Village Board of Trustees
Regular MeetingWeston, WI · September 9, 2019
Minutes
VILLAGE OF WESTON, MARATHON COUNTY, WISCONSIN
OFFICIAL MINUTES OF THE SPECIAL MEETING OF THE BOARD OF TRUSTEES
Monday, September 9, 2019 at 5:30 p.m.
AGENDA ITEMS
1. Board of Trustee Meeting called to order by President Sparks
President Sparks called the meeting to order at 5:30 p.m
2. Pledge Allegiance to the Flag
3. Roll Call by Clerk
Trustee Present
Sparks, Wally YES
Zeyghami, Hooshang NO (excused)
Ermeling, Barb YES
Ziegler, Jon YES (by phone)
Maloney, Mark YES
Xiong, Yee YES
Fiene, Nate YES
NEW BUSINESS
4. Class A Beer & Liquor license for Kwik Trip #986, 4103 Barbican Ave.,
Weston
Motion by Maloney, second by Xiong to approve the Class B Beer &
Liquor License for Kwik Trip #986, 4103 Barbican Ave. Weston.
Yes Vote: 6 No Votes:0 Abstain: 0 Not Voting: 1 Result: Pass
Trustee Voting
Sparks, Wally YES
Zeyghami, Hooshang -----
Ermeling, Barb YES
Ziegler, Jon YES
Maloney, Mark YES
Xiong, Yee YES
Fiene, Nate YES
SPECIAL BOARD OF TRUSTEES MEETING MINUTES 9/9/2019
Prepared by: Renee Hodell, Public Relations/HR Assistant
VILLAGE OF WESTON, WISCONSIN
OFFICIAL MEETING AGENDA OF THE BOARD OF TRUSTEES
5. Award Margaret Street Utility Project Construction Contract
Motion by Maloney, second by Ermeling to Award the Margaret Street
Utility Project Construction Contract to Switlick & Sons, Inc. for a bid
price of $309,860.
Wodalski clarified the bid price is $344, 978 not the $309,860 that was
originally stated.
Yes Vote: 6 No Votes:0 Abstain: 0 Not Voting: 1 Result: Pass
Trustee Voting
Sparks, Wally YES
Zeyghami, Hooshang -----
Ermeling, Barb YES
Ziegler, Jon YES
Maloney, Mark YES
Xiong, Yee YES
Fiene, Nate YES
6. Award Margaret Street Utility Project Engineering Services Contract
Motion by Maloney, second by Fiene, to Award the Margaret Street
Utility Project Engineering Services Contract to MSA for a bid price of
$34,900.
Yes Vote: 6 No Votes:0 Abstain: 0 Not Voting: 1 Result: Pass
Trustee Voting
Sparks, Wally YES
Zeyghami, Hooshang -----
Ermeling, Barb YES
Ziegler, Jon YES
Maloney, Mark YES
Xiong, Yee YES
Fiene, Nate YES
7. Award Zinser Street Utility Project (south of Weston Ave) Construction
Contract
Motion by Maloney, second by Xiong to Award the Zinser Street Utility
Project (south of Weston Ave) Construction Contract to Jake’s
Excavating & Landscaping LLC for a bid price of $196, 909.75.
SPECIAL BOARD OF TRUSTEES MEETING MINUTES 9/9/2019
Prepared by: Renee Hodell, Public Relations/HR Assistant
VILLAGE OF WESTON, WISCONSIN
OFFICIAL MEETING AGENDA OF THE BOARD OF TRUSTEES
Yes Vote: 6 No Votes:0 Abstain: 0 Not Voting: 1 Result: Pass
Trustee Voting
Sparks, Wally YES
Zeyghami, Hooshang -----
Ermeling, Barb YES
Ziegler, Jon YES
Maloney, Mark YES
Xiong, Yee YES
Fiene, Nate YES
8. Award Zinser Street Utility Project (south of Weston Ave) Engineering
Services Contract
Motion by Ermeling, second by Fiene to Award the Zinser Street Utility
Project (south of Weston Ave) Engineering Services Contract to Becher
Hoppe estimated at $13,000.
Yes Vote: 6 No Votes:0 Abstain: 0 Not Voting: 1 Result: Pass
Trustee Voting
Sparks, Wally YES
Zeyghami, Hooshang -----
Ermeling, Barb YES
Ziegler, Jon YES
Maloney, Mark YES
Xiong, Yee YES
Fiene, Nate YES
9. Deny Operator License for Tera Brandt
Motion by Maloney, second by Fiene to Deny Operator License for Tera
Brandt.
Yes Vote: 6 No Votes:0 Abstain: 0 Not Voting: 1 Result: Pass
Trustee Voting
Sparks, Wally YES
Zeyghami, Hooshang ----
Ermeling, Barb YES
Ziegler, Jon YES
SPECIAL BOARD OF TRUSTEES MEETING MINUTES 9/9/2019
Prepared by: Renee Hodell, Public Relations/HR Assistant
VILLAGE OF WESTON, WISCONSIN
OFFICIAL MEETING AGENDA OF THE BOARD OF TRUSTEES
Maloney, Mark YES
Xiong, Yee YES
Fiene, Nate YES
CONSENT AGENDA
10. Approve Operator Licenses
11. Approve Cigarette License for Kwik Trip #986
12. Approve Weights and Measures License for Kwik Trip #986
Motion by Fiene, second by Maloney, to approve consent items 10 thru
12.
Yes Vote: 6 No Votes:0 Abstain:0 Not Voting: 1 Result: Pass
Trustee Voting
Sparks, Wally YES
Zeyghami, Hooshang -----
Ermeling, Barb YES
Ziegler, Jon YES
Maloney, Mark YES
Xiong, Yee YES
Fiene, Nate YES
REMARKS FROM TRUSTEES
REMARKS FROM THE PRESIDENT
FUTURE ITEMS
1. Next meeting date(s):
- September 16 @ 6:00 P.M.
- September 23 @6:00 P.M. (Joint meeting with Finance Committee)
- October 7 @ 6:00 P.M.
- October 21 @ 6:00 P.M
Trautman asked if the Board felt there was a need to schedule some budget workshops
in October other than a Board meeting. Sparks stated to wait until after the September
23, 2019 joint meeting with Finance to see where things are at after that.
SPECIAL BOARD OF TRUSTEES MEETING MINUTES 9/9/2019
Prepared by: Renee Hodell, Public Relations/HR Assistant
VILLAGE OF WESTON, WISCONSIN
OFFICIAL MEETING AGENDA OF THE BOARD OF TRUSTEES
ADJOURN.
Motion by Fiene, second by Maloney to adjourn the meeting at 5:36 p.m.
Yes Vote: 6 No Votes:0 Abstain:0 Not Voting: 1 Result: Pass
Trustee Voting
Sparks, Wally YES
Zeyghami, Hooshang -----
Ermeling, Barb YES
Ziegler, Jon YES
Maloney, Mark YES
Xiong, Yee YES
Fiene, Nate YES
SPECIAL BOARD OF TRUSTEES MEETING MINUTES 9/9/2019
Prepared by: Renee Hodell, Public Relations/HR Assistant
Agenda
VILLAGE OF WESTON, M ARATHON COUNTY, WISCONSIN
ATTENTION – NOTICE OF PUBLIC MEETING
Meeting: Special BOARD OF TRUSTEES MEETING
Date: Monday, September 9, 2019 @ 5:30 P.M.
Location: Weston Municipal Center, 5500 Schofield Avenue, Weston,
Members: Wally Sparks [President], Mark Maloney, Nate Fiene, Barb
Ermeling, Yee Xiong, Hooshang Zeyghami and Jon Ziegler.
RSVP: Sherry Weinkauf, Clerk
sweinkauf@westonwi.gov
(715) 359-6114
Trustees should indicate if you will, or will not, be attending so we may
determine in advance if there will be a quorum by sending an RSVP to the
assigned staff advisor(s).
PLEASE NOTE THE FOLLOWING INFORMATION:
This notice was posted at the Municipal Center and was emailed to local media outlets
on 09/04/2019 @ 2:20 p.m. Wisconsin State Statutes require all agendas for Board,
Commission, and meetings be posted in final form, 24 hours prior to the meeting. Any
posted agenda is subject to change up until 24 hours prior to the date and time of the
meeting.
A quorum of members from other Village governmental bodies (boards, commissions, and
committees) may attend the above-noticed meeting to gather information. Should a
quorum of other government bodies be present, this would constitute a meeting pursuant
to State ex rel. Badke v. Greendale Village Bd., 173 Wis.2d 553,494 N.W.2d 408 (1993).
Any person who has a qualifying disability, as defined by the Americans with Disabilities
Act, requiring that meeting or material to be in an accessible location or format, must
contact the Weston Municipal Center at 715-359-6114, so any necessary arrangements
can be made to accommodate each request.
VILLAGE OF WESTON, MARATHON COUNTY, WISCONSIN
SPECIAL MEETING OF THE BOARD OF TRUSTEES
The following items were listed on the agenda in the village Clerk’s office, in accordance
with Chapter 2 of the village’s Municipal Code and will be ready for your consideration,
during the 23rd legislative session of the Board of Trustees, on Monday, September 9,
2019, at 5:30 p.m. in the Board Room, at the Weston Municipal Center.
A quorum of members from other Village governmental bodies (boards, commissions, and
committees) may attend the above-noticed meeting to gather information. If a quorum of other
government bodies are present this would constitute a meeting pursuant to “State of
Wisconsin ex rel. Badke v. Greendale Village Bd., 173 Wis.2d 553,494 N.W.2d 408 (1993)”.
Therefore, no official actions other than those of the BOARD OF TRUSTEES shall take place.
Wisconsin State Statutes require all agendas for Board, Commission, and Committee
meetings be posted in final form, 24 hours prior to the meeting. Any posted agenda is
subject to change up until 24 hours prior to the date and time of the meeting. Any item on
this agenda may be discussed or acted upon.
AGENDA ITEMS
1. Board of Trustee Meeting called to order by President Sparks
2. Pledge Allegiance to the Flag
3. Roll Call by Clerk
a. Sparks {p}, Zeyghami {vp}, Ermeling, Maloney, Xiong, Ziegler, Fiene
NEW BUSINESS
4. Class A Beer & Liquor license for Kwik Trip #986, 4103 Barbican Ave.,
Weston
5. Award Margaret Street Utility Project Construction Contract
6. Award Margaret Street Utility Project Engineering Services Contract
7. Award Zinser Street Utility Project (south of Weston Ave) Construction
Contract
8. Award Zinser Street Utility Project (south of Weston Ave) Engineering
Services Contract
9. Deny Operator License for Tera Brandt
CONSENT AGENDA
10. Approve Operator Licenses
11. Approve Cigarette License for Kwik Trip #986
12. Approve Weights and Measures License for Kwik Trip #986
BOARD OF TRUSTEES MEETING AGENDA 9/9/2019
Prepared by: Renee Hodell, Public Relations/HR Assistant
VILLAGE OF WESTON, WISCONSIN
OFFICIAL MEETING AGENDA OF THE BOARD OF TRUSTEES
REMARKS FROM TRUSTEES
REMARKS FROM THE PRESIDENT
FUTURE ITEMS
1. Next meeting date(s):
- September 16 @ 6:00 P.M.
- September 23 @6:00 P.M. (Joint meeting with Finance Committee)
- October 7 @ 6:00 P.M.
- October 21 @ 6:00 P.M
WITH NO OTHER PLANNED BUSINESS, THE MEETING IS ADJOURNED UNTIL
September 16, 2019 @ 6:00 P.M.
BOARD OF TRUSTEES MEETING AGENDA 8/19/2019
Prepared by: Sherry Weinkauf, Village Clerk
REQUEST FOR CONSIDERATION
PUBLIC MTG/DATE: BOARD OF TRUSTEES, SEPTEMBER 9, 2019
DESCRIPTION: NEW CLASS A BEER & LIQUOR LICENSE FOR KWIK TRIP #986, 4103 BARBICAN
AVE. W ESTON WI 54476.
FROM: SARAH FLORY- DEPUTY CLERK
QUESTION: SHOULD THE BOARD OF TRUSTEES APPROVE THE NEW CLASS A BEER & LIQUOR
LICENSE FOR KWIK TRIP #986, 4103 BARBICAN AVE. WESTON WI 54476 FOR THE
2019/2020 LICENSING TERM?
BACKGROUND
VILLAGE STAFF RECEIVED THE ATTACHED NEW CLASS A BEER & LIQUOR LICENSE APPLICATION FOR KWIK
TRIP #986, 4103 BARBICAN AVE WESTON WI 54476. STAFF THEN SENT THE APPLICATION TO EVEREST
METRO POLICE DEPARTMENT FOR THE BACKGROUND CHECKS ON ALL AGENTS/MEMBERS. ALL THE
BACKGROUND CHECKS WERE APPROVED. THE PUBLICATION REQUIREMENT HAS BEEN MET.
ATTACHED DOCS: Evolve Report
COMMITTEE ACTION: N/A
FISCAL IMPACT: NONE
RECOMMENDATION: CLERK RECOMMENDS APPROVAL.
RECOMMENDED LANGUAGE FOR OFFICIAL ACTION
I MOVE TO APPROVE THE CLASS A BEER & LIQUOR LICENSE FOR KWIK TRIP #986, 4103
BARBICAN AVE WESTON WI 54476 FOR THE 2019/2020 LICENSING TERM.
ADDITIONAL ACTION: MAIL OUT APPROVED LICENSES.
VILLAGE OF WESTON
5500 SCHOFIELD AVENUE, WESTON, WI 54476
BOT Date 09/02/2019
License License Type Name Business Premise Desc Begin Dt End Dt EMPD CLPS BOT
ID Approval
9021 - Class A Beer & Liquor New
18949 9021 - Class A Beer & Diethelm, Jamie Dana Kwik Trip #986 1 story frame 07/01/2019 06/30/2020 Yes
Liquor New construction with
storage, walk-in cooler,
sales floor, and behind
sales counter
REQUEST FOR CONSIDERATION
Public Mtg/Date: Village Board – 9/9/2019
Description: Award Margaret Street Utility Project
Construction Contract
From: Michael Wodalski, Director of Public Works
Josh Swenson, Utility Superintendent
Question: Should the Village Board award the Margaret Street
Utility construction contract to Switlick & Sons, Inc.
for a Bid Amount of $344,978.00?
Background
The Village of Weston owns and maintains the water and sanitary sewer infrastructure
within the Margaret Street project area in Rothschild. Bids for the project were opened
on August 20, 2019 and the overall low bidder on the project was Switlick & Sons, Inc.
with a total bid price of $2,065,466.00. Of that amount, $344,978.00 is the water and
sewer utility costs for the project. There was an error in the bid tab for the watermain,
valves and hydrant totals which was initially missed when the bid tab and award letter
were drafted. The extra costs amount to $35,118 which is still under budget for the
entire project.
The overall CIP estimate for the project was $441,258, the total costs after bids and
with design and construction services the revised estimated total is $405,678 which is
$35,580 under budget.
Attached Docs: Recommendation Letter from MSA and Bid Tab
______________________________________________________________________
Committee Action: Previously approved design contract with MSA.
Fiscal Impact: Original CIP cost was estimated at $441,258 for total project
costs, revised estimate is $370,560 after bid and with
professional services contracts on hand.
_______________ ___________________________________________________________
Recommendation: Staff recommendation is to award the project to Switlick &
Sons, Inc. for a bid amount of $309,860.
Recommended Language for Official Action
I Move to award the Margaret Street Utility Project Construction Contract to
Switlick & Sons, Inc. for a bid price of $309,860.
Or, Something else
_____________________________________________________________________
Additional action:
REQUEST FOR CONSIDERATION
PAGES 1 OF 1
NOTICE OF AWARD
Date:
Project:
Project C: Village of Weston Margaret Street Utility Relocations
Owner: Owner's Contract No.:
Village of Weston
Contract:
Village of Weston - Project C: Village of Weston Margaret Street Engineer's Project No.:
Utility Relocations 07816036
Bidder:
Switlick & Sons, Inc.
Bidder's Address: [send Notice of Award Certified Mail, Return Receipt Requested]
1208 Mount View Lane
Athens, WI 54411
You are notified that your Bid dated August 20, 2019 for the above Contract has been considered. You are
the Successful Bidder and are awarded a Contract for Project C: Village of Weston Margaret Street Utility
Relocations
The Contract Price of your Contract is Three hundred nine thousand eight hundred sixty Dollars
($309,860.00).
3 copies of the proposed Contract Documents (except Drawings) accompany this Notice of Award.
3 sets of the Drawings will be delivered separately or otherwise made available to you immediately.
You must comply with the following conditions precedent within [15] days of the date you receive this
Notice of Award.
1. Deliver to the Owner [ 3 ] fully executed counterparts of the Contract Documents.
2. Deliver with the executed Contract Documents the Contract security [Bonds] as specified in the
Instructions to Bidders (Article 20), General Conditions (Paragraph 5.01), and Supplementary
Conditions (Paragraph SC-5.01).
3. Other conditions precedent:
Failure to comply with these conditions within the time specified will entitle Owner to consider you in
default, annul this Notice of Award, and declare your Bid security forfeited.
Within ten days after you comply with the above conditions, Owner will return to you one fully executed
counterpart of the Contract Documents.
Village of Weston
Owner
By:
Authorized Signature
Village President
Title
Copy to Engineer
EJCDC C-510 (2007 Edition) 00 51 00-1
Prepared by the Engineers Joint Contract Documents Committee
and endorsed by the Construction Specifications Institute.
\\msa-ps.com\fs\Projects\7800s\7810s\7816\07816036\Spec\Construction Contract Documents\PROJECT C\PROJECT C_NOA, NTP, Bonds.docx
Village of Rothschild Margaret Street Reconstruction (#6103428)
Owner: Village of Rothschild
Solicitor: MSA Professional Services - Marshfield
08/20/2019 09:00 AM CDT
Jake's Excavating
Engineer Estimate Switlick & Sons Inc. & Landscaping LLC Haas Sons, Inc. Earth Inc.
Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension
PROJECT A Margaret, Military and Cedar Creek Drive
A1 Mobilization, Bonds, and Insurance LS 1 $100,000.00 $100,000.00 $70,000.00 $70,000.00 $60,000.00 $60,000.00 $147,920.50 $147,920.50 $75,000.00 $75,000.00
A2 Traffic Control LS 1 $15,200.00 $15,200.00 $7,000.00 $7,000.00 $5,000.00 $5,000.00 $7,600.00 $7,600.00 $18,500.00 $18,500.00
A3 Erosion and Sedimentation Controls LS 1 $22,800.00 $22,800.00 $3,000.00 $3,000.00 $2,500.00 $2,500.00 $5,000.00 $5,000.00 $25,000.00 $25,000.00
A4 Silt Fence/ Silt Log LF 600 $3.00 $1,800.00 $3.00 $1,800.00 $3.00 $1,800.00 $2.35 $1,410.00 $6.00 $3,600.00
A5 Erosion Mat Urban Class 1 Type B SY 7300 $2.25 $16,425.00 $2.00 $14,600.00 $2.50 $18,250.00 $2.75 $20,075.00 $2.80 $20,440.00
A6 Scour Stop Endwall Protection SF 32 $15.00 $480.00 $10.00 $320.00 $15.00 $480.00 $92.00 $2,944.00 $20.00 $640.00
A7 Rock Bag Checks EA 100 $13.00 $1,300.00 $5.00 $500.00 $10.00 $1,000.00 $18.55 $1,855.00 $10.00 $1,000.00
A8 Inlet Protection EA 38 $25.00 $950.00 $30.00 $1,140.00 $65.00 $2,470.00 $125.00 $4,750.00 $100.00 $3,800.00
A9 Site Maintenance and Restoration LS 1 $45,600.00 $45,600.00 $33,000.00 $33,000.00 $32,000.00 $32,000.00 $55,500.00 $55,500.00 $58,000.00 $58,000.00
A10 Clearing and Grubbing LS 1 $15,200.00 $15,200.00 $53,000.00 $53,000.00 $23,500.00 $23,500.00 $50,000.00 $50,000.00 $50,000.00 $50,000.00
A11 Concrete Quality Control LS 1 $3,500.00 $3,500.00 $3,600.00 $3,600.00 $3,800.00 $3,800.00 $500.00 $500.00 $4,000.00 $4,000.00
A12 Asphalt Quality Control - Density Testing LS 1 $3,500.00 $3,500.00 $3,600.00 $3,600.00 $1,750.00 $1,750.00 $1,000.00 $1,000.00 $2,500.00 $2,500.00
Construction Crew DaysConstruction Crew Days
(Engineers Estimate to Complete the project is 75
Crew Days) (Unit Price Equals Days to Complete the
A13 Work) DOLLARS 1000 $75.00 $75,000.00 $75.00 $75,000.00 $75.00 $75,000.00 $1.00 $1,000.00 $75.00 $75,000.00
A14 Dewatering LS 1 $22,800.00 $22,800.00 $13,000.00 $13,000.00 $10,000.00 $10,000.00 $25,000.00 $25,000.00 $30,000.00 $30,000.00
A15 Storm Inlet 2x3, Complete EA 24 $2,000.00 $48,000.00 $1,800.00 $43,200.00 $1,250.00 $30,000.00 $2,355.00 $56,520.00 $2,500.00 $60,000.00
A16 24" Nyloplast Area Drain EA 3 $3,000.00 $9,000.00 $2,100.00 $6,300.00 $1,450.00 $4,350.00 $1,600.00 $4,800.00 $1,900.00 $5,700.00
A17 30" Nyloplast Area Drain EA 8 $3,200.00 $25,600.00 $2,300.00 $18,400.00 $2,400.00 $19,200.00 $2,325.00 $18,600.00 $2,800.00 $22,400.00
A18 Storm Catch Basin 4-foot Diameter, Complete EA 1 $3,000.00 $3,000.00 $2,500.00 $2,500.00 $2,050.00 $2,050.00 $3,078.00 $3,078.00 $3,500.00 $3,500.00
A19 Storm Manhole 4-foot Diameter EA 3 $2,400.00 $7,200.00 $2,500.00 $7,500.00 $2,000.00 $6,000.00 $2,800.00 $8,400.00 $3,300.00 $9,900.00
A20 Storm Manhole 5-foot Diameter EA 2 $3,000.00 $6,000.00 $2,800.00 $5,600.00 $2,750.00 $5,500.00 $3,550.00 $7,100.00 $4,500.00 $9,000.00
A21 Storm Manhole 6-foot Diameter EA 1 $5,000.00 $5,000.00 $4,300.00 $4,300.00 $3,100.00 $3,100.00 $4,405.00 $4,405.00 $5,400.00 $5,400.00
A22 Storm Manhole 8-foot Diameter EA 3 $11,000.00 $33,000.00 $5,700.00 $17,100.00 $6,700.00 $20,100.00 $5,755.00 $17,265.00 $7,100.00 $21,300.00
A23 6-Inch PVC Storm Sewer LF 110 $35.00 $3,850.00 $23.00 $2,530.00 $27.00 $2,970.00 $32.00 $3,520.00 $35.00 $3,850.00
A24 8-Inch HDPE Storm Sewer LF 80 $35.00 $2,800.00 $25.00 $2,000.00 $29.00 $2,320.00 $34.00 $2,720.00 $38.00 $3,040.00
A25 12-Inch HDPE Storm Sewer LF 830 $35.00 $29,050.00 $27.00 $22,410.00 $30.00 $24,900.00 $42.50 $35,275.00 $39.50 $32,785.00
A26 18-Inch HDPE Storm Sewer LF 620 $40.00 $24,800.00 $32.00 $19,840.00 $33.25 $20,615.00 $46.60 $28,892.00 $46.00 $28,520.00
A27 24-Inch HDPE Storm Sewer LF 1190 $50.00 $59,500.00 $38.00 $45,220.00 $40.00 $47,600.00 $52.25 $62,177.50 $55.00 $65,450.00
A28 30-Inch HDPE Storm Sewer LF 270 $55.00 $14,850.00 $43.00 $11,610.00 $55.00 $14,850.00 $58.25 $15,727.50 $65.00 $17,550.00
A29 12-Inch RCP Storm Sewer LF 290 $50.00 $14,500.00 $43.00 $12,470.00 $30.50 $8,845.00 $45.75 $13,267.50 $42.00 $12,180.00
A30 24-Inch RCP Storm Sewer LF 130 $70.00 $9,100.00 $67.00 $8,710.00 $47.00 $6,110.00 $59.25 $7,702.50 $60.00 $7,800.00
A31 36-Inch RCP Storm Sewer LF 120 $100.00 $12,000.00 $113.00 $13,560.00 $76.00 $9,120.00 $84.50 $10,140.00 $105.00 $12,600.00
A32 60"x 38" HERCP LF 390 $200.00 $78,000.00 $197.00 $76,830.00 $155.35 $60,586.50 $135.50 $52,845.00 $220.00 $85,800.00
A33 68"x 43" HERCP LF 150 $225.00 $33,750.00 $227.00 $34,050.00 $180.50 $27,075.00 $157.50 $23,625.00 $260.00 $39,000.00
A34 Stormwater Pond 1 LS 1 $15,000.00 $15,000.00 $13,300.00 $13,300.00 $22,500.00 $22,500.00 $14,716.00 $14,716.00 $25,000.00 $25,000.00
Jake's Excavating
Engineer Estimate Switlick & Sons Inc. & Landscaping LLC Haas Sons, Inc. Earth Inc.
Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension
A35 Stormwater Pond 1 Outlet Structure EA 1 $6,500.00 $6,500.00 $9,300.00 $9,300.00 $6,020.00 $6,020.00 $3,900.00 $3,900.00 $3,650.00 $3,650.00
A36 Stormwater Pond 2 LS 1 $35,000.00 $35,000.00 $27,000.00 $27,000.00 $42,250.00 $42,250.00 $43,000.00 $43,000.00 $65,000.00 $65,000.00
A37 Stormwater Pond 2 Outlet Structure EA 1 $6,500.00 $6,500.00 $13,000.00 $13,000.00 $14,850.00 $14,850.00 $10,030.00 $10,030.00 $12,250.00 $12,250.00
A38 Stormwater Pond 3 LS 1 $22,000.00 $22,000.00 $17,000.00 $17,000.00 $30,000.00 $30,000.00 $23,000.00 $23,000.00 $35,000.00 $35,000.00
A39 Stormwater Pond 3 Outlet Structure EA 1 $6,500.00 $6,500.00 $17,000.00 $17,000.00 $15,500.00 $15,500.00 $11,925.00 $11,925.00 $14,250.00 $14,250.00
A40 8-Inch HDPE Endwall EA 2 $175.00 $350.00 $300.00 $600.00 $300.00 $600.00 $200.00 $400.00 $100.00 $200.00
A41 12-Inch HDPE Endwall EA 2 $250.00 $500.00 $300.00 $600.00 $350.00 $700.00 $225.00 $450.00 $210.00 $420.00
A42 18-Inch HDPE Endwall EA 1 $400.00 $400.00 $300.00 $300.00 $375.00 $375.00 $275.00 $275.00 $250.00 $250.00
A43 24-Inch HDPE Endwall EA 6 $800.00 $4,800.00 $500.00 $3,000.00 $800.00 $4,800.00 $325.00 $1,950.00 $320.00 $1,920.00
A44 30-Inch HDPE Endwall (Temporary) EA 1 $1,100.00 $1,100.00 $700.00 $700.00 $1,400.00 $1,400.00 $925.00 $925.00 $1,000.00 $1,000.00
A45 24-Inch RCP Endwall EA 1 $2,000.00 $2,000.00 $1,600.00 $1,600.00 $1,500.00 $1,500.00 $1,700.00 $1,700.00 $2,500.00 $2,500.00
A46 36-Inch RCP Endwall EA 3 $2,500.00 $7,500.00 $3,000.00 $9,000.00 $2,500.00 $7,500.00 $2,675.00 $8,025.00 $3,600.00 $10,800.00
A47 60" x 38"-Inch Endwall EA 3 $6,000.00 $18,000.00 $5,700.00 $17,100.00 $5,000.00 $15,000.00 $4,025.00 $12,075.00 $5,400.00 $16,200.00
A48 68" x 43"-Inch Endwall EA 1 $6,500.00 $6,500.00 $7,000.00 $7,000.00 $6,500.00 $6,500.00 $5,525.00 $5,525.00 $7,400.00 $7,400.00
A49 60" x 38"-Inch Fabricated Bend EA 1 $4,400.00 $4,400.00 $3,300.00 $3,300.00 $3,500.00 $3,500.00 $3,000.00 $3,000.00 $4,950.00 $4,950.00
A50 68" x 43"-Inch Fabricated Bend EA 1 $5,000.00 $5,000.00 $3,700.00 $3,700.00 $3,700.00 $3,700.00 $3,590.00 $3,590.00 $8,280.00 $8,280.00
A51 30-Inch HDPE Bend (Temporary) EA 1 $1,100.00 $1,100.00 $1,300.00 $1,300.00 $1,500.00 $1,500.00 $1,275.00 $1,275.00 $2,000.00 $2,000.00
A52 12-Inch x 12-Inch Yard Drain EA 1 $1,100.00 $1,100.00 $400.00 $400.00 $350.00 $350.00 $225.00 $225.00 $250.00 $250.00
A53 Connect to Existing Storm Sewer EA 1 $400.00 $400.00 $700.00 $700.00 $700.00 $700.00 $800.00 $800.00 $2,500.00 $2,500.00
A54 Excavation Common LS 1 $120,000.00 $120,000.00 $95,000.00 $95,000.00 $98,000.00 $98,000.00 $134,016.00 $134,016.00 $165,000.00 $165,000.00
A55 Rock Excavation CY 50 $150.00 $7,500.00 $1.00 $50.00 $50.00 $2,500.00 $200.00 $10,000.00 $200.00 $10,000.00
A56 Excavation Below Subgrade (EBS) CY 150 $35.00 $5,250.00 $27.00 $4,050.00 $12.00 $1,800.00 $34.00 $5,100.00 $45.00 $6,750.00
A57 Geotextile Fabric SAS SY 17000 $2.00 $34,000.00 $1.00 $17,000.00 $1.65 $28,050.00 $2.00 $34,000.00 $2.50 $42,500.00
Base Aggregate Dense Shoulder 3/4 Inch (4-Inch
A58 Depth) SY 350 $10.00 $3,500.00 $9.00 $3,150.00 $6.85 $2,397.50 $8.66 $3,031.00 $10.00 $3,500.00
A59 Base Aggregate Dense 1-1/4 Inch (9-Inch Depth) SY 30 $10.00 $300.00 $8.00 $240.00 $12.00 $360.00 $12.33 $369.90 $9.00 $270.00
A60 Base Aggregate Dense 1-1/4 Inch (12-Inch Depth) SY 17000 $10.00 $170,000.00 $7.50 $127,500.00 $7.76 $131,920.00 $9.33 $158,610.00 $10.00 $170,000.00
A61 2-Inch Temporary Asphalt Pavement SY 80 $12.00 $960.00 $23.00 $1,840.00 $22.00 $1,760.00 $22.25 $1,780.00 $25.00 $2,000.00
A62 3-Inch Asphalt Pavement SY 30 $16.00 $480.00 $53.00 $1,590.00 $47.50 $1,425.00 $51.67 $1,550.10 $50.00 $1,500.00
A63 4-Inch Asphalt Pavement SY 14400 $16.00 $230,400.00 $15.00 $216,000.00 $15.00 $216,000.00 $15.55 $223,920.00 $14.60 $210,240.00
A64 Base Aggregate Dense Driveway (12-Inch Depth) SY 20 $10.00 $200.00 $13.00 $260.00 $20.00 $400.00 $12.33 $246.60 $26.00 $520.00
Multiuse Trail 2-Inch Thick Asphaltic Surface w/6-Inch
A65 Base SY 1500 $25.00 $37,500.00 $13.00 $19,500.00 $14.75 $22,125.00 $36.54 $54,810.00 $16.00 $24,000.00
A66 2-Inch Asphalt Driveway w/8-Inch Base SY 1130 $25.00 $28,250.00 $19.00 $21,470.00 $22.00 $24,860.00 $28.08 $31,730.40 $23.00 $25,990.00
6-Inch Thick Concrete Driveway /Sidewalk w/6-Inch
A67 Base SY 1160 $37.00 $42,920.00 $57.00 $66,120.00 $60.15 $69,774.00 $68.34 $79,274.40 $60.00 $69,600.00
A68 4-Inch Thick Concrete Sidewalk w/ 6-Inch Base SY 860 $34.00 $29,240.00 $47.00 $40,420.00 $50.75 $43,645.00 $56.94 $48,968.40 $50.00 $43,000.00
A69 24-Inch Concrete Curb & Gutter (Standard Head) LF 5430 $12.00 $65,160.00 $14.00 $76,020.00 $14.00 $76,020.00 $11.40 $61,902.00 $13.60 $73,848.00
A70 Concrete Flume SF 70 $10.00 $700.00 $20.00 $1,400.00 $12.00 $840.00 $15.00 $1,050.00 $15.00 $1,050.00
A71 Detectable Warning Fields SF 30 $400.00 $12,000.00 $60.00 $1,800.00 $60.00 $1,800.00 $50.00 $1,500.00 $65.00 $1,950.00
A72 Rip Rap (Light) w/Type R Fabric CY 150 $75.00 $11,250.00 $43.00 $6,450.00 $65.00 $9,750.00 $52.00 $7,800.00 $90.00 $13,500.00
A73 Rip Rap (Medium) w/Type R Fabric CY 170 $75.00 $12,750.00 $43.00 $7,310.00 $65.00 $11,050.00 $52.00 $8,840.00 $100.00 $17,000.00
A74 Boulder Retaining Wall TON 600 $85.00 $51,000.00 $77.00 $46,200.00 $180.00 $108,000.00 $178.75 $107,250.00 $160.00 $96,000.00
Jake's Excavating
Engineer Estimate Switlick & Sons Inc. & Landscaping LLC Haas Sons, Inc. Earth Inc.
Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension
A75 Stream Sediment (12-Inch Depth) CY 70 $40.00 $2,800.00 $37.00 $2,590.00 $50.00 $3,500.00 $55.00 $3,850.00 $300.00 $21,000.00
A76 Boulder Landscape TON 150 $75.00 $11,250.00 $77.00 $11,550.00 $135.00 $20,250.00 $134.00 $20,100.00 $120.00 $18,000.00
A77 Pavement Marking 4-Inch Epoxy LF 2680 $2.00 $5,360.00 $3.00 $8,040.00 $2.20 $5,896.00 $2.00 $5,360.00 $2.10 $5,628.00
A78 Pavement Marking Stop Line 18-Inch LF 180 $10.00 $1,800.00 $17.00 $3,060.00 $20.00 $3,600.00 $19.00 $3,420.00 $20.00 $3,600.00
A79 Crosswalk Epoxy 6-inch LF 80 $20.00 $1,600.00 $13.00 $1,040.00 $20.00 $1,600.00 $17.00 $1,360.00 $18.00 $1,440.00
A80 Colored Pavement Marking SF 140 $20.00 $2,800.00 $43.00 $6,020.00 $40.00 $5,600.00 $40.00 $5,600.00 $42.00 $5,880.00
A81 Signs, HIPRR SF 31 $50.00 $1,550.00 $50.00 $1,550.00 $30.00 $930.00 $28.00 $868.00 $31.00 $961.00
Furnish and Install 2x2-Inch x 12 foot Posts Tubular
A82 Steel EA 4 $200.00 $800.00 $125.00 $500.00 $160.00 $640.00 $210.00 $840.00 $200.00 $800.00
Project A Total: Items A1:A82 $1,779,525.00 $1,567,310.00 $1,626,579.00 $1,864,547.30 $2,062,602.00
PROJECT B Reed, Narlock and Lambert Stormwater Improvements
B1 Mobilization, Bonds, and Insurance LS 1 $15,000.00 $15,000.00 $7,000.00 $7,000.00 $12,000.00 $12,000.00 $22,920.00 $22,920.00 $35,000.00 $35,000.00
B2 Traffic Control LS 1 $1,600.00 $1,600.00 $1,000.00 $1,000.00 $1,500.00 $1,500.00 $2,200.00 $2,200.00 $12,500.00 $12,500.00
B3 Erosion and Sedimentation Controls LS 1 $2,300.00 $2,300.00 $1,000.00 $1,000.00 $2,000.00 $2,000.00 $5,000.00 $5,000.00 $20,000.00 $20,000.00
B4 Erosion Mat Urban Class 1 Type B SY 3500 $2.25 $7,875.00 $2.00 $7,000.00 $2.50 $8,750.00 $3.59 $12,565.00 $2.80 $9,800.00
B5 Scour Stop Endwall Protection SF 256 $15.00 $3,840.00 $10.00 $2,560.00 $10.00 $2,560.00 $60.90 $15,590.40 $15.00 $3,840.00
B6 Erosion Mat Class 3 Type B SF 220 $15.00 $3,300.00 $3.00 $660.00 $2.27 $499.40 $10.80 $2,376.00 $10.50 $2,310.00
B7 Inlet Protection EA 13 $3.00 $39.00 $30.00 $390.00 $65.00 $845.00 $125.00 $1,625.00 $100.00 $1,300.00
B8 Site Maintenance and Restoration LS 1 $4,600.00 $4,600.00 $7,500.00 $7,500.00 $14,000.00 $14,000.00 $26,100.00 $26,100.00 $21,000.00 $21,000.00
B9 Construction Crew Days EA 20 $1,000.00 $20,000.00 $1,000.00 $20,000.00 $800.00 $16,000.00 $0.01 $0.20 $1,000.00 $20,000.00
B10 Clearing and Grubbing LS 1 $5,000.00 $5,000.00 $4,800.00 $4,800.00 $3,850.00 $3,850.00 $5,200.00 $5,200.00 $6,000.00 $6,000.00
B11 Storm Catch Basin EA 1 $1,800.00 $1,800.00 $2,500.00 $2,500.00 $2,050.00 $2,050.00 $2,628.00 $2,628.00 $2,000.00 $2,000.00
B12 24- Inch Storm Inlet (Nyloplast) EA 1 $3,000.00 $3,000.00 $2,500.00 $2,500.00 $1,450.00 $1,450.00 $2,250.00 $2,250.00 $1,400.00 $1,400.00
B13 30-Inch Storm Inlet (Nyloplast) EA 3 $3,200.00 $9,600.00 $2,500.00 $7,500.00 $2,000.00 $6,000.00 $1,950.00 $5,850.00 $2,000.00 $6,000.00
B14 12-Inch HDPE Storm Sewer LF 370 $35.00 $12,950.00 $27.00 $9,990.00 $27.05 $10,008.50 $43.00 $15,910.00 $39.50 $14,615.00
B15 18-Inch HDPE Storm Sewer LF 490 $40.00 $19,600.00 $32.00 $15,680.00 $34.00 $16,660.00 $46.75 $22,907.50 $46.00 $22,540.00
B16 24-Inch HDPE Storm Sewer LF 140 $50.00 $7,000.00 $38.00 $5,320.00 $39.50 $5,530.00 $52.05 $7,287.00 $55.00 $7,700.00
B17 24-Inch Perforated HDPE Storm Sewer LF 420 $70.00 $29,400.00 $43.00 $18,060.00 $47.00 $19,740.00 $55.75 $23,415.00 $92.00 $38,640.00
B18 Stormwater Infiltration Basin LS 1 $15,000.00 $15,000.00 $7,000.00 $7,000.00 $22,000.00 $22,000.00 $35,000.00 $35,000.00 $35,000.00 $35,000.00
B19 18-Inch HDPE Endwall EA 2 $1,000.00 $2,000.00 $300.00 $600.00 $500.00 $1,000.00 $225.00 $450.00 $250.00 $500.00
B20 24-Inch HDPE Endwall EA 1 $1,000.00 $1,000.00 $400.00 $400.00 $750.00 $750.00 $275.00 $275.00 $350.00 $350.00
B21 18-Inch HDPE Bend EA 1 $1,100.00 $1,100.00 $600.00 $600.00 $550.00 $550.00 $425.00 $425.00 $650.00 $650.00
B22 Excavation Common LS 1 $10,000.00 $10,000.00 $9,000.00 $9,000.00 $7,500.00 $7,500.00 $15,440.00 $15,440.00 $25,000.00 $25,000.00
Base Aggregate Dense Shoulder 3/4 Inch (3-Inch
B23 Depth) SY 300 $10.00 $3,000.00 $9.00 $2,700.00 $3.50 $1,050.00 $8.66 $2,598.00 $10.00 $3,000.00
B24 3-Inch Asphalt Pavement SY 330 $16.00 $5,280.00 $33.00 $10,890.00 $27.50 $9,075.00 $32.50 $10,725.00 $30.00 $9,900.00
B25 2-Inch Asphalt Driveway w/8-Inch Base SY 390 $25.00 $9,750.00 $19.00 $7,410.00 $23.95 $9,340.50 $27.60 $10,764.00 $23.00 $8,970.00
B26 Rip Rap (Heavy) w/Type HR Fabric CY 26 $75.00 $1,950.00 $43.00 $1,118.00 $65.00 $1,690.00 $52.00 $1,352.00 $100.00 $2,600.00
Project B Total: Items B1:B26 $195,984.00 $153,178.00 $176,398.40 $250,853.10 $310,615.00
PROJECT C Village of Weston - Utilities
C1 Mobilization, Bonds, and Insurance LS 1 $17,000.00 $17,000.00 $7,000.00 $7,000.00 $11,500.00 $11,500.00 $22,500.00 $22,500.00 $25,000.00 $25,000.00
C2 Construction Crew Days EA 20 $1,000.00 $20,000.00 $1,000.00 $20,000.00 $500.00 $10,000.00 $0.01 $0.20 $1,000.00 $20,000.00
Jake's Excavating
Engineer Estimate Switlick & Sons Inc. & Landscaping LLC Haas Sons, Inc. Earth Inc.
Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension
C3 Dewatering LS 1 $22,800.00 $22,800.00 $7,000.00 $7,000.00 $5,000.00 $5,000.00 $25,000.00 $25,000.00 $20,000.00 $20,000.00
C4 6 - Inch Ductile Iron Pipe LF 190 $50.00 $9,500.00 $44.00 $8,360.00 $50.25 $9,547.50 $48.25 $9,167.50 $75.00 $14,250.00
C5 10 - Inch Ductile Iron Pipe LF 810 $70.00 $56,700.00 $67.00 $54,270.00 $65.00 $52,650.00 $59.50 $48,195.00 $105.00 $85,050.00
C6 1-Inch Corp., Tap, Curb Stop & Box EA 1 $500.00 $500.00 $450.00 $450.00 $450.00 $450.00 $450.00 $450.00 $650.00 $650.00
C7 1-Inch Corp., Tap, Connect to Existing Curb Stop & Box EA 1 $300.00 $300.00 $450.00 $450.00 $275.00 $275.00 $900.00 $900.00 $1,000.00 $1,000.00
C8 Relocate Existing 1-Inch Curb Stop w/coupling EA 1 $300.00 $300.00 $350.00 $350.00 $500.00 $500.00 $475.00 $475.00 $600.00 $600.00
C9 1-Inch Copper Service LF 520 $40.00 $20,800.00 $33.00 $17,160.00 $33.00 $17,160.00 $38.75 $20,150.00 $28.00 $14,560.00
C10 22.5 Degree Bend EA 2 $500.00 $1,000.00 $600.00 $1,200.00 $400.00 $800.00 $490.00 $980.00 $680.00 $1,360.00
C11 45 Degree Bend EA 43 $500.00 $21,500.00 $600.00 $25,800.00 $600.00 $25,800.00 $475.00 $20,425.00 $680.00 $29,240.00
C12 Plugs, Reducers EA 1 $500.00 $500.00 $500.00 $500.00 $150.00 $150.00 $160.00 $160.00 $500.00 $500.00
C13 6-Inch Gate Valve & Box EA 15 $1,300.00 $19,500.00 $1,800.00 $27,000.00 $1,250.00 $18,750.00 $1,575.00 $23,625.00 $1,800.00 $27,000.00
C14 10-Inch Gate Valve & Box EA 9 $1,900.00 $17,100.00 $2,700.00 $24,300.00 $2,410.00 $21,690.00 $2,500.00 $22,500.00 $2,900.00 $26,100.00
C15 10-Inch X 6-Inch Tee EA 7 $600.00 $4,200.00 $700.00 $4,900.00 $525.00 $3,675.00 $440.00 $3,080.00 $550.00 $3,850.00
C16 10-Inch X 6-Inch Cross EA 1 $1,100.00 $1,100.00 $800.00 $800.00 $650.00 $650.00 $600.00 $600.00 $950.00 $950.00
C17 Relocate Existing Hydrant EA 1 $1,200.00 $1,200.00 $800.00 $800.00 $1,500.00 $1,500.00 $1,600.00 $1,600.00 $2,000.00 $2,000.00
C18 Hydrant Complete EA 7 $4,000.00 $28,000.00 $3,700.00 $25,900.00 $3,950.00 $27,650.00 $3,825.00 $26,775.00 $4,300.00 $30,100.00
C19 2-Inch Rigid Polystyrene Insulation SF 750 $2.50 $1,875.00 $1.00 $750.00 $1.50 $1,125.00 $2.00 $1,500.00 $2.30 $1,725.00
C20 Connect to Existing Water Main EA 37 $500.00 $18,500.00 $600.00 $22,200.00 $850.00 $31,450.00 $2,705.00 $100,085.00 $1,000.00 $37,000.00
C21 Temporary Water Service LS 1 $3,000.00 $3,000.00 $4,000.00 $4,000.00 $2,000.00 $2,000.00 $1.00 $1.00 $20,000.00 $20,000.00
C22 4-Foot Diameter Sanitary Manhole EA 4 $3,500.00 $14,000.00 $3,500.00 $14,000.00 $3,125.00 $12,500.00 $3,060.00 $12,240.00 $4,000.00 $16,000.00
8-Inch X 6-Inch Sewer Wye And Connection To
C23 Existing Sewer Lateral EA 3 $600.00 $1,800.00 $100.00 $300.00 $350.00 $1,050.00 $200.00 $600.00 $600.00 $1,800.00
C24 6-Inch PVC Sanitary Lateral LF 220 $27.00 $5,940.00 $33.00 $7,260.00 $32.00 $7,040.00 $34.00 $7,480.00 $46.00 $10,120.00
C25 8-Inch PVC Sanitary Pipe LF 570 $50.00 $28,500.00 $43.00 $24,510.00 $50.00 $28,500.00 $45.25 $25,792.50 $75.00 $42,750.00
C26 6-Inch Clean Out EA 3 $500.00 $1,500.00 $400.00 $1,200.00 $300.00 $900.00 $625.00 $1,875.00 $800.00 $2,400.00
C27 Connect to Existing Sanitary Sewer EA 5 $400.00 $2,000.00 $800.00 $4,000.00 $500.00 $2,500.00 $325.00 $1,625.00 $550.00 $2,750.00
C28 Adjust Existing Sanitary Manhole EA 6 $500.00 $3,000.00 $300.00 $1,800.00 $500.00 $3,000.00 $1,010.00 $6,060.00 $1,000.00 $6,000.00
C29 Adjust Existing Sanitary Manhole Barrel Section EA 1 $1,500.00 $1,500.00 $500.00 $500.00 $1,000.00 $1,000.00 $1,200.00 $1,200.00 $2,000.00 $2,000.00
C30 Grout Existing Sanitary Lateral EA 8 $750.00 $6,000.00 $300.00 $2,400.00 $1,000.00 $8,000.00 $225.00 $1,800.00 $2,500.00 $20,000.00
C31 Grout Existing Sanitary Main Joint EA 1 $800.00 $800.00 $700.00 $700.00 $750.00 $750.00 $300.00 $300.00 $2,000.00 $2,000.00
Project C Total: Items C1:C31 $330,415.00 $309,860.00 $307,562.50 $387,141.20 $466,755.00
PROJECT A, B AND C TOTAL $2,305,924.00 $2,030,348.00 $2,110,539.90 $2,502,541.60 $2,839,972.00
REQUEST FOR CONSIDERATION
Public Mtg/Date: Village Board – 9/9/2019
Description: Award Margaret Street Utility Project Engineering
Services Contract
From: Michael Wodalski, Director of Public Works
Josh Swenson, Utility Superintendent
Question: Should the Village Board approve the Margaret
Street Utility engineering services contract to MSA
for an estimated amount of $34,900.00?
Background
The Village of Weston owns and maintains the water and sanitary sewer infrastructure
within the project area in the Village of Rothschild. Bids for the project were opened on
August 20, 2019 and construction will be starting in the next few weeks.
The Village of Rothschild is contracting with MSA Professional Services, Inc. to provide
construction services. Since MSA designed the project and is already going to be
onsite to oversee the work related to the Village of Rothschild, staff recommends that
the Village of Weston approve the contract with MSA to oversee the utility work as well.
The estimated cost for engineering services is 10.1% of the construction costs and a
general rule is these costs are typically in the 10%-12% range which this contract is
within.
The overall CIP estimate for the project was $441,258, the total costs after bids and
with design and construction services the revised estimated total is $405,678 which is
$35,580 under budget.
Attached Docs: Contract with MSA
______________________________________________________________________
Committee Action: Previously approved design contract with MSA.
Fiscal Impact: Original CIP cost was estimated at $441,258 for total
project costs, revised estimate is $405,678 after bid and
with professional services contracts on hand.
_______________ ___________________________________________________________
Recommendation: Staff recommendation is to award the project to MSA for
an amount of $34,900.
Recommended Language for Official Action
I Move to approve the Margaret Street Utility Project Engineering Services
Contract with MSA for a bid price of $34,900
Or, Something else
_____________________________________________________________________
Additional action:
REQUEST FOR CONSIDERATION
PAGES 1 OF 1
Amendment
No. 1
To: Village of Weston Date of Issuance: August 20, 2019
Barbara Ermeling
5500 Schofield Avenue MSA Project No.: 09366014
Weston, WI 54476
This is an amendment to the Agreement dated September 9, 2019 and does acknowledge that
MSA Professional Services, Inc. (MSA) is authorized to begin work on the following project
amendment:
Project Name: Village of Weston - Margaret Street Reconstruction Water & Sewer
The project scope has changed due to: Construction Administration and Observation Services
The scope of the work authorized is: See Attachment A
The schedule to perform the work is: Approximate Start: September 2019
Approximate Completion: July 2020
The lump sum fee for the work is: Construction Administration $14,900 (Lump Sum)
Construction Observation $20,000 (T&M)
Total $34,900
Authorization for the work described above shall amend the Agreement between MSA and
OWNER. Any attachments or exhibits referenced in this Amendment are made part of the
Agreement. Payment for these services will be on a lump sum basis or time and material basis
as indicated above.
Approval: MSA shall commence work on this project in accordance with your written
authorization. This authorization is acknowledged by signature of the authorized
representatives of the parties to this Amendment. A copy of this Amendment signed by the
authorized representatives shall be returned for our files. If a signed copy of this Authorization
is not received by MSA within seven days from the date of issuance, MSA may stop work on the
project.
VILLAGE OF WESTON MSA PROFESSIONAL SERVICES, INC.
Wally Sparks Daniel Borchardt
Village President Team Leader
Date: Date: 8/22/19
Attest: City/Township/Village Clerk 146 North Central Ave., Suite 201
Marshfield, WI 54449
Phone: +1 (715) 304-0448
Clerk Name: Fax: (715) 384-9787
Date:
5500 Schofield Avenue
Weston, WI 54476
Phone: 715-359-2876
Page 1 of 1
G:\09\09366\09366014\Contract\Amendment 1 -Construction Services\09366014 Amend 1 08-21-19.docx
Attachment A
Scope of Services
CONSTRUCTION PHASE – SCOPE OF SERVICES
Construction Administration
1. Project Administration: Manage and coordinate project team, budget and schedules, maintain
communication with Owner and stakeholders on the project.
2. Contractor Communication: Respond to contractor requests for information and assist in
interpretation of the contract documents in person, in writing, or by telephone.
3. Coordinate and facilitate preconstruction meeting and minutes documenting the meeting.
4. Submittal Review: Review contractor shop drawings, submittals, schedules and samples for
compliance with the construction documents.
5. Provide line and grade construction staking for sanitary sewer, watermain, watermain offsets,
hydrant relocations.
6. Applications for Payment: Review Contractor applications for payment; make payment
recommendation to the owner as appropriate.
7. Change Orders: Review change order requests from contractor; recommend change orders to
owner as appropriate.
8. Meetings: attend meetings of Owner board/Council/Committee for processing pay applications,
change orders and construction updates - three (3).
9. Facilitate Bi-weekly project progress meetings in conjunction with Rothschild progress meetings
for the duration of the project - ten (10).
10. Project Closeout: Prepare Punchlist (items to be completed or corrected) and substantial
completion certificate. Review contractor work and completion documents for compliance with
construction contract and readiness for final payment. This will include a project walk through
with Village, Contractor and MSA.
11. Prepare record drawings and provide to Village.
Construction Observation
Provide full time construction observation throughout construction of the project. Estimated 265
hours for Resident Project Representative for 20 days at approximately 10 hours/day.
Note: all lump sum costs include travel time and equipment costs.
Amend. 1 Attachment A
Scope of Services
ATTACHMENT A:
RATE SCHEDULE
CLASSIFICATION LABOR RATE
Architects .......................................................................................... $111 – $170/hr.
Clerical .............................................................................................. $ 55 – $110/hr.
CAD Technician ................................................................................ $ 65 – $125/hr.
Geographic Information Systems (GIS)............................................. $ 94 – $138/hr.
Housing Administration ..................................................................... $ 68 – $115/hr.
Hydrogeologists ................................................................................ $114 – $147/hr.
Planners ............................................................................................ $ 89 – $160/hr.
Principals........................................................................................... $180 – $250/hr.
Professional Engineers ..................................................................... $ 85 – $153/hr.
Project Manager ................................................................................ $ 85 – $180/hr.
Professional Land Surveyors ............................................................ $ 79 – $160/hr.
Staff Engineers.................................................................................. $ 74 – $144/hr.
Technicians ....................................................................................... $ 65 – $125/hr.
Wastewater Treatment Plant Operator.............................................. $ 72 – $ 92/hr.
REIMBURSABLE EXPENSES
Copies/Prints................................................................................Rate based on volume
Fax ...............................................................................................$1.00/page
GPS Equipment ...........................................................................$40/hour
Mailing/UPS .................................................................................At cost
Mileage – Automobile ($0.545/mile) ................................................Rate set by Fed. Gov.
Mileage – MSA Truck ...................................................................$0.70/mile
Nuclear Density Testing ...............................................................$25.00/day + $10/test
Organic Vapor Field Meter ...........................................................$100/day
PC/CADD Machine.......................................................................Included in labor rates
Stakes/Lath/Rods .........................................................................At cost
Total Station .................................................................................Included in labor rates
Travel Expenses, Lodging, & Meals .............................................At cost
Traffic Counting Equipment & Data Processing ...........................At cost
Trimble Geodimeter......................................................................$30/hour
* Labor rates represent an average or range for a particular job classification. These rates are in effect until
January 1, 2020.
Page 1 of 1
(Attachment A: MSA Standard Rate Schedule)
G:\09\09366\09366014\Contract\Amendment 1 -Construction Services\RATE SCHEDULE.docx
REQUEST FOR CONSIDERATION
Public Mtg/Date: Village Board – 9/9/2019
Description: Award Zinser Street Utility Project (South of Weston
Ave) Construction Contract
From: Michael Wodalski, Director of Public Works
Josh Swenson, Utility Superintendent
Question: Should the Village Board award the Zinser Street
Utility Project (South of Weston Ave) construction
contract to Jake’s Excavating & Landscaping LLC
for a Bid Amount of $196,909.75?
Background
The Zinser St Utility Project (South of Weston Ave) was bid on Wednesday, August 28.
There were 8 total bidders and the lowest bidder was Jake’s Excavating & Landscaping
LLC with a bid of $196,909.75.
With the bid result and costs for design and construction services, total project costs
end up being $222,509.75. This is $15,509.75 more than the CIP estimate of $207,000.
However, with other projects coming in under budget, overall the CIP is still projecting to
be under budget.
Attached Docs: Recommendation Letter from Becher Hoppe and Bid Tab
______________________________________________________________________
Committee Action: Previously approved design contract with Becher Hoppe
and Special Assessments.
Fiscal Impact: Original CIP cost was estimated at $207,000 for total project
costs, revised estimate is $222,509.75 after bid and with
professional services contracts on hand.
_______________ ___________________________________________________________
Recommendation: Staff recommendation is to award the project to Jake’s
Excavating & Landscaping LLC for a bid amount of
$196,909.75.
Recommended Language for Official Action
I Move to award the Zinser Street Utility Project (South of Weston Ave)
Construction Contract to Jake’s Excavating & Landscaping LLC for a bid price
of $196,909.75.
Or, Something else
_____________________________________________________________________
Additional action:
REQUEST FOR CONSIDERATION
PAGES 1 OF 1
September 3, 2019
Mr. Michael Wodalski
Director of Public Works
Village of Weston
5500 Schofield Avenue
Weston, WI 54476 Email
Subject: Zinser Street Utility Extension – Notice of Award recommendation
Dear Michael:
Enclosed herewith is the Bid Summary for the project. Eight bids were received, and
Jake’s Excavating & Landscaping LLC is the lowest bidder.
We recommend awarding the project to Jake’s Excavating & Landscaping LLC in the
amount of $196,909.75. If you concur, please sign the enclosed Notice of Award and
return to me. We will issue the Award Notice and prepare the contract documents.
The eight original bids are enclosed for your records.
Sincerely,
Matthew R. Patterson, PE
Project Engineer
MRP/lll
Enclosures
cc: Josh Swenson, Village of Weston– via email
Joe Kafczynski, Becher Hoppe Associates– via email
P:\2019\2019.025 - V of Weston - Zinser Street Utility Ext\Bidding\06 Bid Results\2019.025ltr award recommendation 190803.docx
Bid Summary - AS-READ RESULTS
Village of Weston
Zinser Street Utility Extension
2019.025.00
Contractor Bid Amount
A-1 Excavating $229,185.00
Earth, Inc. $249,927.50
Haas Sons $244,220.50
Jake's Excavating & $196,909.75
Landscaping
Kruczek Construction $253,253.00
McCabe Construction & $200,534.15
Construction
Merrill Gravel $217,686.45
Switlick & Sons $261,592.00
SECTION 00 51 00
NOTICE OF AWARD
Date of Issuance:
Owner: Village of Weston, WI Owner's Contract No.:
Engineer: Becher-Hoppe Associates, Inc. Engineer's Project No.: 2019.025.00
Project: Zinser Street Utility Extension Contract Name:
Bidder: Jake’s Excavating & Landscaping LLC
Bidder’s Address: N10633 Lake Road, Ironwood MI 49938
TO BIDDER:
You are notified that Owner has accepted your Bid dated August 22, 2019 for the above Contract, and that
you are the Successful Bidder and are awarded a Contract for:
Zinser Street Utility Extension.
The Contract Price of the awarded Contract is: $ 196,909.75, subject to unit pricing.
Three unexecuted counterparts of the Agreement accompany this Notice of Award, and one copy of the
Contract Documents accompanies this Notice of Award, or has been transmitted or made available to
Bidder electronically.
a set of the Drawings will be delivered separately from the other Contract Documents.
You must comply with the following conditions precedent within 15 days of the date of receipt of this Notice
of Award:
1. Deliver to Owner three counterparts of the Agreement, fully executed by Bidder.
2. Deliver with the executed Agreement(s), the Contract security and insurance documentation as
specified in the Instructions to Bidders and General Conditions, Articles 2 and 6.
3. Other conditions precedent (if any):
Failure to comply with these conditions within the time specified will entitle Owner to consider you in default,
annul this Notice of Award, and declare your Bid security forfeited.
Within ten days after you comply with the above conditions, Owner will return to you one fully executed
counterpart of the Agreement, together with any additional copies of the Contract Documents as indicated in
Paragraph 2.02 of the General Conditions.
Owner:
Authorized Signature
By:
Title:
Copy: Engineer
END OF SECTION 00 51 00
EJCDC® C-510, Notice of Award.
Prepared and published 2013 by the Engineers Joint Contract Documents Committee.
Page 00 51 00-1
REQUEST FOR CONSIDERATION
Public Mtg/Date: Village Board – 9/9/2019
Description: Award Zinser Street Utility Project (South of Weston
Ave) Engineering Services Contract
From: Michael Wodalski, Director of Public Works
Josh Swenson, Utility Superintendent
Question: Should the Village Board award the Zinser Street
Utility Project (South of Weston Ave) Engineering
Services contract to Becher Hoppe for an estimated
amount of $13,000?
Background
The Zinser St Utility Project (South of Weston Ave) was designed by Becher Hoppe
earlier this summer. The project was bid on Wednesday, August 28 and the low
bidder’s construction cost is $196,909.75. The proposed engineering services cost of
$13,000 is 6.6% of construction costs. Generally, it is expected that engineering
services be 10-12% of construction costs which this contract is about half of.
With the bid result and costs for design and construction services, total project costs
end up being $222,509.75. This is $15,509.75 more than the CIP estimate of $207,000.
However, with other projects coming in under budget, overall the CIP is still projecting to
be under budget.
Attached Docs: Contract Amendment with Becher Hoppe
______________________________________________________________________
Committee Action: Previously approved design contract with Becher Hoppe
Fiscal Impact: Original CIP cost was estimated at $207,000 for total project
costs, revised estimate is $222,509.75 after bid and with
professional services contracts on hand.
_______________ ___________________________________________________________
Recommendation: Staff recommendation is to approve the engineering
services contract with Becher Hoppe estimated at $13,000
Recommended Language for Official Action
I Move to approve the Zinser Street Utility Project (South of Weston Ave)
Engineering Services Contract with Becher Hoppe estimated at $13,000.
Or, Something else
____________________________________________________________________
_ Additional action:
REQUEST FOR CONSIDERATION
PAGES 1 OF 1
AUTHORIZATION FOR ADDITIONAL SERVICES
This document is a supplement to the original Agreement between Becher-Hoppe Associates, Inc. and the
Client listed below.
Client Name: Village of Weston
Client Address: 5500 Schofield Avenue, Weston WI
Project Name: Zinser Street Utility Extension
Project Number: 2019.025.00
Original Agreement Date: 5/20/19
Description of Additional Services:
1. Construction Administration Services – Lump Sum
i. Prepare the contract documents between Contractor and Village.
ii. Schedule and conduct a preconstruction meeting and distribute meeting minutes to
attendees.
iii. Coordinate and conduct weekly construction progress meetings. Distribute meeting
minutes to attendees.
iv. Conduct periodic visits to the job site to review the progress and quality of the work
being performed.
v. Monitor work performance for conformance with construction schedule, specification,
and job requirements. Report regularly to the Village.
vi. Interpretation of the plans, specifications, and other contract documents as required.
vii. Review and process all required shop drawings.
viii. Review and approve substitution requests, respond to Requests for Information, and
assistance in preparation of any necessary change orders.
ix. Process contract change order requests as required. However, contract change orders
will be first verified with Village Officials prior to preparation. It is the intent of the Village
that change orders will be minimized to the extent practical.
x. Process/coordinate warranty documentation on behalf of the Village.
xi. Preparation of record drawings (as-builts) of the completed facilities in accordance with
the Village’s standard requirements.
xii. Perform one-year warranty inspection with Village staff and Contractor.
xiii. The Construction Management Phase will be considered complete upon Village’s
acceptance of completed improvements, Contractor’s contract closeout, and
acceptance of any record drawings.
xiv. Prepare a construction binder consisting of project photos, the project manual and plans,
bids, measurements of items, truck tickets, material certifications, shop drawings,
change orders, pay requests, inspectors field book, record drawings. Deliverables
include a hard copy binder and a .PDF digital copy.
P:\2019\2019.025 - V of Weston - Zinser Street Utility Ext\Admin\Contracts - Working\2019.025 Additional Services Agreement Zinser
Construction Services 190828.docx
2. Resident Project Representative (RPR) – Time and Expenses per Hourly Rate
i. Conduct periodic visits to the job site to generally review the progress and quality
of the work being performed. Minimum site visits include:
1) Preconstruction Meeting
2) Construction Startup
3) Water and Sewer Main Excavation, Installation, and Performance Testing
4) Preparation of Roadway Foundation
5) Roadway Surfacing
6) Final Walkthrough with Owner and Contractor
3. Construction Staking – Time and Expenses per Hourly Rate
i. Prepare staking data
ii. Line and grade staking for water main, sanitary sewer main, and roadway
Basis and Amount of Additional Compensation:
Lump Sum, Expenses Included (Administration) $2,000
Time and Expenses Per Hourly Rates (RPR) $8,000
Time and Expenses Per Hourly Rates (Staking) $3,000
Fixed Fee Plus Expenses $
Other: $
Additional Services as listed above will proceed upon return of a fully executed authorization.
___________________________________ President_______________________ August 28, 2019 _
Becher-Hoppe Associates, Inc. Signature Title Date
___________________________________ _____________________________ ____________________
Client Approval Signature Title Date
Return to: llee@becherhoppe.com
P:\2019\2019.025 - V of Weston - Zinser Street Utility Ext\Admin\Contracts - Working\2019.025 Additional Services Agreement Zinser
Construction Services 190828.docx
REQUEST FOR CONSIDERATION
PUBLIC MTG/DATE: BOARD OF TRUSTEES, SEPTEMBER 9, 2019
DESCRIPTION: DENY OPERATOR LICENSE FOR TERA BRANDT
FROM: SARAH FLORY- DEPUTY CLERK
QUESTION: SHOULD THE BOARD OF TRUSTEES DENY THE OPERATOR LICENSE FOR TERA
BRANDT?
BACKGROUND
THE POLICE DEPARTMENT COMPLETED A BACKGROUND CHECK FOR TERA BRANDT. AFTER REVIEWING THIS
INFORMATION CHIEF SCHULTZ RECOMMENDS DENIAL OF HER LICENSE: FELONY OWI 5TH OR 6TH TIME.
ATTACHED DOCS: Evolve Report
COMMITTEE ACTION: N/A
FISCAL IMPACT: NONE
RECOMMENDATION: CLERK RECOMMENDS DENIAL
RECOMMENDED LANGUAGE FOR OFFICIAL ACTION
I MOVE TO DENY THE OPERATOR LICENSE FOR TERA BRANDT.
ADDITIONAL ACTION: MAIL OUT DENIAL LETTER.
VILLAGE OF WESTON
5500 SCHOFIELD AVENUE, WESTON, WI 54476
BOT Date 09/02/2019
License License Type Name Business Premise Desc Begin Dt End Dt EMPD CLPS BOT
ID Approval
9010 - Bartender/Operator New
18747 9010 - Bartender/Operator Brandt, Tera Big Dan & Space's 07/01/2019 06/30/2020 No
New Kelly Club
19018 9010 - Bartender/Operator Chapman, Leah M Kwik Trip #986 07/01/2019 06/30/2020 Yes
New
18997 9010 - Bartender/Operator Firnstahl, Macy C Kwik Trip #986 07/01/2019 06/30/2020 Yes
New
18934 9010 - Bartender/Operator Gresen, Cody Tyler Brews Brothers Pub 07/01/2019 06/30/2020 Yes
New
18849 9010 - Bartender/Operator Grubbs, Sharie G The Palms Supper 07/01/2019 06/30/2020 Yes
New Club
18976 9010 - Bartender/Operator Kaetterhenry, Kwik Trip #986 07/01/2019 06/30/2020 Yes
New Margaret A
19002 9010 - Bartender/Operator Kreger, Noah K Dales Weston Lanes 07/01/2019 06/30/2020 Yes
New
18988 9010 - Bartender/Operator Lloyd, Kimberly A Kwik Trip #356 07/01/2019 06/30/2020 Yes
New
19040 9010 - Bartender/Operator Magnuson, Alison New Business 07/01/2019 06/30/2020 Yes
New
18973 9010 - Bartender/Operator McKibben, Alexandria Kwik Trip #986 07/01/2019 06/30/2020 Yes
New G
19024 9010 - Bartender/Operator Morris, Joni L Becca's Cafe 07/01/2019 06/30/2020 Yes
New
19023 9010 - Bartender/Operator Morris, Julie Kwik Trip #986 07/01/2019 06/30/2020 Yes
New
19037 9010 - Bartender/Operator Pilsner, Jodi Kwik Trip #986 07/01/2019 06/30/2020 Yes
New
18971 9010 - Bartender/Operator Potter, Matthew C Brews Brothers Pub 07/01/2019 06/30/2020 Yes
New
19027 9010 - Bartender/Operator Przybylski, Lisa M. Kwik Trip #986 07/01/2019 06/30/2020 Yes
New
19009 9010 - Bartender/Operator Radun, Rebecca L Kwik Trip #986 07/01/2019 06/30/2020 Yes
New
19026 9010 - Bartender/Operator Rice, Carla C Kwik Trip #986 07/01/2019 06/30/2020 Yes
New
19039 9010 - Bartender/Operator Salisbury, Megan Brews Brothers Pub 07/01/2019 06/30/2020 Yes
New Marie
REQUEST FOR CONSIDERATION
PUBLIC MTG/DATE: BOARD OF TRUSTEES, SEPTEMBER 9, 2019
DESCRIPTION: OPERATOR LICENSES
FROM: SARAH FLORY, DEPUTY CLERK
QUESTION: SHOULD THE BOARD OF TRUSTEES APPROVE LICENSE FOR: LEAH CHAPMAN, MACY
FIRNSTAHL, TYLER GRESEN, SHARIE GRUBBS, MARGARET KAETTERHENRY, NOAH
KREGER, KIMBERLY LLOYD, ALISON MAGNUSON, ALEXANDRIA MCKIBBEN, JONI
MORRIS, JULIE MORRIS, JODI PILSNER, MATTHEW POTTER, LISA PRZYBYLSKI,
REBECCA RADUN, CARLA RICE, MEGAN SALISBURY, TORI FREDRICK, DONNA
STANKOWSKI, MAGGIE WHITE?
BACKGROUND
OPERATOR LICENSE APPLICATIONS WERE RECEIVED FOR: LEAH CHAPMAN, MACY FIRNSTAHL,TYLER
GRESEN, SHARIE GRUBBS, MARGARET KAETTERHENRY, NOAH KREGER, KIMBERLY LLOYD, ALISON
MAGNUSON, ALEXANDRIA MCKIBBEN, JONI MORRIS, JULIE MORRIS, JODI PILSNER, MATTHEW POTTER,
LISA PRZYBYLSKI, REBECCA RADUN, CARLA RICE, MEGAN SALISBURY, TORI FREDRICK, DONNA
STANKOWSKI, MAGGIE WHITE AND SUBMITTED TO THE EVEREST METRO POLICE CHIEF FOR BACKGROUND
CHECKS. ALL APPLICANTS WERE GIVEN A PROVISIONAL LICENSE. CHIEF SCHULTZ COMPLETED
BACKGROUND CHECKS AND RECOMMENDS APPROVAL OF THE REGULAR LICENSES FOR ALL APPLICANTS.
THE APPLICANTS HAVE MET THE QUALIFICATIONS TO HOLD OPERATOR LICENSES IN THE VILLAGE OF
WESTON.
ATTACHED DOCS: EVOLVE REPORT
COMMITTEE ACTION: N/A
FISCAL IMPACT: NONE
RECOMMENDATION: CLERK RECOMMENDS APPROVAL
RECOMMENDED LANGUAGE FOR OFFICIAL ACTION
I MOVE TO APPROVE THE OPERATOR LICENSES: LEAH CHAPMAN, MACY FIRNSTAHL,TYLER GRESEN,
SHARIE GRUBBS, MARGARET KAETTERHENRY, NOAH KREGER, KIMBERLY LLOYD, ALISON MAGNUSON,
ALEXANDRIA MCKIBBEN, JONI MORRIS, JULIE MORRIS, JODI PILSNER, MATTHEW POTTER, LISA
PRZYBYLSKI, REBECCA RADUN, CARLA RICE, MEGAN SALISBURY, TORI FREDRICK, DONNA STANKOWSKI,
MAGGIE WHITE.
ADDITIONAL ACTION: MAIL OUT APPROVED LICENSES.
VILLAGE OF WESTON
5500 SCHOFIELD AVENUE, WESTON, WI 54476
BOT Date 09/02/2019
License License Type Name Business Premise Desc Begin Dt End Dt EMPD CLPS BOT
ID Approval
9010 - Bartender/Operator New
18747 9010 - Bartender/Operator Brandt, Tera Big Dan & Space's 07/01/2019 06/30/2020 No
New Kelly Club
19018 9010 - Bartender/Operator Chapman, Leah M Kwik Trip #986 07/01/2019 06/30/2020 Yes
New
18997 9010 - Bartender/Operator Firnstahl, Macy C Kwik Trip #986 07/01/2019 06/30/2020 Yes
New
18934 9010 - Bartender/Operator Gresen, Cody Tyler Brews Brothers Pub 07/01/2019 06/30/2020 Yes
New
18849 9010 - Bartender/Operator Grubbs, Sharie G The Palms Supper 07/01/2019 06/30/2020 Yes
New Club
18976 9010 - Bartender/Operator Kaetterhenry, Kwik Trip #986 07/01/2019 06/30/2020 Yes
New Margaret A
19002 9010 - Bartender/Operator Kreger, Noah K Dales Weston Lanes 07/01/2019 06/30/2020 Yes
New
18988 9010 - Bartender/Operator Lloyd, Kimberly A Kwik Trip #356 07/01/2019 06/30/2020 Yes
New
19040 9010 - Bartender/Operator Magnuson, Alison New Business 07/01/2019 06/30/2020 Yes
New
18973 9010 - Bartender/Operator McKibben, Alexandria Kwik Trip #986 07/01/2019 06/30/2020 Yes
New G
19024 9010 - Bartender/Operator Morris, Joni L Becca's Cafe 07/01/2019 06/30/2020 Yes
New
19023 9010 - Bartender/Operator Morris, Julie Kwik Trip #986 07/01/2019 06/30/2020 Yes
New
19037 9010 - Bartender/Operator Pilsner, Jodi Kwik Trip #986 07/01/2019 06/30/2020 Yes
New
18971 9010 - Bartender/Operator Potter, Matthew C Brews Brothers Pub 07/01/2019 06/30/2020 Yes
New
19027 9010 - Bartender/Operator Przybylski, Lisa M. Kwik Trip #986 07/01/2019 06/30/2020 Yes
New
19009 9010 - Bartender/Operator Radun, Rebecca L Kwik Trip #986 07/01/2019 06/30/2020 Yes
New
19026 9010 - Bartender/Operator Rice, Carla C Kwik Trip #986 07/01/2019 06/30/2020 Yes
New
19039 9010 - Bartender/Operator Salisbury, Megan Brews Brothers Pub 07/01/2019 06/30/2020 Yes
New Marie
BOT Date 09/02/2019
License License Type Name Business Premise Desc Begin Dt End Dt EMPD CLPS BOT
ID Approval
18994 9010 - Bartender/Operator Stankowski, Donna M Commerce Crossing 07/01/2019 06/30/2020 Yes
New
18964 9010 - Bartender/Operator White, Maggie L Brews Brothers Pub 07/01/2019 06/30/2020 Yes
New
BOT Date 09/02/2019
License License Type Name Business Premise Desc Begin Dt End Dt EMPD CLPS BOT
ID Approval
9011 - Bartender/Operator
18082 9011 - Bartender/Operator Fredrick, Tori E The Store #60 07/01/2019 06/30/2020 Yes
REQUEST FOR CONSIDERATION
PUBLIC MTG/DATE: BOARD OF TRUSTEES, SEPTEMBER 9, 2019
DESCRIPTION: NEW CIGARETTE LICENSE FOR KWIK TRIP #986
FROM: SARAH FLORY, DEPUTY CLERK
QUESTION: SHOULD THE BOARD OF TRUSTEES APPROVE THE CIGARETTE LICENSE FOR KWIK
TRIP #986 FOR THE 2019/2020 LICENSING TERM?
BACKGROUND
VILLAGE STAFF RECEIVED THE ATTACHED NEW CIGARETTE LICENSE APPLICATION FOR KWIK TRIP #986
4103 BARBICAN AVE. WESTON, WI 54476.
ATTACHED DOCS: EVOLVE REPORT
COMMITTEE ACTION: N/A
FISCAL IMPACT: NONE
RECOMMENDATION: CLERK RECOMMENDS APPROVAL
RECOMMENDED LANGUAGE FOR OFFICIAL ACTION
I MOVE TO APPROVE THE CIGARETTE LICENSE FOR KWIK TRIP #986 4103 BARBICAN AVE.
WESTON WI 54476.
ADDITIONAL ACTION: MAIL OUT APPROVED LICENSES.
VILLAGE OF WESTON
5500 SCHOFIELD AVENUE, WESTON, WI 54476
BOT Date 08/19/2019
License License Type Name Business Premise Desc Begin Dt End Dt EMPD CLPS BOT
ID Approval
9034 - Cigarette
19034 9034 - New Cigarette Diethelm, Jamie Dana Kwik Trip #986 07/01/2019 06/30/2020
Total Licenses 11
REQUEST FOR CONSIDERATION
PUBLIC MTG/DATE: BOARD OF TRUSTEES, SEPTEMBER 9, 2019
DESCRIPTION: NEW W EIGHTS & MEASURES LICENSE FOR 2019/2020 LICENSING TERM FOR:
KWIK TRIP #986, 4103 BARBICAN AVE. W ESTON, WI 54476
FROM: SARAH FLORY- DEPUTY CLERK
QUESTION: SHOULD THE BOARD OF TRUSTEES APPROVE THE NEW W EIGHTS & MEASURES
LICENSE FOR KWIK TRIP #986 FOR THE 2019/2020 LICENSING TERM?
BACKGROUND
THE ATTACHED NEW WEIGHTS & MEASURES APPLICATION AND FEES WERE PROCESSED BY STAFF. THE
VILLAGE PAYS THE STATE FOR THE SERVICES OF THE STATE INSPECTOR. THE LICENSING FEES THAT ARE
COLLECTED BY THE VILLAGE ARE USED TO PAY THE STATE FOR THE SERVICES PROVIDED BY THEIR
INSPECTOR.
ATTACHED DOCS: Evolve Report
COMMITTEE ACTION: N/A
FISCAL IMPACT: NONE
RECOMMENDATION: CLERK RECOMMENDS APPROVAL
RECOMMENDED LANGUAGE FOR OFFICIAL ACTION
I MOVE TO APPROVE THE NEW WEIGHTS & MEASURES LICENSE FOR THE 2019/2020
LICENSING TERM FOR KWIK TRIP #986, 4103 BARBICAN AVE WESTON WI 54476.
ADDITIONAL ACTION: MAIL OUT LICENSES.
VILLAGE OF WESTON
5500 SCHOFIELD AVENUE, WESTON, WI 54476
BOT Date 09/02/2019
License License Type Name Business Premise Desc Begin Dt End Dt EMPD CLPS BOT
ID Approval
9074 - Weights and Measures New
18954 9074 - Weights and Diethelm, Jamie Dana Kwik Trip #986 07/01/2019 06/30/2020
Measures New
Total Licenses 23