoned from the C-
2 zone to the RM zone and was approved with a development agreement.
STAFF/AGENCY COMMENTS:
Public Works Department:
o Approval required of ditch/water users for any abandonment, relocation, piping and
any other modifications to existing ditches or irrigation structures.
o Contact Salt Lake County Auditor’s Office for approval of street names and
subdivision name.
o Street improvements shall be installed in accordance with plan and profiles
approved by the Engineering Division. This includes dedication on 3800 South and
1950 West.
o Flood control issues to be coordinated with Public Works. This includes proposed
underground storage systems and capacity. Sizing of detention pond will need to
be evaluated and depending upon the depth may need fencing.
o Will need to coordinate access on Redwood Road with the Utah Department of
Transportation.
o Developer will need to address the need for snow stacking.
o Speed tables will be required on the north/south streets.
o The 57-foot right-of-way for east/west streets containing parking spaces will need
to be modified to remove the parking spaces from the public right-of-way.
o Will be evaluating soils report for basement depths and road construction
requirements.
o Phasing plan required.
Utility Companies:
o Standard Utility Easements required.
Granger Hunter Improvement District:
o Project is subject to all District requirements and design standards. Additional
reviews will be needed to determine fire hydrant locations.
Minutes of Planning Commission Public Hearing January 29, 2025
Page 7 of 15
Fire Department:
o Proposed fire hydrant locations will need to be reviewed at final plat.
o Project shall meet all provisions of Fire Code relating to this type of development.
Building Division:
o Will review soils report for basement depth and any other building consideration.
ISSUES:
Due to the location and complexity of this development, staff would like to address a
number of issues as part of the staff report:
Overall Development:
The Solari PUD will be a residential planned community consisting of 245 townhomes, 40
condominiums, and 11 single family lots. The subject property was rezoned in 2024 from
the C-2 zone to the RM zone. A development agreement was reviewed by the Planning
Commission and subsequently approved by the City Council as part of that process. A
copy of the agreement will be attached to this report.
The total acreage for this project is approximately 26 acres. The project density including
the single-family dwellings has been calculated at 11.4 units per acre. The site has been
designed with access from Redwood Road and 3800 South with Redwood Road serving as
the main entrance to the development. The single-family dwellings will gain access from
1950 West. All streets within the development will be dedicated and constructed in
accordance with City standards.
Housing Design:
The overall project has four different housing types. Single-family detached, front load
and rear load townhomes and condominiums.
The single-family dwellings will be a minimum 1400 square feet with a 2-car garage and
driveway for parking. Space will be provided on the side of the garage to accommodate
additional vehicles. Basements are planned for all single-family dwellings. Building
materials will be a combination of brick, stone, composite siding and stucco. Neighboring
homes on either side of the lot will have different elevations, colors and materials.
The Condominiums will be 3-story units with a finished floor space of 1,270 square feet.
Materials for these units will be brick, stone, composite siding and stucco. The buildings
will front Redwood Road and will be comprised of three exterior color schemes. All
condominiums will have access to a single car garage and full-length driveway.
The Front Load Townhomes for the inner units will be 1,595 square feet in size with a
685 square foot basement. The minimum size of the front load outer units will be 1,618
Minutes of Planning Commission Public Hearing January 29, 2025
Page 8 of 15
square feet with a 703 square foot basement. Exterior building materials will be brick,
stone, composite siding and stucco. Per the development agreement, there will be a mixture
of building styles with each having three exterior color schemes.
The Rear Load Townhomes will be 1,705 square feet with a 731 square foot basement.
The minimum size of the outer units will be 1,647 square feet with a 734 square foot
basement. Building materials will be consistent with the other buildings in the project with
brick, stone, composite siding and stucco. Those
Geotechnical Report:
As noted above the majority of housing units are proposed to have basements. According
to a soils report submitted by the applicant, 11 test pits were dug to determine a number of
factors, one of which is ground water elevations. According to the report, groundwater
was encountered at depths ranging from 4 to 9 feet. The City requires the lowest floor slab
to be 3 feet above the ground water elevations. The report did discuss land drain
possibilities which would be discussed with the City Building Division and City
Engineering Division. The site will also be graded much differently than it is today. So,
for the purposes of this report, basements are required, but it is very likely that some sort
of land drain system will be needed for portions of the project site. This will be coordinated
with the City as the project moves forward.
Building Setbacks:
Proposed setbacks for all units are per the illustrated site plan. The east side setback
pertaining to the condominiums will be established by the Redwood Road Streetscape
which is typically 20 feet from property line. The north setback adjacent to the existing
residential condominiums is proposed at 18 feet with the south setback adjacent to 3800
South being at 15 feet. The west setback adjacent to the single-family lots is 23 feet. All
other internal setbacks are per the site plan. The single-family dwellings will be using
setbacks per the R-1-8 zone.
Because there are a few issues related to the preliminary plat such as additional dedication
along 3800 South and 1950 West, the site plan including setbacks are likely to be modified.
Due to these issues, setbacks may need to be modified from what is proposed on the
preliminary plat. A minimum setback of 15 feet can be used for the north and south units
and 20 feet for the west units adjacent to the single-family lots. The east setback will be
established by the Redwood Road Streetscape which will be 20 feet from property line.
There is one area of concern regarding the townhome units in the southwest corner of the
development site. More specifically the driveway locations. City ordinance states that the
depth and width of driveways leading to garages shall be at least 18 feet. The driveways
at this location are in conflict one with another. A potential solution would be to move the
townhome units fronting 3800 South eastward towards the entrance on said right-of-way
to provide for the needed spacing. There may be other options as well, but this seems to
be a fairly simple solution to resolve the problem.
Amenities:
Minutes of Planning Commission Public Hearing January 29, 2025
Page 9 of 15
The project will have an amenity package that will be paid for and installed by the
developer and maintained by the HOA. The amenities will include:
▪ A 4,463 square foot clubhouse with a fitness center, kitchen, bathrooms and
gathering area.
▪ A swimming pool with lounge chairs and shade structures.
▪ Pickleball courts
▪ Play areas, gathering areas, picnic tables and shade structures.
▪ A trail corridor located in the middle of the project allowing residents the
ability to move from west to east to participate in the amenities is also
provided. In addition, a playground area with benches and picnic tables will
be constructed in the middle of the project.
▪ An entry feature will be installed at the Redwood Road entrance.
The northeast, southeast and southwest corners of the property are proposed to have open
spaces, picnic tables and trash receptacles. However, internal connectivity is lacking for
each of these spaces. The amenity plan illustrates a walkway from the exterior sidewalk,
which is fine, if the general public is to use these spaces. Staff will recommend that the
developer re-evaluate the connections to each of these spaces to ensure internal connections
rather than from the public sidewalks along Redwood Road and 3800 South.
Landscaping:
According to the developer, the project will have 51.2% open space. The developer has
submitted a preliminary landscape plan that will further be reviewed as the project moves
forward. The developer will be installing the Redwood Road Streetscape along the east
boundary of the development and per the development agreement, 3800 South is required
to have a parkstrip. This new parkstrip will need street trees that are not currently being
shown on the preliminary landscape plan. Landscaping for the single-family dwellings
will be installed by the developer. Said landscaping will be maintained by the HOA.
Internal landscaping looks pretty good at this point. However, due to the requirement of
public streets, there is not a lot of design flexibility with road configuration. As a result,
the dedicated streets have an abundance of consolidated driveways relatively close
together. Street trees are shown along these rights-of-way, but staff believes that additional
trees are needed. It will be recommended that the landscape architect review these areas
and provide additional trees and specific varieties that will help improve the street scene.
Access:
As mentioned previously, access to the development will be gained from Redwood Road
and 3800 South. The developer will need to coordinate access on Redwood Road with the
Utah Department of Transportation. The frontage along Redwood Road will be designed
to accommodate the Redwood Road streetscape. The main drive will align with Calvo
Drive across Redwood Road to the east in the Town and Country Mobile Home Park.
A second access will be gained from 3800 South. There will be a small amount of
dedication along this right-of-way to ensure that all public improvements will be located
Minutes of Planning Commission Public Hearing January 29, 2025
Page 10 of 15
within the right-of-way. The proximity of the entrance off 3800 South does meet spacing
requirements of the Engineering Division. Per the development agreement, the developer
will be adding a parkstrip to the cross section as part of the improvements along this right-
of-way.
Access to the single-family dwellings will be gained from 1950 West. There will also be
additional dedication required on this street to once again ensure that all public
improvements are located in the right-of-way, including a turn lane and corner radius at
1950 West 3800 South.
All roads within the development will be dedicated and improved to City standards. The
width of said streets will be 44 feet and 34 feet in accordance with public street cross
sections used for planned communities. A portion of the east/west street which contains
parking is presently shown as part of the right-of-way. The City will not maintain any area
proposed for parking, so that will need to be a modification on the plat.
Due to the long north/south streets, the Engineering Division is recommending some type
of traffic calming. One recommendation is to use speed tables. During the Planning
Commission study session, a suggestion was mentioned that an appropriate location for the
speed tables would be where the east/west walking path is located. This would provide for
traffic calming and would be a predominant and safe feature for pedestrians moving from
east to west throughout the development. Staff will continue to work with the developer
regarding these matters.
Parking:
The project will meet the City’s parking standard of 4.75 spaces for the townhomes and
single-family dwellings. For this project, all townhome units will have a 2-car garage and
a driveway for a total of 4 spaces. Additional parking is available to meet the additional
.75 spaces per unit requirement.
The condominiums will have a single car garage and a full length driveway. Additional
parking spaces are provided throughout the community to meet their parking requirement
of 2 spaces per unit.
The single family lots will have a 2-car garage and full length driveway for a total of 4
spaces per unit. A designated space will be provided on the garage side for additional
parking.
Snow Stacking:
Buildings and driveways occupy a majority of the street system within the development.
Since this project is being designed without knuckles, and since driveways are close
together, there is not a lot of space for snow stacking. Since the City will be handling snow
removal for this project, that is a concern for the Public Works Department. The developer
will need to provide spaces where snow can be directed to make sure the project can be
cleared of snow for those times when needed. Staff has identified a few locations and will
address those below. Each will necessitate some re-working of the site plan and will need
the coordination of the HOA:
Minutes of Planning Commission Public Hearing January 29, 2025
Page 11 of 15
1. The northwest corner of the site. This is a location that will be used for storm
water detention. It seems like this would be an ideal location for snow stacking.
However, in the event of a snowstorm, the HOA would need to ensure that the
walks are cleared for pedestrians using the walkway.
2. The southwest corner is another possibility and will be modified as townhome
driveways need to be separated as noted earlier in this report. This could potentially
free up space for this purpose.
3. The southeast corner of the site which is showing 7 guest spaces could be an ideal
location for snow stacking. This area would need to be designated for such and
would need appropriate signage installed by the HOA during winter months.
In summary, based on the way the project is designed, there is not a lot of options for snow
removal and/or stacking. The developer will need to evaluate this concern in relation to
the overall design and will need to address this concern using staff’s suggestions along
with other options that will satisfy the Engineering Division’s concerns regarding this
matter.
Garbage collection:
Per the development agreement, all units will have individual garbage cans. The HOA will
require these cans to be stored in the garage of residential units.
School walkway:
A walkway is planned for the northwest corner of the development to provide access to
school children walking to Granger Elementary. While school walkways provide a
convenient point of access without having to walk a greater distance, or be driven to school
by a parent, they can be problematic.
In the proposed application, the walkway is located between two single family lots. Staff
would recommend that the walkway be shifted to the north boundary so it would only affect
one of those lots.
In addition, that location puts the walkway closer to the crosswalk on 1950 West which is
designated as a school crossing. Staff will recommend that the applicant coordinate this
walkway location with the Granger Elementary School Administration.
Storm Drainage:
The applicant has submitted a preliminary drainage plan to handle storm water. Due to the
size of the property the developer is proposing to manage storm water with underground
storage systems and an open detention basin in the northwest corner of the property. These
proposals are currently being reviewed by the Engineering Division and will be resolved
as the project moves through the development process.
Fencing/Tree Preservation:
The development agreement requires that the existing chain link and slat fence along the
north side of the property be removed and replaced with a new 6-foot vinyl fence. 4-foot
wrought iron fencing is required along the east and south sides of the development.
Minutes of Planning Commission Public Hearing January 29, 2025
Page 12 of 15
There are a number of mature trees along 1950 West. The development agreement calls
for the developer to try and keep as many of these trees as possible. This will help add
immediate curb appeal to the single-family dwellings and will help maintain the character
of 1950 West.
Site Management:
The developer will establish a Homeowner’s Association for the entire project. The
association will be responsible to hire a property management company. As per previous
PUD applications, staff will recommend that prior to this development being turned over
to the association, a meeting with staff, developer and Management Company take place.
This will provide an opportunity to ensure that all development standards and
improvements have been completed in accordance with the Planning Commission’s
approval of this project. It should also be noted that the HOA will be responsible for
maintenance of the front yard landscaping of the single-family dwellings on 1950 West.
STAFF ALTERNATIVES:
A. Grant preliminary approval for The Solari PUD subject to the following conditions:
1. That the developer resolve all staff and agency concerns.
2. That this development comply with all provisions listed in the development
agreement.
3. That the developer submit a revised landscape plan and that it be reviewed during
the final plat. Said landscaping plan shall provide measures to ensure water
conservation techniques will be used in accordance with City ordinances and to
address those items outlined in the staff report.
4. That the proposed development comply with all provisions of the West Valley City
Fire Department. This shall include access into and through the project.
5. That the project comply with all requirements outlined by the City Engineering
Division with regards to all dedicated rights-of-way, storm drainage, snow stacking
traffic calming and any other concern noted in their review of the preliminary plat,
storm drain report and geotechnical report.
6. That the developer resolve any issues regarding irrigation ditches and irrigation
systems that may be in use.
7. That compliance be made with Granger Hunter Improvement District, i.e., water
line extensions, connections, water rights and fire protection.
8. That the subdivision name and street names be approved by the Salt Lake County.
Minutes of Planning Commission Public Hearing January 29, 2025
Page 13 of 15
9. That proposed building setbacks be in accordance with the site plan reviewed as
part of this application. Slight modifications can be made if needed in order to
accommodate utilities or other infrastructure. Modifications that deviate
substantially from the approved site plan shall be reviewed by the Planning
Commission. As a minimum standard for the townhomes, the north and south
setbacks shall be 15 feet, and the west setback shall be 20 feet. The east setback
will be governed by the Redwood Road Streetscape. The single-family dwellings
will be subject to the R-1-8 setbacks.
10. That specialty lighting be provided throughout the entire development for
pedestrian ways. Standard City streets lights are required for all dedicated rights-
of-way. A lighting plan shall be provided prior to final plat review.
11. That an entry feature be installed per the development agreement. Location and
design shall be reviewed with the final plat.
12. That building sizes, elevations, colors and materials, be in accordance with those
outlined in the development agreement.
13. That fencing be installed on the north side consisting of a 6-foot vinyl fence and
the east and south sides with a 4-foot wrought iron fence.
14. That the City Transportation Engineer and Engineering Division review and
approve the traffic calming measures needed as part of this development.
15. That the northeast, southeast and southwest open space areas be reviewed to
accommodate internal connectivity.
16. That the soils report be evaluated by the Chief Building Official and City
Engineering Division as it relates to planned basements. Any land drain or other
method to allow basements shall be reviewed and approved by both divisions.
17. That the driveways for those townhomes in the southwest corner of the
development comply with City ordinance as outlined in the staff report.
18. That the school walkway be relocated to the north line of the development.
Coordination with the Granger Elementary Administration is recommended.
B. Continuation, in order for the developer to address issues raised during the public hearing.
Discussion: Steve Lehman presented. The applicant, Paxton Guymon, was present and confirmed
the details of the project.
Minutes of Planning Commission Public Hearing January 29, 2025
Page 14 of 15
Motion: Commissioner Porter motioned to approve PUD-1-2025 subject to the 18 conditions in
the Staff Report. Commissioner Durfee seconded. A voice vote was taken and all members voted
in favor of the motion.
PLANNING COMMISSION BUSINESS:
The Commission considered the Minutes of the Study Meeting held January 8, 2025, and the
Minutes of the Public Hearing held January 15, 2025. There were not 4 Commission members
present who were present on February 8th to vote on January 8, 2025 Minutes so it will be
continued to the February 12, 2025 Meeting. Commissioner Winters motioned to approve the
Minutes of the Public Hearing held January 15, 2025. Commissioner Durfee seconded the
motion. A voice vote was taken and all members voted in favor of the motion.
MOTION TO ADJOURN:
There being no further business, the West Valley City Planning Commission meeting of
Wednesday, January 29, 2025, Commissioner Porter moved to adjourn the meeting at 4:40 PM.
I hereby certify the foregoing to be a true, accurate and complete record of the proceedings of the
Public Hearing of the West Valley City Planning Commission held, January 29, 2025.
Respectfully submitted,
Julie Davis
Julie Davis, Admin Assistant
Minutes of Planning Commission Public Hearing January 29, 2025
Page 15 of 15
Agenda
WEST VALLEY CITY PLANNING COMMISSION AGENDA
The Public Hearing of the West Valley City Planning Commission will be held on Wednesday, January 29,
2025, at 4:00 PM, in West Valley City Hall, 3600 Constitution Blvd., West Valley City, Utah. Members of the
press and public are invited to attend in person or view this meeting live on Zoom at
https://us06web.zoom.us/j/83896786911.
Preliminary application information will be available by 6:00 PM on Tuesday, January 21, 2025 at
https://www.wvc-ut.gov/669/Agendas-Minutes. Staff analyses, as well as any final application materials, will be
updated by 12:00 PM on Monday, January 27, 2025.
Testimonies for or against the proposed applications can be provided to the Planning Commission during the
public hearing or in writing prior to the hearing. If you wish to submit written comments, be advised that this
should be provided to the Planning Staff member assigned to the application at least seven (7) days prior to the
meeting to enable the Planning Commission to properly consider the comments.
AGENDA
GENERAL PLAN/ZONE CHANGE APPLICATION
GPZ-8-2024 Petition by DAI requesting a General Plan change from Commercial/Light Manufacturing to
Medium Density Residential (7 to 12 units/acre) and a zone change from A (Agricultural,
minimum lot size ½ acre) to RM (Multiple Unit Dwelling Residential). The property is located
at 2996 South Redwood Road on 2.48 acres. Staff – Steve Pastorik at 801-963-3545 or
steve.pastorik@wvc-ut.gov. Continued from January 15, 2025 Public Hearing.
SUBDIVISION APPLICATIONS
PUD-1-2025 Brandon Parr with Edge Homes is requesting preliminary approval for the Solari PUD
Subdivision. The subdivision will consist of 245 townhome units, 40 condominium units and
11 single family lots. The property is located at 3688 South Redwood Road is 26.1 acres in
size and is zoned RM. Staff-Steve Lehman at 801-963-3311 or steve.lehman@wvc-ut.gov.
PLANNING COMMISSION BUSINESS
Approval of Minutes from January 8, 2025
Approval of Minutes from January 15, 2025
West Valley City does not discriminate on the basis of race, color, national origin, gender, religion, age or disability in employment or the provision of
services.
If you are planning to attend this public meeting and, due to a disability, need assistance in understanding or participating in the meeting, please
notify the City eight or more hours in advance of the meeting and we will try to provide whatever assistance may be required. The person to contact for
assistance is Julie Davis.
Get email alerts for West Valley City
A daily email when new agendas and minutes are posted.